Search ▸ Communication to the City Council
a presentation titled Central Square City Lots Study
CENTRAL SQUARE CITY LOTS STUDY
CITY COUNCIL ROUNDTABLE
November 13, 2023
AGENDA
1. Welcome & Introductions
2. Project Overview (10 min)
○Study Purpose and Overview
○Summary of Engagement So Far
3. 10 Project Sites (15 min)
○Leverage the potential of large, city-owned sites
○Bring new life to existing buildings
○Activate and infill existing lots
4. Preliminary Options (5 min)
5. Next Steps (2 min)
PROJECT OVERVIEW
“Central Square Lots” Study Process
Municipal parking lots
represent one of the greatest
opportunities for realizing a
vision for Central Square
- K2C2 Central Square
report
Promote redevelopment
that is mixed-use,
pedestrian-oriented, and
sustainable within surface
parking lots
- Envision Cambridge
Mixed use
buildings with
housing and
ground floor retail
Creation of a
public market
Creation of more
public open space
Central Square has a lot of
what might be called “dead
or bland space”.
- Central Squared Red
Ribbon Report
Build on & confirm past
discussions
Test what’s
feasible
Recommend
possible steps
Technical Site
Assessments
Parking analysis
“Test-fits”
Preferred options
Phasing
Considerations
Changes likely to
occur over 10+
years
LONG-TERM FLEXIBLE APPROACH
●These changes won’t all happen at once! This work presents a suite of
possibilities that will likely occur over 10+ years and it will be important to re-
evaluate changing needs over time
●A phased approach can respond to new construction technologies, funding
opportunities, and transportation demand management
●Economic costs & considerations will be an important part of future
conversations
What comes first
Creates new opportunities
and closes down others
Final evolution of the 10 sites
could follow many paths
PROJECT OVERVIEW
Intent: Support the City to understand how to best use its own assets (10 sites encompassing
both land and buildings) to realize community goals and support City operations
City Affiliated
Properties
Central Square City Lots
Study Area
Central Square City Lots
3 Bigelow St
260 Green St / 45 Pearl St
689 Mass Ave
205 Western Ave
105 Windsor St
PROJECT SITES - Buildings
PROJECT SITES - Lots
38 Bishop Allen Dr
84 Bishop Allen Dr
96 Bishop Allen Dr
9 Pleasant St
375 Green St
TECHNICAL SITE ASSESSMENTS
Mapping & Summary Statistics
Through interviews, research, and site visits, we are working on
technical assessments for each of the project sites.
Site Conditions
Site History
Building Use
Parking Inventory & Utilization
Environmental Conditions
COMMUNITY ENGAGEMENT
COMMUNICATION
MATERIALS
FOCUS GROUPS &
INTERVIEWS
POP-UPS / SURVEY &
COMMUNITY MEETING
Project Website
Updates on Social Media
Flyering at local Central Square
businesses & community
centers/hubs
City Staff
Central Square BID
Central Square Advisory Committee
Small Businesses
August pop-ups
general project info, learn about community
needs
October 8th Open House
share preliminary findings & opportunities
Online survey form
CET Focus Groups
Senior Center
October 25th Virtual Open House
share preliminary findings & opportunities
Multi Service Center/C-CAN Client
Moses Youth Center Focus Group
UPCOMING
Arts & Culture
and more!
Future Community Meeting (TBD)
ENGAGEMENT EVENTS
75+
In-person pop-up
comments
85+
Online survey
form
comments
60+
In-person
attendees
700+
Voting Dots
October 8, 2023 Open House
October 25,
2023 Virtual
Open House
150
Online meeting
registrants
65+
Online meeting
participants
August 2023 Pop-up Events
Online Survey Form
Create more affordable housing
Expand parks, playgrounds, community gardens, plazas
Flexible arts/market space & performance spaces
Expand cultural amenities, spaces, museums
Improve the Library, community meeting spaces, learning spaces
Create a destination for supportive social services
Create small business incubators
Provide municipal offices & City meeting spaces
Parking
COMMUNITY FEEDBACK
Less frequent ideas
More frequent ideas
179
76
66
29
9
119
86
86
94
FOCUS GROUPS
10+
Focus groups
●Community Engagement Team (Member
Focus Group)
●CET Resident Focus Group
●Small Business Focus Group
●Arts & Cultural Focus Group
●Senior Center Focus Group
●Cambridgeport Neighborhood Association
●Margaret Fuller House (scheduling follow-
up)
●City staff
●Multi Service Center/C-CAN Client Focus
Group - Unhoused community
●Moses Youth Center Focus
Group
Held So Far
Upcoming
DRAFT OBJECTIVES for city-owned land
●
Create more housing in Central Square, particularly affordable housing.
●
Accommodate cultural programs, events, and spaces.
●
Increase parks and open spaces.
●
Create high quality community services in Central Square.
●
Provide opportunities for social services to expand and co-locate.
●
Address city office and collaboration space needs.
●
Support ongoing infrastructure improvement projects.
●
Meet parking needs & include transportation demand management.
●
Plan for future opportunities to connect to adjacent private lots.
10 PROJECT SITES
1.Leverage the
potential of large
city-owned sites
SITE CONSIDERATIONS
●
Structural study suggests only 1-2
additional levels may be built on top
of existing garage and building.
●
Recent analysis shows the garage may
have capacity and is mostly used by
monthly parkers.
260 Green St
Cambridgeport
55,828
Site Area (sq ft)
257
Parking Spaces
C-3
Zoning District
4 2
Number of Stories
MIXED
Current Use
Garage Library
25,686 19,824
Gross Building Area (sq ft)
Garage Library
Parking Garage
SITE OPTIONS
●Improve the library
●Introduce significant
affordable housing units
●Maintain or expand
parking
●Demolish and rebuild or
renovate portions of the
building and expand
strategically
Highlights From Analysis and Input So Far
High-Density
Affordable
Housing
Expanded
Library
Park /
Playground
Mid-Density
Affordable
Housing
Cultural
Amenities /
Spaces
Parking
I would love to see
this use here!
I don’t want to see
this use here
260 Green St
260 Green Street
1 : Library Renovation
●
Preserve existing library and
expand up two floors
●
Demolish existing garage
●
Potential for 15 stories of housing
●
Basement, ground floor, plus two
levels of parking
●
Retail / active use on Pearl St
2: New Library
●
Demolish and replace Library and
Green Street garage
●
Expanded library or
office/community space in new
ground floor
●
Potential for 15 stories of housing
●
Basement, ground floor, plus two
levels of parking garage
305,460
GSF
135
Parking Spaces
140-150
Housing Units
0.12
Acres Open Space
359,600
GSF
185
Parking Spaces
180-200
Housing Units
0.12
Acres Open Space
SITE CONSIDERATIONS
●
H-Mart and other retailers rely on
nearby parking.
●
Buildings of up to 7 stories (80 feet)
are allowed by zoning; up to 15 stories
may be possible under the passed
Affordable Housing Overlay
amendment.
●
Important public realm considerations
include Graffiti Alley, current use as
Starlight Square, the Farmer’s Market,
and other events.
84 Bishop Allen Dr
(Lot 5)
N/A
Gross Building Area (sq ft)
33,715
Site Area (sq ft)
23
Parking Spaces
BB
Zoning District
N/A
Number of Stories
PARKING
Current Use
Parking
Lot 5
SITE OPTIONS
●Flexible arts and
marketplace uses
●Non-profit and
commercial space or
parking
●Affordable housing
Highlights From Analysis and Input So Far
Flexible Arts &
Market Space
Outdoor
Plaza
High-Density
Affordable
Housing
Mid-Density
Affordable
Housing
Small Business
Incubator
Parking
I would love to
see this use here!
I don’t want to see
this use here
84 Bishop Allen Dr
1 : Cultural Space
●
Standalone cultural programming
●
Links to Graffiti Alley and a potential future play
street on Norfolk
●
Maintains existing HMart parking and loading space
20,000
GSF
84 Bishop Allen Dr
23
Parking Spaces
0
Housing Units
0.0
Acres Open Space
HMART
GRAFFITI ALLEY
FUTURE PLAY
STREET
PARKING
INCUBATOR RETAIL SPACES
CENTRAL
OPEN
SPACE
272,500
GSF
80
Parking Spaces
170-180
Housing Units
0.0
Acres Open Space
2: Maximize Affordable
Housing
●
Up to 15 stories of affordable housing
●
Maintain access to HMart, Graffiti
Alley, and existing retail
●
Mix of public and resident parking
84 Bishop Allen Dr
CULTURAL /
PERFORMANCE
SPACE
4: Cultural Space with Office Above
●
Similar to at left, but three levels of office above cultural
programs, instead of residential above.
3 : Cultural Space with
Housing Above
●
Up to 15 stories of affordable
housing above retail and
performance space
●
South-facing outdoor plaza
●
Preserves access to HMart, Graffiti
Alley, and existing retail
●
One level of underground parking
CULTURAL /
PERFORMANCE
SPACE
203,000
GSF
80
Parking Spaces
120-130
Housing Units
0.11
Acres Open Space
CULTURAL /
PERFORMANCE
SPACE
117,700
GSF
80
Parking Spaces
0
Housing Units
0.11
Acres Open Space
SITE CONSIDERATIONS
●
Development is limited to certain
areas of the site due to underground
stormwater retention tanks and an
access easement granted to Market
Central for garage access and loading.
●
Only the middle section (~⅓) of the lot
is buildable in the future.
●
Surrounded by high density new
housing and retail.
38 Bishop Allen Dr
(Lot 6), The Port
N/A
Gross Building Area (sq ft)
27,799
Site Area (sq ft)
Unknown
Assessed Value
BB-CSQ
Zoning District
N/A
Number of Stories
40
Parking Spaces
Parking
Lot 6
Easements
Market Central Perpetual
Access/Loading Easement
City of
Cambridge
Parking Lot 6
Stormwater
Tank
Infrastructure
Parking
Lot 6
SITE OPTIONS
●High-density affordable
housing.
●Open space / public
plaza.
●Additional stormwater
retention storage.
Highlights! From Analysis and Input So Far
High-Density
Affordable
Housing
Community
Garden
Outdoor
Plaza
Park /
Playground
Cultural
Amenities /
Spaces
I would love to see
this use here!
I don’t want to see
this use here
Mid-Density
Affordable
Housing
38 Bishop Allen Dr
1 : Affordable Housing
●
Up to 8 stories of affordable housing shown
since structured parking is not feasible
●
Maintains utilities infrastructure and access
easement to Market Central garage
2 : Open Space
●
170’ x 170’ / 0.66 acres
●
Lawn: 80’ x 140’
●
500-1500 people in an event
●
20-30 tents + 5 trucks
3 : Maintain as Parking
40 spaces
38 Bishop Allen Dr
91,300
GSF
0
Parking Spaces
70-80
Housing Units
0
Acres Open Space
0.66
Acres Open Space
2. Bring new life to
existing buildings
SITE CONSIDERATIONS
●
The City recently acquired this
building with the approval to use it for
municipal uses.
●
The building has historic value and
limited expansion potential.
689 Massachusetts Ave
Mid-Cambridge
33,456
Gross Building Area (sq ft)
10,101
Site Area (sq ft)
$15,112,200
Assessed Value
BB-CSQ
Zoning District
3
Number of Stories
0
Parking Spaces
SITE OPTIONS
●City offices
●Community services
●Cultural spaces
●Relocation of the Central
Square Library branch
Highlights! From Analysis and Input So Far
Affordable
Housing
Small Business
Incubator
Cultural
Amenities/
Spaces
Community
Services / One-
Stop-Shop
Library
Relocation
Municipal
Offices
I would love to see
this use here!
I don’t want to see
this use here
689 Mass Ave
2 : Ground Floor Public
Uses with Offices
●
Stories above grade 3
●
Total building area (GSF) -
34,403 SF
●
Offices - 16,236 SF
●
Public Facing Use - 5,476 SF
●
Total Building Area (NSF) -
28,757 SF
689 Mass Ave
Office
Office
Office
Office
Public Facing
Use
Public Facing
Use
Office
Office
Office
Office
Classroom
Library
Library
Library
Office
Library
1 : Library with
Offices
●
Stories above grade 3
●
Total building area (GSF) -
34,403 SF
●
Total library ara (NSF)
(Level 01 & 02) - 15,315 SF.
260 Green Library NSF -
13,699 SF
●
Office - 6,248 SF
●
Total Building Area (NSF) -
28,757 SF
3 Bigelow St
Mid-Cambridge
6,386
Gross Building Area (sq ft)
5,175
Site Area (sq ft)
1869
Year Built
C-2B
Zoning District
3
Number of Stories
Vacant
Current Building
SITE CONSIDERATIONS
●
The building is vacant, requires
extensive renovations, and has
historic character.
●
Most recently used by the Department
of Human Services as transitional
housing.
●
Adjacent to Cambridge City Hall and
the Lombardi office building.
SITE OPTIONS
●Municipal offices
●Community / City
meeting spaces
●Renovate and expand
through a rear yard
addition
●Potential to combine
with adjacent City-owned
properties (Lombardi)
Highlights! From Analysis and Input So Far
Affordable
Housing
Community
Meeting
Spaces
Community
Services / One-
Stop-Shop
Municipal
Offices
Cultural
Amenities /
Spaces
City Meeting
Spaces
I would love to see
this use here!
I don’t want to see
this use here
3 Bigelow St
1 : Renovation + Expansion for Office Space
●
Demolition of existing non-historic rear addition and new
addition created to add space and make building accessible.
●
Original building renovated for municipal offices.
●
Additional development may be possible if building is
demolished and rebuilt
●
Stories above grade - 3
●
Total Building Area (GSF) - 3,036 SF
●
Total Addition Area (GSF) - 10,135 SF
●
Total Building Area (NSF) - 8,475 SF
3 Bigelow Street
Office
Office
Office
Building
Support
205 Western Ave
Riverside
4,280
Gross Building Area (sq ft)
5,258
Site Area (sq ft)
1993
Year Built
BA-3
Zoning District
2
Number of Stories
VACANT
Current Use
SITE CONSIDERATIONS
●
Building is vacant and requires
extensive renovations.
●
Does not have significant historic
value.
●
If demolished, the replacement
building may not be able to be as
large as is currently built due to
current zoning requirements for the
site.
SITE OPTIONS
●Renovate the existing
structure.
●Demolish and build a
new site or open space.
●Social services /
supportive house.
●Affordable Housing,
including home
ownership.
Highlights! From Analysis and Input So Far
Supportive
Housing
Affordable
Housing
Nonprofit
Offices / Social
Services
Cultural
Amenities /
Spaces
Small Business
Incubator
Community
Meeting Spaces
I would love to see
this use here!
I don’t want to see
this use here
205 Western Ave
1 : Adaptive Reuse for
Supportive Housing
●
Stories above grade - 3
●
Total Building Area (GSF) - 10,624 SF
●
Sleeping Pods - 1,010 SF
●
Offices - 440 SF
●
Total Building Area (NSF) - 5,700 SF
2 : Demolition and Redevelopment
for Affordable Housing
●
8 residential units
●
45’ height limit under affordable housing overlay
●
Building envelope is limited due to setbacks and
resulting building footprint is small and doesn’t yield
a high number of units
MECH.
AFFORDABLE
HOUSING
205 Western Ave
105 Windsor St
The Port
13,104
Gross Building Area (sq ft)
10,018
Site Area (sq ft)
1868
Year Built
C-1
Zoning District
2
Number of Stories
VACANT
Current Use
SITE CONSIDERATIONS
●
Located across from Newtowne Court
and near various nonprofit and health
providers.
●
Originally built as the Alphabet School,
the first public school in the Port.
Later uses included recreation
facilities, the Cambridge Health
Alliance and the Windsor House, a
Senior daycare facility.
●
Rear of site required for above ground
utilities.
SITE OPTIONS
●Museum or gallery/art
space
●Non-profit Services and
Offices
●Community Center and
Educational Spaces
●Health Center
Highlights! From Analysis and Input So Far
Learning
Spaces
Performance &
Artist Spaces
Community
Services /
Health Center
Community
Meeting Spaces
Museum
Small
Offices
I would love to see
this use here!
I don’t want to see
this use here
105 Windsor St
1 : Renovation for
Neighborhood-serving Spaces
●
Multi-purpose meeting spaces
●
Museum/library space
●
Classrooms/study spaces
●
Small offices
●
Stories above grade - 2
●
Total Building Area (GSF) - 12,888 SF
●
Total Building Area (NSF) - 11,590 SF
MULTI-PURPOSE
OFFICE
CLASSROOM
CLASSROOM
MECH.
MULTI
MULTI-PURPOSE
105 Windsor
3. Activate and
infill existing lots
SITE CONSIDERATIONS
●
Next to a building with an extensive
mural that fronts on Mass Ave.
●
Low open space access and potential
for flooding.
●
Zoning allows for full development of
the site.
375 Green St
(Lot 8), Riverside
N/A
Gross Building Area (sq ft)
6,436
Site Area (sq ft)
17
Parking Spaces
BB-CSQ
Zoning District
N/A
Number of Stories
Parking
Current Use
Parking
Lot 8
SITE OPTIONS
●Affordable housing
development
●Open Space / Pocket
Park
●Retain parking in the
near-term
Highlights! From Analysis and Input So Far
Affordable
Housing
Community
Garden
Small Business
Incubator
Outdoor Plaza /
Gathering Space
Performance
Space
Park /
Playground
I would love to see
this use here!
I don’t want to see
this use here
375 Green St
1: Redevelopment Potential for
Affordable Housing
●
40 units of affordable housing , 9 stories
●
Retail / active use on ground floor
●
No parking provide; loss of existing
parking spaces
●
No open space requirement
●
2: Open Space / Pocket Park
(Explored in Tandem with 9
Pleasant St)
●
Two new pocket parks, connected by street
and crossing improvements
●
375 Green: 55’ x 90’ / 0.11 acre
●
9 Pleasant: 60’ x 100’ / 0.14 acre
51,750
GSF
0
Parking Spaces
40
Housing Units
0.0
Acres Open Space
0
GSF
0
Parking Spaces
0
Housing Units
0.25
Acres Open Space
375 Green Street
AHO
6 Stories
Retail
SITE CONSIDERATIONS
●
Located across from the US Post
Office building and surrounded by
public and private parking lots.
●
Low open space access.
●
Future buildings could be up to 85 tall,
but have setback requirements and a
15% open space requirement that
limit development opportunities.
9 Pleasant St
(Lot 9), Riverside
N/A
Gross Building Area (sq ft)
7,449
Site Area (sq ft)
17
Parking Spaces
C-2
Zoning District
N/A
Number of Stories
PARKING
Current Use
Parking
Lot 9
SITE OPTIONS
●Small affordable
housing development
●Open Space / Pocket
Park
●Retain parking in the
near-term
Highlights! From Analysis and Input So Far
Affordable
Housing
Park /
Playground
Community
Garden
Small Business
Incubator
Performance &
Artist Spaces
Outdoor
Plaza
I would love to see
this use here!
I don’t want to see
this use here
9 Pleasant St
1: Redevelopment Potential for
Affordable Housing
●
11 affordable units, 4 stories
●
Setbacks and open space requirements yield a
small developable footprint
●
Ground floor taken up by lobby and circulation;
limited opportunity for retail
●
Open space in the rear yard
●
No parking provided, loss of existing parking spaces
2: Open Space / Pocket Park (Explored in Tandem
with 9 Pleasant St)
●
8-10 retail incubator spaces over 2 floors, 6-10 tents + 3 food trucks,
300 person flexible event space
●
Accommodates the complete existing Starlight Square program across
two smaller lots
●
Potential to be tied to broader intersection and Green St improvements
●
Flexibility for 375 Green Street to act as an everyday plaza when not in
use for events
AFFORDABLE
HOUSING
13,900
GSF
0
Parking Spaces
11
Housing Units
0.03
Acres Open Space
8,000
GSF
0
Parking Spaces
0
Housing Units
0.1
Acres Open Space
9 Pleasant Street
SITE CONSIDERATIONS
●
Located on the same block as 84
Bishop Allen Drive (Starlight Square)
and HMart.
●
Across the street from 99 Bishop Allen
Drive, a newly renovated row house
development with non-profit office
space.
N/A
Gross Building Area (sq ft)
6,210
Site Area (sq ft)
17
Parking Spaces
BB
Zoning District
N/A
Number of Stories
PARKING
Current Use
96 Bishop Allen Dr
(Lot 4), The Port
Parking
Lot 4
SITE OPTIONS
●Affordable housing
development
●Performance & artist
space
●Open Space / Pocket
Park
Highlights! From Analysis and Input So Far
Affordable
Housing
Community
Garden
Outdoor
Plaza
Park /
Playground
Small Business
Incubator
Performance &
Artist Spaces
I would love to see
this use here!
I don’t want to see
this use here
96 Bishop Allen Dr
96 Bishop Allen Drive
1: Redevelopment Potential
for Affordable Housing
●
15-20 units, 8 stories
●
Active community use on the ground
floor.
●
No open space requirement
●
No parking provided, loss of existing
parking spaces
2: Public Plaza
●
75’ x 80’ / 0.14 acre
AFFORDABLE
HOUSING
ACTIVE COMMUNITY USE
30,060
GSF
0
Parking Spaces
15-20
Housing Units
0.0
Acres Open Space
0
GSF
0
Parking Spaces
0
Housing Units
0.14
Acres Open Space
PRELIMINARY
RECOMMENDATIONS
All Sites Under Study
Emerging Direction for 7 Sites
38 Bishop Allen(Lot 6)
Park, parking, and/or
additional stormwater storage
375 Green St (Lot 8) + 9
Pleasant St (Lot 9)
Reserve for land banking
Possible temporary activation/park
205 Western
Adaptive reuse for supportive housing
3 Bigelow
Municipal Offices
96 Bishop Allen (Lot 4)
Affordable housing (home ownership)
105 Windsor
Mixed use community
center serving the Port
Identified Properties
Supporting Infrastructure
Community & City Resources
Affordable Housing
Legend
3 Large, Central Sites with Key Questions
689 Mass Ave
Library OR
Ground floor public uses
with offices above
84 Bishop Allen (Lot 6)
Permanent plan for
standalone cultural space
OR
Ground floor cultural space
with other uses above
(housing or offices)
260 Green/45 Pearl
High density affordable housing OR
Renovated library in mixed use
affordable housing building
Identified Properties
Large Central Sites
with Key Questions
Legend
Possible Directions
205 Western
Adaptive reuse for supportive housing
3 Bigelow
Municipal offices
105 Windsor
Mixed use community
center serving the Port
689 Mass Ave
Library OR public
use + offices
260 Green/45 Pearl
Affordable housing,
potentially with Library
Identified Properties
Supporting Infrastructure
Community & City Resources
Central Civic Space
Legend
Affordable Housing
38 Bishop Allen (Lot 6)
Park, parking, and/or
additional stormwater storage
375 Green St (Lot 8) + 9
Pleasant St (Lot 9)
Reserve for land banking
Possible temporary activation/park
96 Bishop Allen
(Lot 4)
Affordable housing
(home ownership)
84 Bishop Allen
(Lot 6)
Cultural space and/or
Affordable hsg
Possible Directions
205 Western
Adaptive reuse for supportive housing
3 Bigelow
Municipal offices
689 Mass Ave
Library OR public
use + offices
260 Green/45 Pearl
Affordable housing,
potentially with Library
Potential program options
1.Zoning maximum of affordable
units including 15 ownership
2.Supportive housing and services
3.Over an acre of open space
4.Central cultural gathering space
5.10,000 SF Port community center
6.12,000-25,000 SF city offices
7.Flexible surface spaces +
additional structured parking
105 Windsor
Mixed use community
center serving the Port
38 Bishop Allen (Lot 6)
Park, parking, and/or
additional stormwater storage
375 Green St (Lot 8) + 9
Pleasant St (Lot 9)
Reserve for land banking
Possible temporary activation/park
96 Bishop Allen
(Lot 4)
Affordable housing
(home ownership)
84 Bishop Allen
(Lot 6)
Cultural space and/or
Affordable hsg
Discussion
38 Bishop Allen (Lot 6)
Park, parking, and/or
additional stormwater storage
375 Green St (Lot 8) + 9
Pleasant St (Lot 9)
Reserve for land banking
Possible temporary activation/park
205 Western
Adaptive reuse for supportive housing
3 Bigelow
Municipal offices
689 Mass Ave
Library OR public
use + offices
260 Green/45 Pearl
Affordable housing,
potentially with Library
Questions
1. Should the Library move to a
more visible location?
2. What should development of
a cultural venue or central
gathering space look like?
3. What are the aspirations for
development on 84 Bishop
Allen and 260 Green Street?
96 Bishop Allen
(Lot 4)
Affordable housing
(home ownership)
105 Windsor
Mixed use community
center serving the Port
84 Bishop Allen
(Lot 6)
Cultural space and/or
Affordable hsg
Next Steps
●
Explore scenarios to test how the pieces fit together
●
Consider phasing & timing, budget/funding options,
parking and other variables for implementation
●
Continue engagement
●
Refine recommendations for each site
APPENDIX
PROJECT SCHEDULE