A communication transmitted from Yi-An Huang, City Manager, relative to A communication transmitted from Yi-An Huang, City Manager, relative to a request for approval to seek authorization from the Massachusetts Office of the Inspector General (the “IG”) for the City to use the Construction Manager at Risk (“CMaR”) procurement and construction method (the “CMaR Method”) in connection with
Please submit one electronic application including copies of the signature pages, to the CM at- risk
mailbox: IGO-Chapter-149A@mass.gov. A paper copy may also be submitted to the OIG, but is not
required. To assist in the evaluation process, please submit and identify information and documents with
the item numbers on this application form.
I. General Information
1. Awarding Authority
City of Cambridge
a. Awarding Authority Person in Charge of Project
City Manager, Yi-An Huang
b. Awarding Authority Address City Hall, 795 Massachusetts Avenue, Cambridge MA 02139
c. Phone number of Awarding Authority Person in Charge of Project [phone removed]
d. E-mail address of Awarding Authority Person in Charge of Project yhuang@cambridgema.gov
2. Owner’s Project Manager (OPM) assigned or hired City of Cambridge, Capital Building Projects,
Brendon Roy, Director
a. Phone number for OPM [phone removed]
b. E-mail address for OPM broy@cambridgema.gov
3. Design Firm DLR Group
a. Principal Designer in Charge of Project James G. Silsby, AIA, LEED AP, NCARB, MCPPO
b. Phone number of Principal Designer [phone removed]
c. E-mail address of Designer [email removed]
4. Narrative description and brief history of the project:
The City of Cambridge School Department continues its Innovation Agenda by modernizing
the Kennedy-Longfellow School (KLO), a JK–5 elementary school that also houses an early
childhood program. Built in 1972 and serving over 200 students, KLO will be updated to
align with 21st-century learning standards and support the district’s commitment to equity,
sustainability, and academic excellence. This modernization will prepare the building to
support Innovation Agenda Programming and enhance its role as a feeder school to the
Cambridge Upper Schools; Cambridge Rindge & Latin High School.
a. Estimated Square feet 127,302 SF
b. Program type Education, Community & Recreation
c. Building type Masonry, Concrete, Steel
d. Address of project Masonry, Concrete, Steel
APPLICATION
5. Project schedule elements, including, but not limited to:
a. Feasibility study completion date (if any)
Study Targeted for September 2025
b. Owner’s Project Manager contract execution date (if not an employee)
City of Cambridge – employs MCPPO certified OPM
c. Designer contract execution date June 2025
d. Projected procurement milestone dates, including but not limited to the following items:
i. Request for prequalification issuance June 2025
ii. Request for proposals issuance June 2025
iii. CM at-risk firm contract execution date September 2025
iv. Other . . . na
v. Projected completion date (use and/or occupancy) September 2027
6. Submit an estimated total project budget, including but not limited to line items for the
following items:
a. Owner’s Project Manager contract amount (if not an employee) City of Cambridge
b. Designer contract amount tbd
c. Estimated construction cost $16,000,000.00
d. Other costs NA
e. Identify the source of the estimated project budget and estimated construction costs.
II. Awarding Authority Authorization Information
7. Submit the attached certification form (see last page) regarding the authorization from the
awarding authority’s governing body that the awarding authority may enter into a contract with a
construction management at-risk firm, including the date of authorization. Submit copies of any
public vote if applicable. Refer to “Certification of Authority” included herein, page XXX.
8. Submit the name(s) and title(s) of the individuals authorized to sign the CM at-risk contract on
behalf of the awarding authority. City Manager, Yi-An Huang. Refer to Attachment B.
The City of Cambridge City Council has appropriated initial design and construction funding
for this project and will allocate additional funds as needed throughout the project’s
progression. Preliminary cost estimates based on a combination of the architectural design
team and historical project data maintained by the City’s Owner’s Project Management
(OPM) tea of recent CM at Risk projects. Construction cost estimates have been cross-
checked against comparable scopes of work and market conditions. Soft costs have been
developed based on data from the last ten City of Cambridge projects managed by the same
OPM team.
9. Submit written evidence of the approval of the governing body of the project plan and procedures,
if applicable . Refer to “City Council vote dated June XXX” included herein, page XXX.
10. Submit the written determination by the awarding authority that the use of CM at-risk services is
appropriate for the building project and the reasons for the determination. Refer to
“Memorandum from City Manager to City Council dated June XX, 2025” included herein, page
XX.
III. Awarding Authority Capacity Information
11. Provide an organizational chart of the project organization showing the roles and responsibilities of
each individual or entity participating on the project, including contractors. Refer to Attachment B.
12. Provide the name, affiliation, and contact information for all key members of the project team. List
relevant qualifications and experience, including any public project experience and any CM at-
risk experience (public or private) on project(s) of similar size and complexity or on any
other projects, for:
a. the individual/s within the awarding authority that will make project decisions for
the awarding authority and that will supervise the Owner’s Project Manager,
b. the Owner’s Project Manager (OPM),1
c. the Designer,2 and
d. any other members of the project team or special consultants to be used to support
the project (e.g., counsel, accountant, financial advisor), if any.
13. Submit a copy of the scope of services portion of the a) OPM contract and b) designer’s contract. If
the OPM is an employee, submit the individual’s title, job description and scope of work related to
the CM at-risk project.
[Note: You do not need to send in copies of the scopes of services if the project is a
school building project receiving assistance from the Massachusetts School Building
Authority (MSBA) and the OPM and Designer will be signing the MSBA contracts for
CM at-risk services in their entirety with no changes. However, submit a copy of the
signed signatory pages.]
IV. Awarding Authority Plans and Procedures Refer to Attachment C for responses to 14a 14f.
The OIG reviews the awarding authority’s plan and procedures3 for procuring and managing the CM at-
risk services to ascertain whether the awarding authority has in place procedures, in accordance with
M.G.L. c. 149A, to ensure fairness in competition, evaluation and reporting of results at every stage in the
procurement process. Therefore, provide information regarding each of the following components of a
CM at-risk project:
14a. The awarding authority’s plan and procedures for conducting the two-phase selection process for hiring
a construction manager at-risk firm and the methods that will be used to ensure fairness in competition,
evaluation and reporting of results at every stage in the procurement.
14b. The awarding authority’s plan and procedures for developing the cost-plus not to exceed guaranteed
maximum price form of contract. Include information on negotiating the contract, including establishing
the general condition items, CM at-risk fee, cost of the work and other contract components. Include
information on what level of design development the awarding authority plans on establishing the GMP,
contingency and other components of the final contract amendment.
14c. The awarding authority’s plan and procedures for conducting the two-phase selection process for
obtaining trade contractors and the methods that will be used to ensure fairness in competition,
evaluation and reporting of results at every stage in the procurement.
14d. The awarding authority’s plan and procedures for obtaining subcontractors [M.G.L. c. 149A, § 8(j)] and
the methods that will be used to ensure fairness in competition, evaluation and reporting of results at
every stage in the procurement.
14e. The awarding authority’s plan and procedures relative to administering and coordinating the project and
maintaining project communications.
14f. The awarding authority’s plan and procedures relative to monitoring and auditing all project costs.
Do not submit requests for qualifications (RFQs), requests for proposals (RFPs), draft contracts, or
other such documents related to the CM at-risk delivery method procurement.
V.
Certification
The undersigned hereby certifies under the pains and penalties of perjury that all answers and all
information contained in this application are, to the best of my knowledge, true and correct.
May 21, 2025
Signature
Date
City Manager
City of Cambridge
Title
Awarding Authority
I,
, [legal counsel for the governing body as identified below] do hereby certify
to the Office of the Inspector General of the Commonwealth of Massachusetts, in accordance with M.G.L. c. 149A, §
4(a)(1), regarding using construction management at risk services for the following project
(“Project”), as
follows:
(1) That
[name of political subdivision] is a public agency as
defined in M.G.L. c. 149, § 44A(1), is duly organized and existing under the laws of the
Commonwealth of Massachusetts, and has received the necessary authority and power from
[its city council, town meeting or other governing body] to enter into a contract with a
construction management at risk firm and to perform all its obligations in connection with the
Project.
(2) That the public vote of the governing body, attached hereto (if applicable) was duly adopted
and is currently in effect.
Signature
[SEAL]
Title
Date
CERTIFICATE OF AUTHORITY TO USE CM AT - RISK DELIVERY METHOD
Attachment A
Part I Question 6e – Project Estimate
Project:
4-Jun-25
Estimated Budget Goal
20,000,000
$
Gross Area
121,080 Square Feet
Design & Construction Duration
months
Project Administration
OPM Services | Cambridge Project Management
750,000
Misc. Project Management Costs
100,000
Advertising
10,000
Printing
10,000
Police Details
25,000
Project Signage & Clouseout LCD/Plaque
20,000
Subtotal
915,000
Consultants - Design & Engineering
Licenced Site Professional/Geotechnial Engineer
100,000
Feasibility Study
330,000
Feasibility Study | Reimbursables
30,000
Feasibility Study | Commissionoing
10,000
Design & Construction Administration (design & engiee
1,665,000
Design Documents | Commissionoing
50,000
Post Construction - Year 2 | Commissionoing & Adjust
50,000
Subtotal
2,235,000
Construction Contract
Preconstruction
1,000,000
Construction - GMP
14,000,000
Subtotal
15,000,000
Direct Owner Related Costs
Miscellaneous Project Costs
Testing
250,000
Utility Fees
500,000
Subtotal
750,000
Furnishings, Fixtures & Equipment
Furniture
50,000
VoIP
50,000
Subtotal
100,000
Contingency
Owner Contingency & Escalation
1,000,000
Subtotal
1,000,000
TOTAL PROJECT BUDGET
20,000,000
Kennedy Longfellow School (KLO) | 158 Spring Street
City of Cambridge
Capital Building Projects
Attachment B
Part III Question 11 – Organization Award & Signing Authorities
City of Cambridge – Organization
The City Manager’s Office is the Executive Department of the City of Cambridge. As the City’s Chief Executive
Officer, the City Manager provides leadership to and the administration of all departments and services.
The City Manager is responsible for the enforcement of all laws and City ordinances; appointment of
department heads; appointment of members to the numerous City boards and commissions; and submission of
the annual budget to the City Council. In addition, the City Manager and his or her staff recommend policies and
programs to the City Council and implement City Council decisions.
Below is a description of all of those who will be involved followed by an organizational chart:
City of Cambridge - City Council
•
Authorizes the City Manager to apply to the Office of the Inspector General to use the Construction Manager
at Risk procurement and construction method set forth in M.G.L. c. 149A
•
Approves project funding
City Manager – Yi-An Huang
•
Signs all contracts, change orders, and authorizes all payments for the project
Deputy City Manager – Owen O'Riordan
•
The Deputy City Manager is responsible for all of the City’s capital projects
•
The Deputy City Manager is the chair of the selection committee for the selection of the construction
manager
•
The Deputy City Manager meets weekly with the owner’s project manager (“OPM”) to review all aspects of
the project
Purchasing Agent – Elizabeth Unger
•
The City’s Purchasing Agent implements and administers the purchasing policies and practices of the City.
The Purchasing Department ensures that all purchases of goods and services are made in accordance with
state law and City ordinances.
Finance Department
Assistant City Manager of Fiscal Affairs – Claire Spinner
Budget Director - Taha Jennings
Assistant Finance Director – Michele Kincaid
•
The Finance Department, under the direction of the Assistant City Manager of Fiscal Affairs, is responsible
for planning, implementation, oversight, integrity, and reporting of the City’s operating and capital finances.
The Finance and Budget Departments work closely with the City Manager’s office and the OPM to maintain
cost control throughout the project starting with the development of the project budget.
Capital Building Projects Department
Director – Brendon Roy
•
The Capital Building Projects Department, under the direction of the Assistant City Manager, is responsible
for the planning, management, and delivery of municipal construction projects for the City of Cambridge.
This includes public schools, fire and police facilities, community centers, and multi-department complexes.
The department oversees all phases of capital projects, from feasibility and design through construction
and closeout with a focus on ensuring projects are delivered efficiently, sustainably, and in alignment with
City goals.
•
The department provides centralized leadership across disciplines, integrating the work of architects,
project managers, engineers, and sustainability professionals. It ensures compliance with Massachusetts
public construction laws, manages design and construction procurement, and coordinates closely with the
City Council and other departments on project funding and scope approvals.
Owners Project Manager, MCPPO certified – Brendon Roy
•
The OPM is an employee of the City of Cambridge and is MCPPO certified
•
The OPM is the Director of the Capital Building Projects Department
•
Reports to the Deputy City Manager and City Manager
•
Assists the Deputy City Manager as a member of the selection committee for the selection of the
construction manager
•
Manages all daily aspects of the project with the building users, architect, construction manager,
commissioning agent, licensed site professional (“LSP”), geotechnical engineer and testing agency
•
Recommends project cost changes to the City Manager for approval
•
Recommends approval of payments for the architect and construction manager to the City Manager
•
Monitors project budget
Director of Construction, MCPPO certified – Monique Oliveira
•
The Director of Construction is an employee of the City of Cambridge and is MCPPO certified
•
Reports to the Director of Capital Building Projects/OPM
•
Assists the Deputy City Manager as a member of the selection committee for the selection of the
construction manager
•
Assists the OPM with managing all daily aspects of the project with architect, construction manager,
commissioning agent, LSP, geotechnical engineer and testing agency
•
Assists the OPM with all project cost changes
•
Assists the OPM with review and approval of payments for the architect and construction manager
•
Assists the OPM monitoring the project budget
Owners Project Manager, MCPPO certified – XXX
Architect – DLR Group, Jana Silsby, AIA, Principal
•
Reports to the OPM
•
Serves as a member of the City’s selection committee for the selection of the CMaR
•
Assists the Purchasing Department and the OPM with the RFQ for the construction manager
•
Prepares the design drawings and specifications and coordinates all aspects of the basic design services
and their additional services consultants
•
Coordinates with the construction manager starting with pre-construction services
•
Coordinates with the commissioning agent, LSP, geotechnical engineer and testing agency
•
Provides construction administrative services
•
Certifies monthly requisitions from the construction manager
•
Provides affidavits for substantial and final completion
Licensed Site Professional – CDM/Smith, Carol Rego, P.E. Vice President
•
Reports to the OPM
•
Responsible for the services described and coordination of with the architect
Geotechnical and Geothermal Well Engineer – CDM/Smith, Carol Rego, P.E. Vice President
•
Reports to the OPM
•
Responsible for the services described and coordination of with the architect
Commissioning Services – TBD
•
Reports to the OPM
•
Responsible for the preparation of the commissioning specifications for the architect
•
Responsible for commissioning various building systems
Construction Testing Services - TBD
•
Reports to the OPM, independent/3rd party testing agency
•
Responsible for the services described and coordination of with the Architect
CM Selection Committee
•
Owen O’Riordan – Deputy City Manager Chair
•
Elizabeth Unger – Purchasing Agent
•
Brendon Roy – Director Capital Building Projects
•
Monique Oliveira – CBP - Director of Construction
•
John Nardone – Commissioner DPW
•
Dave Murphy – Superintendent of Schools
•
Jana Silsby – Lead Architect
Trade Contractor Prequalification Committee
•
Purchasing Agent – Elizabeth Unger – Chair
•
Deputy City Manager Owen O’Riordan
•
Owners Project Manager – Director of Capital Building Projects, Brendon Roy
•
CBP - Director of Construction, Monique Oliveira
•
CBP - Director of Design, Nick Stout
•
Architect - Jana Silsby
•
Construction Manager at Risk (TBD)
Attachment B
Part III Question 12 – Organizational Chart
IV. Awarding Authority Plans and Procedures
Response to item 14a:
The City of Cambridge believes that they do have the necessary experience to manage the process of the OIG’s requirements to
procure CM at risk services for the Kennedy-Longfellow School Project per M.G.L. c. 149A delivery method. The City of Cambridge’s
Office of the City Manager, Procurement Department, and Capital Building Projects Department have worked together successfully
with M.G.L. c. 149 and M.G.L. c. 149A processes and have completed the following projects:
•
The Cambridge Public Library
•
The Robert W. Healy Public Safety Facility
•
The Cambridge War Memorial Building
•
The West Cambridge Youth and Community Center/VFW
•
The Cambridge Rindge and Latin School Project
•
Alice K. Wolf Center 5 Western Avenue - MGL 149A
•
Dr. Martin Luther King School -Putnam Ave Upper School - MGL 149A
•
King Open and Cambridge Street Upper School & Community Center - MGL 149A
•
Phase 1 - Multi-Department Relocation Plan Phase 1 – 859 Massachusetts Ave
•
Phase 2 - Multi-Department Relocation Plan Phase 2 – City Hall Upgrade - MGL 149A
•
Foundry Project – 101 Rogers Street - MGL 149A
•
Tobin School and Vassal Lane Upper School - MGL 149A
•
Fire Headquarters Project – MGL 149A
The OPM’s team within the Capital Building Projects department works closely with the Purchasing Department in preparing the
Request for Qualifications (RFQ) for qualified Construction Management firms. The RFQ, which is posted on the City of Cambridge
Procurement web page, also in local newspaper and trade publications including the Central Register. This project’s construction
costs are fully funded by the City of Cambridge.
The City of Cambridge has acquired architectural and engineering consulting services through the public procurement process to
assist in the process to evaluate and engage a Construction Manager at Risk for this project.
After the City of Cambridge receives notice from the OIG to commence with soliciting CMaR services the selection committee shall
meet and define the following:
•
Prepare and advertise the RFQ for CMaR services following the procedures as set forth in M.G.L. c 149A
•
The Selection Committee receives and evaluates the statement of qualifications and pre-qualify a minimum of 3 firms
•
The Selection Committee shall prepare the RFP and distribute to the CM at Risk Firms
•
The Selection Committee shall receive, Interview, evaluate and rank the CM at risk proposals
•
The Selection Committee shall negotiate non-fee contract terms with the selected CM at risk firm
The City of Cambridge Purchasing Department shall be issuing all official notifications to solicit the RFQ
and RFP documents. The City of Cambridge Purchasing Department shall be the point of contact for all correspondence during the
Selection process to ensure fairness in competition. The City of Cambridge Purchasing Department shall evaluate all of the RFQ’s and
the reporting of the Selection Committee results.
Response to item 14b:
The City of Cambridge understands that M.G.L. c. 149A requires that design documents be at a minimum of 60% complete when
establishing the GMP. The goal is to have the documents as close to 100% as the schedule will allow keeping the unknowns or
speculation of costs to a minimum. Having the CM at risk under contract during the design development phase will also enhance the
overall cohesiveness of the team. The GMP shall also include the following:
•
At the completion of all design phases including a final estimate at 90%, the CM at Risk shall prepare a detailed cost
estimate with all line-item including quantity and unit costs for all items. The Architect shall be required to engage a
cost estimator through Schematic design and reconcile differences with the CM at Risk. The final GMP is established
after all qualified trade bidders are under contract.
•
Dollar values for the CM at risk firm’s contingency
•
Dollar amounts for the CM at risk firm’s general conditions and fees, including those for the pre-GMP work
•
A listing of all design documents for which the GMP bid is based
•
A list of Allowances, Alternates, and unit prices
•
Any clarifications or assumptions for which the GMP is based
•
The dates of substantial and final completion
Response to item 14c:
The City of Cambridge Purchasing Department shall be issuing all official notifications to solicit the
pre - qualifications for the trade contractors. The City of Cambridge Purchasing Department shall be the point of contact for all
correspondence during the selection process to ensure fairness in competition and evaluation of the trade Contractor pre -
qualification submittals and reporting the trade Contractor prequalification Committee results.
The Trade Contractor pre-qualification committee members are listed above in “Attachment B” of this Application.
The City of Cambridge shall award the trade bids to the lowest responsive and responsible pre-qualified sub trade bidder.
Response to item 14d:
The City of Cambridge shall work closely with the selected CM at risk to identify nontrade subcontractors to bid on the project. The
City of Cambridge Purchasing Department shall be informed of all sub bidders notified and shall keep and updated tabulation of all
bidders.
The City of Cambridge Purchasing Department shall work closely with the OPM’s team within the Capital Building Projects
Department and the CM at risk contractor during the bidding process to ensure fairness in competition and shall coordinate with the
Director of Equity & Inclusion to ensure that all bidders are aware of the City of Cambridge Ordinances and that all are properly
addressed during the bidding process.
Response to item 14e:
The City of Cambridge Selection Committee shall meet regularly during the CM at risk procurement process to review, discuss and
score all RFQ/RFP proposals. The Selection Committee shall make a recommendation to the City Manager who will make the final
selection decision.
After the CM at risk is selected, the OPM’s team within the Capital Building Projects Department, Architect and the CM at risk shall
meet regularly to review Trade Contractor submissions with the Trade Contractor prequalification Committee.
During the design, and through all construction phases, the team including the OPM, Architect and the CM at risk shall meet weekly
to review status of shop drawing submittals, testing requirements, design changes, schedule, payments and coordination of the
construction activities with the City of Cambridge Inspectional Services Department to assure compliance with the construction
documents.
In addition to the team weekly meeting, the Capital Building Projects Department meets weekly with the Deputy City Manager to
keep the City Manager apprised of all developments relating to the weekly progress of the design and construction activities.
Response to item 14f:
The OPM is required to review and recommend payment of invoices to the City Manager for approval. The City of Cambridge
Finance Department receives the approved invoices signed by the OPM and the City Manager for payment. The OPM tracks and
maintains the project budget and reconciles all account activity on a regular basis with the Finance Department which is responsible
for the official tracking of all project costs with the Audit Department.