A communication transmitted from Yi-An Huang, City Manager, relative to combined sewer overflows
City of Cambridge
Department of Public Works
John F. Nardone, Commissioner
147 Hampshire Street
Cambridge, MA 02139
theworks@cambridgema.gov
Voice: [phone removed]
TDD: [phone removed]
To:
Yi-An Huang,
City Manager,
From: John F Nardone
Commissioner DPW
Date: December 17, 2025
Re: Policy Order 2025 #136: requests that the City Manager work with relevant City
Departments and watershed advocacy groups to consider various measures, including:
•
Costs and benefits to meet the 2050-25 year storm level of control for CSOs.
•
Updating regulations for stormwater management on private development
projects
•
Implementation of green stormwater infrastructure
•
Improving meaningful public outreach on sewer and stormwater investments
including the creation of a Combined Sewer Overflow Commission
This Policy Order follows a public hearing of the Council’s Health and Environment
Committee on September 9, 2025, where the City’s on-going work to reduce combined
sewer overflows was discussed. As a response to this policy order, the City offers the
following update.
Background
Combined Sewer Overflows (CSOs) are part of a broader set of interconnected
challenges within the City’s sewer and stormwater collection systems. CSOs are,
generally, the process by which sewage from the City’s combined sewer systems is
released into waterways in order to prevent sewage backups into homes, businesses and
streets. CSO control is a broad description of policies and infrastructure used to reduce
the frequency and volume of CSOs. As the City prepares the Draft CSO Control Plan, it
is important to contextualize CSOs and other methods the City has used to address sewer
and stormwater quality over decades.
The City has consistently invested in infrastructure improvements to provide the level of
service expected from modern sewer and stormwater systems. Accordingly, the City’s
planning and infrastructure improvements extend beyond CSO control to address sanitary
sewer overflows, basement backups, street flooding and the overall quality of stormwater
runoff. These issues are inherently linked, and the City has adopted an integrated
approach that manages the sewer and stormwater systems holistically - enhancing system
capacity, improving water quality, and strengthening climate resilience.
Cambridge has been advancing these initiatives since the adoption of the Clean Water
Act in 1972, often ahead of regulatory requirements, demonstrating a longstanding
commitment to proactive system management. Through initiatives such as the Ten-Year
Sewer and Drain Infrastructure Plan, the FloodViewer and Flood Resilience Zoning
programs and the implementation of green stormwater infrastructure, the City continues
to adopt a comprehensive system-wide approach that integrates ongoing refinement of
modeling tools, technical guidance, and design standards in response to new data and
emerging trends. This proactive and adaptive strategy ensures that infrastructure
investments achieve multiple environmental and regulatory objectives while enhancing
the long-term reliability and resilience of the collection system.
The stormwater management measures summarized in this response – regulatory
oversight of private development and green stormwater infrastructure – are central to the
City’s holistic sewer and stormwater planning. DPW actively reviews the City's
stormwater management regulations against the latest information related to the City's
flood model, stormwater program, and zoning amendments. Cambridge’s stormwater
regulations for private development have always exceeded state and federal requirements,
applying rigorous standards citywide to support flood resilience and water quality. DPW
routinely evaluates and revises these standards, most recently proposing updates to
require smaller developments to comply with the City’s stormwater storage criteria for
the 2070 projected storm. DPW actively integrates green stormwater infrastructure, such
as bio-basins, tree filters, and porous pavement into roadway, sidewalk, and open space
projects. While large-scale flood mitigation through green infrastructure is limited by
Cambridge’s dense urban environment, DPW incorporates these systems whenever
possible in order to enhance stormwater quality and sustainability.
Update on the Draft CSO Plan
The City is currently preparing a Draft CSO Control Plan as required under Water
Quality Variances for the Charles River and Alewife Brook issued by the Massachusetts
Department of Environmental Protection (DEP) and the United States Environmental
Protection Agency (EPA). Cambridge is working collaboratively with the Massachusetts
Water Resources Authority (MWRA) and the City of Somerville on the Draft Plan. The
original submission deadline for the Draft CSO Control Plan was December 31,
2025. However, DEP and EPA have requested additional information and analysis as
part of the Draft Plan, so Cambridge, MWRA and Somerville have requested a 120-day
extension for submission. With this extension, there will be an additional public meeting
in January 2026 to present further information on CSO Control Plan alternatives and
financial capability assessments. When the Draft CSO Control Plan is submitted, there
will be a five-month public review and comment period. Following that review period
and any further adjustments, the Final Updated CSO Control Plan will be submitted in
January 2027.
2050 25-Year Storm Level of Control for CSOs
Development of the 2050 Typical Year Rainfall
One requirement of the EPA’s CSO Control Policy, which directs the Draft CSO Control
Plan, is to model a “Typical Year” of rainfall. A Typical Year is a full year of rainfall
data that best represents rainfall conditions over 365 days. A “Typical Year” is required
in order to assess how planned improvements will perform under those rainfall
conditions.
A Typical Year is used throughout the CSO control planning process for the following:
•
at the onset, to understand current system performance, against which proposed
alternatives will be assessed.
•
during development, to identify and test alternatives; and
•
during implementation, to set a benchmark to measure and assess progress.
Beyond simply establishing a current Typical Year, Cambridge, Somerville, and MWRA
have jointly developed a “Future 2050 Typical Year” for the Draft CSO Control Plan.
This dataset will be used to evaluate CSO discharge volumes and activation frequencies
at locations throughout the combined sewer system in the Alewife Brook/Upper Mystic
River and Charles River Basin.
This effort is notable because it creates a Typical Year based on projected future climate
conditions, including more intense rainstorms than those reflected in the current Typical
Year. At present, EPA and MassDEP have not issued guidance on incorporating future
precipitation projections into the development of Typical Years for CSO Control Plans.
The method used to develop the 2050 Typical Year is the first of its kind. It was vetted
and peer reviewed by climate scientists and provides a scientifically supported Future
Typical Year for use in the Draft CSO Control Plan.
A Future Typical Year is developed by considering both historic observed, and modeled
future, precipitation levels to understand how proposed system improvements will
perform under the impacts of climate change. It also allows planners to develop
alternatives that are sized for this predicted increase in precipitation. While it is being
referred to as the 2050 Typical Year, the analysis actually covered a 30-year climate
period centered around 2050, using the years 2040–2069 for the analysis. This 30-year
window offers a more stable, representative projection of climate change trends rather
than the variability that occurs year-to-year. The CSO control program, i.e., the program
by which actions in the Final Updated CSO Control Plan take effect, is likely to reach
implementation during 2040-2069. Developing alternatives based on future conditions of
the 2050 Typical Year helps avoid designing solutions that would become obsolete soon
after they are fully operational.
In addition to the 2050 Typical Year, the Draft CSO Control Plan process has considered
the “2050 25-Year Storm.” This means, in lay terms, planning for the heaviest of storms;
a storm with a 4% chance of occurring in a given year. The 2050 25-Year Storm is
modeled as 7.8 inches of rain in 24 hours. Such a storm is larger than the current 50-year
storm and will cause widespread flooding in Cambridge in areas served by combined
sewers as well as areas with separate sewers and storm drains. This flooding will include
overland flooding, backups into buildings, and sanitary sewer overflows.
Figure 1. System Performance During the 2050 25-Year Design Storm: Manhole
Flooding to the Ground Surface
Figure 2. System Performance During the 2050 25-Year Design Storm Design Storm:
Inland Over the Ground Flooding
Because of this widespread flooding, even building CSO control infrastructure to the
level of a 2050-25 Year Storm may provide limited public health and water quality
benefits. Conceptual design of the facilities needed to control overflows for the 2050-25
Year Storm indicates that large storage tanks and tunnels will be needed. The amount of
available land/space for such facilities will be a significant constraint, even including any
potential use of Department of Conservation and Recreation (DCR) open space.
However, the Cambridge, Somerville, and MWRA project team have evaluated
alternatives that can achieve the 2050 25-Year Storm level of CSO control and detailed
information will be available in the upcoming Draft CSO Control Plan.
Updating Stormwater Management Regulations for Private Development
The City's Wastewater and Stormwater Drainage System Ordinance (Chapter 13.16 of
the Cambridge Municipal Code), enacted in 1998, was significantly revised in 2008 to
establish regulatory authority to require stormwater management standards for private
development. This Ordinance is implemented through the Land Disturbance Regulations
as well as the Wastewater and Drainage System Use Regulations, which specify criteria
for projects that require Stormwater Control Permits.
Since adopting these regulations, Cambridge has consistently applied more stringent
project criteria than any overlapping federal or state requirements. Cambridge has also
chosen to apply its stormwater management criteria to development projects citywide, in
both separated and combined sewer areas. Projects that meet one or more of the
following criteria require a Stormwater Control Permit from DPW:
•
Disturbance of one or more acres of land,
•
Construction exceeding 50,000 square feet of Gross Floor Area,
•
Project parcel(s) size equal to or greater than one acre,
•
Inclusion of outdoor parking for 10 or more cars,
•
Requirement of a Special Permit from the Planning Board, or
•
Determination by the City Engineer that the project may result in an adverse
impact on the municipal Sewer, Combined Sewer, Stormwater Drainage Systems
or Water Resources.
DPW has issued approximately 200 Stormwater Control Permits since the Land
Disturbance Regulations were established.
Cambridge’s Wastewater and Stormwater Management Guidance Document (2008)
establishes the City’s technical standards for stormwater control. The current standard for
the management of stormwater volume requires a permit holder to demonstrate that their
property will be able to store the difference between the 2-year storm (3.6 inches) pre-
construction, and the 25-year storm (8.2 inches) post construction, using the City’s
projected rainfall data for the 2070 storm. A storage requirement of this magnitude
(equivalent to approximately 4.6 inches of rainfall on-site) and the use of projected storm
events incorporating climate change are not mandated by any federal or state regulations.
Cambridge adopted this rigorous standard to directly support citywide stormwater
management improvements.
Due to the density of redevelopment in Cambridge, on-site storage of the 2070 100-year
storm (11.7 inches) is not feasible due to the space required to store this volume. Despite
this, by enforcing the 2-year to 25-year 2070 storage requirement across a wide range of
projects, Cambridge has achieved a substantial level of on-site stormwater management
and will continue to require developers to incorporate significant stormwater storage into
their projects.
Cambridge also extends stormwater management to even smaller projects requiring a
Building Permit, but not a Stormwater Control Permit, including any project with:
•
A building addition greater than 150 square feet, or
•
Any proposed increase in impervious area.
For these projects, DPW requires stormwater controls to the maximum extent practicable,
including evaluation of storage for the 2070 2-year to 25-year storm difference. DPW
reviews an average of 320 building permit applications annually. Of those, an average of
60 reviews each year include a review of civil site plans and stormwater management.
The goal of these reviews is to identify opportunities for smaller projects to make
improvements that contribute to the goals of the City’s stormwater management
program.
DPW continually evaluates existing regulations and project thresholds to align with
changes in development and City zoning. In the summer of 2025, DPW initiated a
detailed review of project criteria for Stormwater Control Permits, evaluating recent
changes to zoning and recent development projects (parcel size, project criteria triggering
a Stormwater Control Permit, etc.). As a result of this review, DPW plans to revise its
criteria for projects that require a Stormwater Control Permit, in order to maintain the
effectiveness and impact of this regulatory program.
In parallel, DPW is revising the Wastewater and Stormwater Management Guidance
Document to clarify requirements for smaller projects. Proposed updates include
requiring all projects undergoing DPW site plan review for a Building Permit to store the
difference between the 2-year (pre-construction) and 25-year (post-construction) 2070
storm events to the maximum extent practicable, with a minimum on-site storage
requirement this is still being evaluated.
Cambridge’s stormwater regulations already exceed all federal and state requirements
and set a high standard for stormwater storage in an urban setting. The proposed revisions
to project criteria will allow the City to incorporate additional private development
projects into the City's program and support stormwater improvements citywide.
Implementation of Green Stormwater Infrastructure
As a standard practice, DPW evaluates roadway and capital improvement projects for
opportunities to incorporate green stormwater infrastructure where feasible. The City’s
Green Streets Guidance document outlines the City’s approach to integrating green
infrastructure and stormwater management into the design of public rights-of-way while
balancing other public infrastructure needs. The City integrates green infrastructure
features into roadway, sidewalk, and open space improvements whenever practicable.
Examples of green stormwater infrastructure implemented across Cambridge include the
Alewife stormwater wetland which provides stormwater quantity and quality control
implemented during previous CSO control work in West Cambridge. The City has also
constructed porous bike paths, porous pedestrian walkways, bio-basins, rain gardens,
subsurface infiltration systems, tree filters, infiltrating catch basins, and drywells.
Subsurface infiltration system at Longfellow Park.
Bio-basin on Lakeview Ave.
Porous pavement bike path along Galileo Galilei Way.
In addition to City projects, green stormwater infrastructure is also constructed as part of
private redevelopment projects, following City stormwater requirements. In Cambridge,
there are limited opportunities to construct green infrastructure systems on City property
or within the public right-of-way that would be large enough to store the volume
necessary for CSO control or flood mitigation. While green stormwater infrastructure has
multiple benefits, including local stormwater management, the effectiveness of green
infrastructure for CSO control is limited in dense, urban environments such as
Cambridge, where available space for infiltration and storage is constrained. As such,
green infrastructure in City capital projects is primarily used for the improvement of
stormwater quality. Green stormwater infrastructure remains a key component of the
City’s overall stormwater management strategy and the City is committed to continuing
to install new green infrastructure as part of City projects where feasible.
Improve Meaningful Public Outreach Including the Creation of a Combined Sewer
Overflow Commission.
Robust public outreach for the Draft CSO Control Plan
The extensive scope and complexity of the alternatives being developed to reduce CSOs
as part of the Draft CSO Control Plan will impact both the communities abutting these
water bodies as well as MWRA communities. From the beginning of the plan
development process, Cambridge, Somerville and MWRA have been committed to
engaging impacted parties and clearly sharing critical information. Below is an overview
of the substantial efforts to not only inform stakeholders of CSO Planning, but to
facilitate public input on CSO control alternatives. Over the last three years, Cambridge,
Somerville and MWRA have focused on organizing public meetings providing up to date
information and materials, hosting technical meetings with watershed organizations,
facilitating community feedback, and conducting outreach to environmental justice
groups. To assist with the Draft Plan public involvement efforts, Cambridge, Somerville
and MWRA partnered with a consultant, the Consensus Building Institute (CBI), who has
played an integral role in public presentations and the wider engagement approach.
Need for Public Input
A key goal of engagement efforts has been informing and inviting active participation
from as many stakeholders as possible. The communities around these CSO locations feel
the impact of overflows today and will be subject to the disruption caused by the
construction of CSO control projects. It is important to keep them informed on Plan
development and let them share their perspective. Cambridge, Somerville and MWRA
have been, and continue to be, receptive and responsive to public inquiries and feedback
related to developing the Draft CSO Control Plan. In 2026, staff expect to hear significant
input from the public on the Draft Plan and integrate that input into the planning
process.
Public Engagement Considerations
Early in the public engagement process, Cambridge, and Somerville and MWRA
committed to three main goals: conducting expansive outreach so that as many interested
stakeholders as possible could participate, providing up to date information so that
participation could be knowledgeable, and ensuring the participation of members of
Environmental Justice (EJ) populations. Sixty percent of the residents of MWRA’s
service area live in EJ communities and nearly all of Cambridge and Somerville
neighborhoods include EJ populations according to the State’s Executive Office of
Energy and Environmental Affairs’ criteria. Boston, Medford, Everett, and Arlington,
which border the Charles River, Alewife Brook and Mystic River, also have significant
EJ populations. Outreach to these stakeholders, including translation and interpretation
services, is a critical component of the public engagement. Additionally, stakeholders
have a broad range of familiarity with CSOs and the efforts to reduce them. Some have
been involved for a while and have benefited from past meetings or published
information while others are new to the process. This presents a challenge in designing
the information to meet everyone’s needs.
Methods of Engagement
To engage with as many stakeholders as possible, Cambridge, Somerville and MWRA
utilized a number of methods.
Project Website
One of the first steps in the outreach was the creation of a joint project website as a public
resource for everything associated with updating the CSO Control Plan. The website has
a running timeline of all meetings and events, the presentation slides and recordings of all
previous public meetings as well as any associated materials, an FAQ on CSOs and the
development of plans and translated flyers for any upcoming meetings. The public can
also subscribe to receive emails on the project and see the contact information of project
leaders for each entity. This website provides a critical platform for both past project
materials and future engagement.
Public Meetings
Cambridge, Somerville and MWRA hosted five virtual public meetings to date. These
meetings were designed to inform the public over the course of the project by (a) sharing
information about the process and draft concepts and content as it was developed, and (b)
getting timely input and feedback from the public about the topics the project team was
working on. General topics included:
•
what CSO discharges are, why they occur, and what has been done already to
reduce their frequency and volumes.
•
an overview of the planning process.
•
an overview of potential tools to help reduce or eliminate CSO discharges.
•
potential control alternatives under consideration and the range of costs; and
•
results of alternative analysis.
In addition to the public meetings, there was a listening session in April 2025 to provide a
forum for anyone interested in CSOs and the Draft CSO Control Plan to share their
priorities, concerns, and questions on the planning process. To offer the public multiple
perspectives, the listening session also included brief presentations by three watershed
groups – Charles River Watershed Association, Mystic River Watershed Association, and
Save the Alewife Brook – as well as the MWRA Advisory Board. See the table below
for the topics, dates, and the number of remote participants for each public meeting.
Public
Meeting
Topic
Date
Participants
1
CSO Overview & Intro to CSO Plan
June 29, 2022
226
2
Plan Priorities & New Typical Year
Development
December 15,
2022
177
3
CSO Tools & Alternative
Development
November 15,
2023
243
4
Alternatives Screening & Affordability
Analysis
January 22,
2025
355
Listening Session
April 3, 2025
173
5
Results of Alternative Analysis
September 25,
2025
170+
6
Present Draft Plans
Spring 2026
Planned
7
Present Final Plans
Winter 2027
Planned
Given the technical complexity of the project, the effort to design the content of these
meetings so the plan could be understood by members of the public with vastly different
levels of knowledge about CSOs was significant. Meetings were two to three hours long
and involved both presentations and time for questions to be answered in writing and/or
verbally. During these meetings staff answered over 450 questions to inform and enable
continued public participation in real time. Additionally, surveys associated with the
second and third public meetings were made available and open for several weeks to
gather input from people who were not able to attend the meeting live. All public
meetings were recorded and posted online, and all meeting materials were posted online
so the public could access them at any time.
Outreach for Public Meetings
Cambridge, Somerville and MWRA conduct broad outreach in anticipation of the public
meetings. Prior to each one, notifications are posted on the joint website as well as each
entity’s website. Notification flyers with QR codes for registration are developed and
translated into eight languages prevalent in the surrounding communities – Spanish,
Portuguese, Mandarin, Haitian Creole, Nepali, Amharic, Arabic, and Bengali in
adherence to Massachusetts Environmental Policy Act Office’s (MEPA) Public
Involvement Protocol for Environmental Justice Populations. These flyers are posted to
the joint website and distributed in EJ communities, at community events, through the
watershed associations, and through MWRA’s water fountain program across the metro
area.
Notifications of public meetings and the listening session were widely distributed. Flyers
were emailed to nearly 200 contacts, including the MEPA Environmental Justice
distribution list and specific EJ organizations identified by Cambridge and Somerville.
In addition to outreach, accessibility was prioritized at the public meetings. All have
been conducted over Zoom to maximize participation, which proved to be successful,
with at least 170 people attending all the meetings to date. Interpretation has also been a
focus. The presentation for the first meeting was prerecorded in English and live
interpreted into four languages – Portuguese, Spanish, Amharic, and Bengali – followed
by a question-and-answer period. The second meeting was entirely live interpreted in
eight languages – Spanish, Portuguese, Mandarin, Haitian Creole, Nepali, Amharic,
Arabic, and Bengali. Participants had the option to join distinct language channels where
an interpreter would be repeating the original speaker in the given languages. The third
meeting was live interpreted in Spanish and Portuguese as potential participants did not
request additional languages during outreach. Since attendance on the translation
channels cannot be seen in Zoom, interpretation was provided on request for the fourth
and fifth public meetings. Flyers continue to be translated into eight languages with
instructions on how to request interpretation for upcoming meetings.
Surveys
Another strategy implemented for encouraging and obtaining feedback is to provide
opportunities for people to submit input via asynchronous written online surveys. These
were conducted both during public meetings through live polling and, several times,
through surveys shared with the broader public that were open for several weeks. See
below for a list of each survey conducted to date.
Survey
Date
Format
Respondents
Public Meeting
# 2
December 2022 -
January 2023
Broad Survey
86
Public Meeting
# 3
November 15, 2023 Live Poll
81
Public Meeting
# 3
December 2023 -
January 2024
Broad Survey
1,312
Public Meeting
# 4
January 22, 2025
Live Poll
167
The aim of these surveys was to learn who was participating at the public meetings (we
asked where people lived and worked), in some cases to hear their primary reason for
attending, and to provide a chance for people who might not want to speak in front of
nearly 200 people a chance to share their concerns about the current CSO situation,
suggestions for the plan development process, and thoughts on what is most important for
the Plan to include.
Over the past several years, responses to these surveys, as well as discussions with the
watershed groups, have yielded several themes:
•
Cambridge, Somerville, and MWRA need to act with urgency to develop and
implement both short-term and long-term CSO reduction alternatives.
•
Green infrastructure and nature-based solutions should be a key part of
mitigation.
•
Input from the public and watershed groups should be taken seriously and their
feedback should be integrated into the Draft CSO Control Plan (and Final
Updated CSO Control Plan).
•
The projected impacts of climate change should be considered in evaluating
alternatives.
Engagement with Watershed Organizations
In the fall of 2023, Cambridge, Somerville and MWRA also began meeting separately
with watershed groups, specifically the Mystic River Watershed Association (MyRWA),
the Charles River Watershed Association (CRWA), and Save the Alewife Brook
(StAB). While communication with these organizations has been frequent, the watershed
groups expressed a desire to be more deeply involved in the development of the Draft
CSO Control Plan. To date, four separate meetings have been held with these groups.
The purpose of these meetings has been (a) to share technical information and answer
questions, (b) to hear feedback, and (c) to get advice on the public meeting designs. Since
the watershed groups are much more familiar than the general public with CSOs in the
relevant water bodies and the types of potential mitigation measures, these meetings have
allowed for in-depth dialogue on specific topics and more technical discussions.
Watershed Group
Meeting
Date
Format
Number of
Participants
1
October 24, 2023
In-person
21
2
June 24, 2024
In-person
32
3
December 17, 2024 Virtual
35
4
September 4, 2025 In-person
35
In addition to these group sessions, leaders from the watershed organizations were in
touch with project staff informally via email and phone during the process to request or
share updates or provide recommendations. The watershed groups have helped the
project significantly through outreach to interested constituents in the area, and their help
was key to achieving high levels of attendance at public meetings to date. In addition to
these group sessions, leaders from these organizations were in touch with project staff
informally via email and phone during the process to request or share updates or provide
recommendations.
Commitment to Community Feedback
Cambridge, Somerville and MWRA heard and directly responded to many of the
concerns raised through engagement with the public and watershed groups. The 2050-25
Year Storm model was developed specifically to project the impacts of climate
change. Many near-term improvements have been investigated and
implemented. Notification, including additional signage on bike paths, in advance of
large rainstorms has been implemented and two evaluation reports have been
completed: 1) evaluating the effectiveness of current floatables control at outfalls to the
Alewife Brook and the Upper Mystic River and recommending improvements; and 2)
identifying potential best management practices for reducing odors near CSO structures
in the three water bodies. Lastly, in response to comments from both the public and the
watershed groups, green stormwater infrastructure will be integrated into many
alternatives where feasible.
Next Steps
Cambridge, Somerville, and MRWA will continue to have monthly meetings with
MassDEP and the EPA as the Draft CSO Control Plan is finalized and will also continue
to answer questions from the public and the watershed organizations.
The Draft CSO Control Plan submittal will be followed by a public meeting and hearing
on the Draft Plan within a five-month DEP/EPA and public review and comment
period. Public outreach throughout impacted communities and to various stakeholders
will continue through this comment period to encourage additional engagement.
Cambridge, Somerville and MWRA envision robust public involvement during these few
months, to inform further adjustment to the Draft Plan prior to submitting the Final
Updated CSO Control Plan in January 2027 for MEPA review.
The Final Updated CSO Control Plan will provide a conceptual level overview of
potential alternatives and their impacts rather than design-level details on specific
projects. The Plan itself will not require Environmental Impact Report review at that
time. Instead, project-specific reviews will be conducted and those that exceed MEPA
thresholds will comply fully with applicable MEPA regulations, including requirements
relating to public outreach and involvement of EJ populations and an analysis of impacts
on these residents.
Although Cambridge, Somerville and MWRA are close to achieving a significant
milestone by finalizing recommendations for reducing CSOs as part of the Draft Plan,
there are still many opportunities for the public to engage and provide input over the next
year plus as the development of a final plan continues.
City of Cambridge CSO Control and Stormwater Management Advisory Committee
DPW has evaluated the creation of an advisory committee to provide feedback to City
staff on the development and implementation of the Draft CSO Control Plan (and Final
Updated CSO Control Plan) as well as the City’s broader Stormwater Management
Program. There are currently several advisory committees that provide input on City’s
Capital Investment Plan. Having an advisory committee for capital improvements
specific to the City’s wastewater and stormwater systems will be beneficial. An advisory
committee comprised of members of watershed advisory groups and technical experts in
the design, construction and financing of large capital projects can provide valuable input
to City staff implementing these plans. DPW will begin a process early in 2026 to
advertise this advisory committee and recommend members to the City Manager.