Search ▸ Communication to the City Council
Letter from Donna P. Lopez, City Clerk transmitting a report from Councillor Zondervan, Co-Chair of the Health and Environment Committee for a public hearing held on May 24, 2018 to discuss the City of Cambridge getting to NET Zero Action Plan
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative.
ATTACHMENTA
May 24, 2018
ZERO
City of Cambridge
THE PATH TO A
CAMBRIDGE I
FY 2017 Progress Report
Health and Environment Committee Hearing
Getting to Net Zero Action Plan
and Low Carbon Energy Supply Strategy
Annual Report
• Continued program design
FY 17 Actions Emphasize:
• Initial program and policy pilots
THE PATH TO A
VIET ZERU
• Continued establishment of project resources
CAMBRIDGE d
THE PATH TO A
Annual Report
• Qualitative Action Updates
• Quantitative Project Outcomes
• Quantitative Action Outputs
FY 17 Goals:
Targeted achievements
Action Summaries
THE PATH TO A
HET ZERO
Next steps
CAMBRIDGE I
progress, or behind)
institutional, resources)
FY 17 Progress, Barriers, and Next Steps:
Action status (on track, in
Action barriers (regulatory,
THE PATH TO A
NET ZERE
buildings through
Reduce energy use in
retrofits and improved
operations.
i CAMBRIDGE
1.1.2 Additional BEUDO Requirements
I.I.I Custom Retrofit Program
DETAILED ACTION PLAN
I. Energy Efficiency in Existing Buildings
DE30U
FY 17 Goals:
Multi-Family Pilot program
Begin implementation of the
delivery
THE PATH TO A
MEI ZERU
implementation
Action 1.1.1: Custom Retrofit Program
CAMBRIDGE A
Coordination with utility and
Multi-Family Energy Pilot in
vendor to streamline program
Multi-Family Advisor offering
and program tracking/evaluation
FY 17 Progress, Barriers, and Next Steps:
THE PATH TO A
HE ZEE
Conduct Phase 2 stakeholder-
Manage coordination with related
based program design process
BEUDO Requirement design
analysis complete
process underway; Phase 1 data
actions
L COMBRIDGE
FY 17 Progress, Barriers, and Next Steps:
Action 1.1.2: Additional BEUDO Requirements
emission reduction goals of
Cambridge-specific
FY 17 Goals:
Determine which buildings
the Net Zero Action Plan
requirements, including the
necessary to achieve the
performance thresholds
will be impacted by the new
2.2.2 Height + FAR Bonus
DETAILED ACTION PLAN
Cambridge Zoning Ordinance
2. Net Zero New Construction
2.4 Net Zero Municipal Buildings
2.2.1 Market-based Incentive Programs
2.3 Increase Green Building Requirements in
2.5 Removal of Barriers to Increased Insulation
THE PATH TO A
MET ZERO
CAMBRIDGE
new construction.
Enable low carbon
LET ZEI0
THE PATH TO A
Consider density-based incentive
University collaboration to study
approach (see Action 2.2.2)
options without outside funding
Limited meaningful market incentive
program approaches completed
Fi CAMBRIDGE
FY 17 Progress, Barriers, and Next Steps:
Action 2.2.1: Market Based Incentive Program
construction and major
FY 17 Goals:
complexity and shorter
sector where there is less
construction cycles.
Pilot a market based incentive
approach for new
renovations in the residential
FY 17 Goals:
zero emissions. Begin
the feasibility of offering
program implementation.
new Cambridge buildings
Complete consideration of
height and/or FAR bonuses to
which commit to pursuing net
THE PATH TO A
LET ZERO
use of bonuses
Action 2.2.2: Height and FAR Bonus
CAMBRIDGE
Part of current Envision
Policy vetting and potential
Cambridge action prioritization
Timing of Envision Cambridge
process and regulatory limits to
FY 17 Progress, Barriers, and Next Steps:
implementation through Envision
THE PATH TO A
LET ZERO
CAMBRIDGE
Bring zoning amendment package to
City Council and continue study of
Previously delayed; requirements now
process
State building code barriers and
performance based options
ready for regulatory process
development of third-party review
FY 17 Progress, Barriers, and Next Steps:
Cambridge Zoning Ordinance
Action 2.3: Increase Green Building Requirements in
FY 17 Goals:
Green Building Requirement
Commissioning
major renovation projects
LEED criteria at the Gold'
over 25,000GFA to meet
Implement the Cambridge
level or better and Enhanced
that all new construction and
FY 17 Goals:
target net zero readiness.
Implement the established
policy that new construction
of municipal buildings should
ready
of Municipal Buildings
THE PATH TO A
MEI ZENU
CAMBRIDGE
Continued development of
New municipal buildings being
constructed to achieve net zero-
definitions for net zero standard
Action 2.4.1: Net Zero Requirement for New Construction
FY 17 Progress, Barriers, and Next Steps:
Continue implementation and
tracking of results
implementation in process
Resource limits to achieve
THE PATH TO A
multiple institutional goals
Initial planning complete and
A CAMBRIDGE
FY 17 Progress, Barriers, and Next Steps:
Action 2.4.2: Renewal of Municipal Buildings
FY 17 Goals:
operational improvements to
Public Works. The strategy will
technology and local capacity is
evaluation requiring increased
municipal facilities to achieve
Implement capital and
by the Cambridge Department of
involve continuous self-
targets established and tracked
improved.
performance levels as
FY 17 Goals:
to increased exterior
building renovations.
to the Cambridge Zoning
Implement a potential new
policy through amendments
insulation during residential
Ordinance to remove barriers
THE PATH TO A
HEN ZERO
CAMBRIDGE
context of other needs
package to City Council
Bring zoning amendment
potential zoning changes in
Regulatory prioritization of
Action 2.5: Removal of Barriers to Increased Insulation
Previously delayed; amendments
now ready for regulatory process
FY 17 Progress, Barriers, and Next Steps:
THE PATH TO A
MER ZERO
Fi CAMBRIDGE
Replace fossil fuels with low
carbon energy.
3.3 Develop a Memorandum of
Understanding with Local Utilities
3.2 Rooftop Solar Ready Requirement
3.1 Low Carbon Energy Supply Strategy
DETAILED ACTION PLAN
3. Energy Supply
begin.
FY 17 Goals:
FY17, at which point
should be completed in
Energy Supply Strategy
Study which will meet the
to complete a Low Carbon
implementation of strategies
identified in the study should
goals listed above. The study
Engage a qualified consultant
THE PATH TO A
LET ZERU
CAMBRIDGE
Action 3.1: Low Carbon Energy Supply Strategy
ready to pursue next steps
Advance recommendations
entities for successful action
Study completed in fall 2017
Coordination among regional
through regional collaboration
FY 17 Progress, Barriers, and Next Steps:
THE PATH TO A
MET ZENE
CAMBRIDGE
solar installation requirements
State code requirements adopted
Potential building code conflict
for buildings up to 3 stories
for taller buildings
readiness; begin consideration of
Voluntary commitment to solar
FY 17 Progress, Barriers, and Next Steps:
Action 3.2: Rooftop Solar Ready Requirement
FY 17 Goals:
buildings in Cambridge based
on recommendations made in
Implement solar ready
the FY16 study.
requirements for new
FY 17 Goals:
memorandum of
manage progress.
Complete and begin
implementation of a
regularly to monitor and
on areas of mutual interest
understanding (MOU) with
Eversource and Veolia based
and have senior officials meet
with Local Utilities
agreement
THE PATH TO A
MET ZERO
utility concerns
for utility dialogue
CAmBRIDgE ea
Determination of scope of
MOU process delayed due to
Action 3.3: Develop a Memorandum of Understanding
Leverage LESS implementation
FY 17 Progress, Barriers, and Next Steps:
-CO2
THE PATH TO A
+C02
MET ZERO
EL CAMBRIDGE
Option to invest in a net zero
community.
Investigate Local Carbon Fund
DETAILED ACTION PLAN
4. Local Carbon Fund
FY 17 Goals:
carbon otisets including
on potential standards for
of a Local Carbon Fund for
ownership and verification.
project scope, additionality,
Begin feasibility assessment
Cambridge, with an emphasis
scale
THE PATH TO A
LET ZERO
Action 4: Investigate Local Carbon Fund
forward on schedule
CAMBRIDGE
Feasibility study moving
Continue feasibility analysis
with stakeholder engagement
to achieving fund economy of
Stakeholder participation is key
FY 17 Progress, Barriers, and Next Steps:
THE PATH TO A
i CAMBRIDGE
Community engagement and
capacity building
Maintenance Plan Requirement for New
Construction
Getting to Net Zero Project
5.3 Net Zero Lab Standards and
5.2 Develop Ongoing Capacity to Manage
5.I Communication Strategy
DETAILED ACTION PLAN
5. Engagement & Capacity Building
FY 17 Goals:
comprehensive
develop and begin
Plan objectives and
implementation of a
components. Integrate
Over FY16 and FY17,
communications strategy
each Action as appropriate.
around the Net Zero Action
public communications into
stakeholder engagement and
THE PATH TO A
LET ZERO
Action 5.1: Communication Strategy
CAMBRIDGE
newsletter and website
of Net Zero Action Plan
outreach strategies such as
Continue development of new
Broaden community awareness
Implementation of multi-faceted
communication strategy ongoing
FY 17 Progress, Barriers, and Next Steps:
THE PATH TO A
MET ZERE
CAMBRIDGE
On track with implementation of
Complete annual report review
reporting structure
Ensure continued coordination
and ongoing program monitoring
among partner institutions
NAP management and
FY 17 Progress, Barriers, and Next Steps:
Getting to Net Zero Project
Action 5.2: Develop Ongoing Capacity to Manage
Continue monitoring roles and
FY 17 Goals:
Net Zero initiative over the
implementing the Cambridge
long term
responsibilities for
FY 17 Goals:
research integrity.
can be trialed without
industrial hygienists to
compromising safety or
research institutions and
of industry stakeholders,
for reducing energy use that
Continue work by a coalition
collaborate on new standards
piloting
THE PATH TO A
energy needs
Action 5.3: Net Zero Lab Standards
CAMBRIDGLI
Evaluation of potential
a Sustainable Future workplan
FY 17 Progress, Barriers, and Next Steps:
laboratory energy standards for
Diversity of laboratory uses and
In progress through Compact for
THE PATH TO A
ET CAMBRIDGE I
Custom Retrofit Program (1.1.2 and I.I.I)
buildings (2.3 and 2.5)
rooftop solar requirement (3.l and 3.2)
investigate energy upgrade intervention points (1.1.3)
FY19 Key Actions
• Consider pursuing BEUDO amendments and study
• Engage in USDN Zero Cities collaboration to
• Pursue LESS recommendations, including study of
• Adopt Green Building Zoning Amendments for new
Project Scope
Develop an energy
supply strategy for the
City of Cambridge that
to support the goals of
achieves a system-level
transformation in order
the Net Zero Action Plan
Supply Strategy
Low Carbon Energy
Strategies
Role of City
Policies and
Investment
Potential
Low Carbon
RES Potential
DEFINE
TO HELP
STRATEGY
Utilities
Role of
Energy
Storage
Opportunities
Work Package 2: Low Carbon Scenarios
assessment of City's current energy
Work Pacakge 3: Change and Benefit
economic viability assessment
Management
Development
supply and barriers to low carbon
• Work package 1: Baseline situation
• Work Package 4: Technical and
GAS
OIL
*& SUSTATNABILI
STRATEGY
COLLABORATION
ASSESSMENT
PROJECT COMPONENTS
Wind
Nuclear
Oil
gas
Natural
Coal
renewables
Solar & other
ELECTRICITY 39%
Oil
5%
Electricity
BBa
Electricity
COOLING
Solid fuel
HEATING
gas
Natural
NOTE THERMAL ENERGY SIGNIFICANCE
and CHP
renewables
Solar & other
District Heating
demand for heating will go down.
future, and correspondingly the energy
for cooling is expected to increase in the
Due to global warming, the energy demand
WORK PACKAGE 1: CURRENT ENERGY DEMANDS OF CITY -
Comm. & Man. Fuel Oil
Res. Natural Gas
Res. Electricity
Res. Fuel Oil
Gas
Comm. & Man. Natural
• Comm. & Man. Electricity
2012 Emissions.
Total Annual Consumer Energy-use Emissions
0%
90%
20%
70%
60%
30%
80%
50%
40%
10%
100%
2e
CAMBRIDGE COMMUNITY GHG INVENTORY
Kandal SaLar
Landuns parcain
Thermal Demand by KBTWeg.It
community
g
Existing demand
Change in demand by kBTUleq.ft
1.750 3,500
3.000
Fant
/ 51-75
31-40
75 - 100
| 101 - 150
151-200
CAMBRIDGE HEAT DEMAND: TODAY, 2030, 2040
Piqect ra 112002502)
the CiS uset communty
(cumart and change in demand 2030 and 20401
Change in demand 2030
Change in demand 2040
EarL. MERE, DaLone, Maptryinds, @ OpenSteeBlap controltura, ana
Eat HERE, Delam, Mapmylnds, O Cpendtoettap contbruturs, ane
RAMBOLL
2030
2000 COALINS
RAMBULL
eDU
Coning demand
TE/C8/2017
Bill, HERE, DeLamma, Mampinda, O OperStreatMap cardibutors, and
the Die Last barmanty
the O19 uner community
cutlert and chatte demand 2090 and 20401
CITY OF CAMBRIDGE ENERGY MASTERPLANNINO
Rajas no 0100025020
Change in demand
Change in demand 2040
7,000
1.750 3,500
16 - 21
21-25
26.50
/51-221
73-8
- 15-5
25-5
Change in demand by kBTU/eg.ft
demand
Existing
Ex! HERE, DeLorra, Maumida, © OpenStenVa
Cooling Demand by kBTUIcg.ft
10,500
2.005
CAMBRIDGE COOLING DEMAND: TODAY, 2030, 2040
GRID
SCALE
SCALE
LOCAL
CALE
DISTRICT
MOVING TOWARDS
RENEWABLE ENERGY
installations.
On a grid scale, support the New England state
initiatives towards wind energy and large solar PV
such as solar panels and heat pumps in our homes.
On a very local scale, install renewable energy sources
On a district scale, make our combined heat and power
plants more energy-efficient and phase out fossil fuels.
In order to reach our target we must work with renewable energy on several levels.
2019
Source: MA DOER
2017
2015
2011
2009
Requirements
RPS Classes I..
MA Energy Portfolio
2003
0%
20%
40%
CLEAN ELECTRICITY - SOLAR
Island
Rhode
Massachusetts WEA
Cape Wind Lease Area
MA Lease OCS-A 0501
MA Lease OCS-A 0500
ROW Grant OCS-A 0506
RI/MA Lease OCS-A 0486
RI/MA Lease OCS-A 0487
Massachusetts
Martha's
Vineyard
CLEAN ELECTRICITY - WIND
Management
Source: Bureau of Ocean Energy
< Nantucke
POTENTIAL NEW THERMAL ENERGY SOURCES
POTENTIAL NEW THERMAL ENERGY SOURCES
OUTBOUND
CENTRAL
I NOTAR ENTRANCE SE
WHOLE FOODS
ZONE 3
ZONE 2
ZONE 2
ZONS
ZONE 2
ZONE 5
ZONE 4
* - Potential CH
5- Alewife
3- Nort Point Development Area
4 - Alevite Develooment Area
2» Indindual supper
Supply Areas
Legend
WORK PACKAGE 2: SCENARIO DEVELOPMENT PROCESS
jobs.
costs.
choices.
delivered.
entrepreneurship.
GOALS -QUALITATIVE
• Predictable: Minimize rate volatility,
hardship, and promotes energy literacy.
• Affordable: Keep rates as low as possible and maintain competitiveness.
• Clean: Reduce carbon emissions and toxic pollutants created by the system.
• Innovative: The system spawns innovation, intellectual property creation, and
SCENARIO ASSESSMENT CRITERIA: CITY ENERGY SUPPLY
• Reliable: Minimize system downtime from outages and ensure high quality of power
• Local Control: Give residents greater control over their energy resources and energy
• Transparent: Consumers can understand their power costs and what drives changes in
• Just: The system promotes "energy equity," protecting vulnerable populations from undue
• Wealth Creating: Keep more energy revenue in the local economy instead of exporting it
to outside suppliers - to help drive local economic development, create new businesses and
HEAT PUMP
GREEN CERTIFICATES
HEAT PUMP
ELECTRICITY
SOLAR PV HEAT PUMP
SOLAR PU
POWER
HEAT PUMP
SOLAR PV
HEAT PUMI
SOLAR PV
HEAT
SCENARIO 1: INDIVIDUAL ELECTRIFICATION
SCENARIO 1: INDIVIDUAL ELECTRIFICATION
HEAT PUMP
DISTRICT ENERGY
STEEPERCY
ELECTRICITY
WIND TURBINE GREEN CERTIFICATES
SOLAR PV HEAT PUMP
MEAT PUMP
SOLAR PV
SOLAR PV HEAT PUMP
DISTRICT ENERGY
SCENARIO 2: DISTRICT ENERGY ELECTRIFICATION
plant
neatycooing
WHAT IS DISTRICT ENERGY?
Users
Heat/coaling
Figure: Danfoss A/S
Network
Distribution
BOILER
BIOMASS
SEWER CONNECTED
DISTRICT ENERGY
OLAR PY HEAT PUMP -
& ATES
THERMAL
STORAGE
(ERGY
CHP
BIOMASS
GREEN CERTIFICATES
DISTASTER
HEAT PUMP
ELECTRICITY
SOLAR PY HEAT PUMP
SOLAR PV
HEAT PUMP
SOLAR PV
HEAT PUMP
SOLAR PV
CONNECTED
SEWER
HEAT PUMP.-
CHP
BIOMASS
SOLAR PV
& ATES
THERMAL
STORAGE
DISTRICT ENERGY—
SCENARIO 3: DISTRICT HEATING AND COOLING SYSTEMS
recommendations
need for transition
engagement to facilitate their buy in
other similar events in Cambridge to
educate the public on energy and the
• Roll up designed for Science Week and
success of the strategy implementation
• Ramboll collaborated with City on public
• Public and stakeholder buy-in is critical to
• Implementation strategy to support study
Code: 8071
CARBON-FREE
PLANNING FOR
CAMBRIDGE
WORK PACKAGE 3: CHANGE AND BENEFIT MANAGEMENT
ENERGY IN CAMBRIDGE
Scenario Measures of Success:
• Business case can be made
• Maximizes locally sourced energy production
WORK PACKAGE 4: FEASIBILITY ANALYSIS
• Will match energy demand profile/consumption in 2050
• Sustainable and equitable
• Achieves goal of carbon neutrality
Item
SO_ emissions, ton
NOx emissions, ton
PM2.5 emissions, ton
CO_ equivalent, 1,000 ton
Annual costs for off-setting
SCENARIOS
50 $/ton in 2040) in million $
carbon emissions (at a price of
27
BaU
286
387
1.13
19.35
.21
8.1
112
162
Ind.
Electrification
DE
92
6.9
.17
137
Electrification
38
63
3.2
193
5.55
DE CHP
biomass
assume BAU
electrical grid
CO2 emissions
CLEAN: EMISSIONS IN THE YEAR 2040 FOR THE ASSESSED
carbon intensity
and carbon-neutral
91
171
68 %
3,531
1,386
DE CHP
BaU+284
56
86
72%
1,689
4,618
BaU+1,533
DE Electrification
67
74
Ind.
65 %
5,637
2,942
BaU+3,825
Electrification
72
BaU
600
112
84%
4,896
4,111
IN MILLION $ FOR THE ASSESSED SCENARIOS
AFFORDABLE: ECONOMIC RESULTS AS NET PRESENT VALUE
Variable operation & maintenance
Fixed operation & maintenance
Fuel costs
Capital Expenditures (CAPEX)
Item
Fuel share
TOTAL in million $
KEY CONCLUSIONS
decarbonization of the regional grid.
commitment of carbon neutrality by 2050.
require a combination of approaches over time.
systems in areas of high energy demand and depends on
Business as Usual pathway locks in fossil fuel infrastructure in
environmental efficiency without introduction of district energy
• Electrification of buildings with grid-supplied electricity is likely to
play a central role, but can't achieve acceptable levels of cost and
• Decarbonization of the energy supply for Cambridge buildings will
• There are limited energy supply resources within Cambridge, yet a
buildings and the supply chain in a way that precludes meeting the
must be considered in the context of a regional clean energy
coordinated manner.
group which can identify and address key questions and barriers in a
flexibility of energy sources, including biomass, which requires
transformation.
further consideration.
KEY CONCLUSIONS, CONT.
• District energy offers increased system efficiency, resilience and
• Such consideration should occur through a regional stakeholder
• Achievement of a future low carbon energy supply for Cambridge
areas
energy
outstanding questions
• Promote rooftop solar deployment
NEXT STEPS FOR LCESS IMPLEMENTATION
• Continue analyzing viability of CHP fuel source options
• Consider siting large generation plants (eg: Mystic Station)
• Promote electrification of buildings in less-dense areas
• Continue analyzing feasibility of district heating and cooling in high density
• Engage regional partners and stakeholders to answer and address
• Support state and utility action to modernize the grid and develop renewable
[phone removed]
Thank You!
THE PATH TO A
NGT ZERO
CAMBRIDGE
sfederspiel@cambridgema.gov
www.cambridgema.gov/netzero
Heat production (GWh)
200
1,400
1,200
1,000
2020
2021
2023
2024
2025
Gas Boilers
Existing CHP
2026
2027
2028
2025
2030
Year
2092
2032
2033
2035
2035
2037
2038
2039
DEVELOPMENT OF HEAT DEMAND IN ZONE 1 FOR BAU SCENARIO
2040
2045
2039
2038
2037
2036
2035
2034
2033
2032
2031
Electric Boilers
2030
Year
2029
2028
2027
2026
2025
2024
2023
Existing CHP
Gas Boilers
2022
2021
2020
200
000
1,200
1,400
Heat production (GWh)
DEVELOPMENT OF HEAT DEMAND IN ZONE 1 FOR SCENARIO 1
Heat production (GWh)
100
200
400
600
[phone removed]
2021
2022
2023
Gas Boilers
2024
2025
2026
2027
2028
2025
Year
2050
2052
Electric Boiler
2082
2033
2034
Air Source
Heat Pump
2035
Ground Source Heat Pump
2035
2037
2038
Energy Storage
Aquifer Thermal
2039
DEVELOPMENT OF HEAT DEMAND IN ZONE 2 FOR SCENARIO 1, 2, 4
2040
2040
2039
2038
2037
2035
Electric Boilers
2035
2034
2033
Heat Pumps
Water Source
2032
2031
2030
Year
2029
2028
2027
2026
2025
2024
2023
Existing CHP
2022
Gas Boilers
202(
2020
200
1,400
3,200
Heat production (GWh)
DEVELOPMENT OF HEAT DEMAND IN ZONE 1 FOR SCENARIO 2
Heat production (GWh)
200
1,400
1,000
500
800
1,[phone removed]
2021
2022
Gas Boilers
2023
2024
Existing CHP
2025
2026
2027
2028
2029
Year
2030
2031
2032
2033
Biomass CHP
2034
2035
2036
2037
DEVELOPMENT OF HEAT DEMAND IN ZONE 1 FOR SCENARIO 3
2038
2039
2040