Search ▸ Communication to the City Council
a report from Councillor Dennis J. Carlone and Councillor Craig A. Kelley, Co-Chairs of the Ordinance Committee, for a public hearing held on August 8, 2018 to discuss City Council petition to amend the Zoning Ordinance in Article 5.000 as it relates to rainwater and flat roofs
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative.
ATTACNMENTA
To:
Planning Board
From: CDD Staff
Date: August 3, 2018
Re:
Zoning Petition on Converting Flat Concave Roofs
This City Council zoning petition would allow the Board of Zoning Appeal (BZA) to grant
relief from certain dimensional zoning requirements for existing buildings with flat
(concave) roofs and existing central drain lines connecting directly into the City sewer.
The relief would allow a partial new story to be built above the existing roof of the
building in exchange for disconnecting the central drain line and meeting other criteria.
Past Zoning Proposals
The Planning Board has considered versions of this zoning proposal in the past, first in
2013 and most recently in 2016. in either case, the Planning Board did not recommend
adoption and the petitions expired with no action by the City Council.
Attached to this memo are documents provided for these past petitions, including
. Planning Board recommendations and staff documents, which contain relevant
background information related to the proposal and issues raised in past discussions.
Current Petition
There are a few substantive differences between the current petition and past
proposals, inciuding the following:
• The current petition notes that buildings "may have poor upper-level thermal
insulation and/or contribute to important heat island effects, or may suffer from
the secondary effects of overinsulation," and includes as a criterion that
projects "significantly increase the thermal efficiency of the building."
Prior and current petitions require rainwater to be "dispersed at the ground to
follow its natural path," while the current petition also requires rainwater to be
"harvested on the property at the rate of 1/8 gallon per square foot of roof
area."
• The current petition includes "installation of solar panels (impractical on
residential flat roofs)" as a review consideration; it is not explained why solar
panels would be considered impractical.
The relief that may be granted is the same as in prior proposals: an additional 10 feet in
height above the existing roof line and up to a 20% increase in floor area ratio (FAR), but
additions must be set back at least 6 feet from the existing roof parapet on the front
side and 3 feet from the existing roof parapet on other sides. The title of the petition
references "a kind of greenhouse/glass porch," but no other standards are specified.
CITY OF CAMBRIDGE, MASSACHUSETTS
PLANNING BOARD
CITY HALL ANNEX, 344 BROADWAY, CAMBRIDGE, MA 02139
Date:
June 7, 2016
Subject:
Rainwater Separation from Flat Roofs Zoning Petition
Recommendation:
The Planning Board does NOT RECOMMEND adoption.
To the Honorable, the City Council,
On May 24, 2016, the Board held a hearing on this City Council zoning petition, which would
create a new Section 5.55 in the Zoning Ordinance to allow limited modifications to dimensional
requirements (including FAR and height) by special permit from the Board of Zoning Appeal for
improvements to buildings with flat or concave roofs that would result in disconnecting rooftop
drainage connections from the public combined sewer system.
The Board heard a presentation from Councillor Craig Kelley and discussed the proposal. No
other members of the public appeared to testify. The Board also received material in support of
the proposal by Nicolai Cauchy. The Board had heard a version of this proposal, with slight
differences, in 2013, and received materials from the Community Development Department
(CDD) and Department of Public Works (DPW) that were prepared at that time along with the
Planning Board's prior negative recommendation on that proposal.
At this time, the Board finds merit in some aspects of the proposal. Given the age of the housing
stock and the desire among families in Cambridge to make use of existing homes, there is some
benefit to providing a mechanism by which people can make better use of available space,
including, in some cases, rooftop space. It is also true that there is some environmental benefit to
disconnecting drain connections from the combined sewer, although the material previously
provided by DPW indicates that such benefit is modest in comparison to certain other
infrastructure improvements that are required of the City. Councillor Kelley noted that the
improvements envisioned in this proposal can also allow for better removal of snow and ice from
roofs.
However, the Board has several concerns about this proposal. The primary concern is that
allowing the addition of a partial story to a building would create significant value for one group
of property owners, that is not necessarily balanced by the benefit to the public. The Board also
questioned whether the City should prefer and essentially reward this one group of property
owners over other property owners who might propose different environmentally beneficial
renovations to their properties. If the Council wished to consider allowing homeowners more
flexibility to add space to existing buildings in return for environmentally beneficial renovations,
there should be a broader consideration of the types of public benefits that could be achieved
Page 1 of 2
City of Cambridge, MA • Planning Board Recommendation
Rainwater Scparation from Flat Roofs Zoning Petition
through such allowances. If environmental sustainability is a focus, consideration should be
given to the objectives of the Net Zero Action Plan and Climate Change Vulnerability
Assessment, which aim to address the causes and expected impacts of climate change. Housing
affordability is also a major City goal that might be taken into account when considering where
greater zoning flexibility might be justified.
In addition, Board members have some concerns about allowing additional height to these
particular buildings, as the three-decker is a pervasive and iconic development form in many
neighborhoods, and the allowance of an additional story may disrupt that prevailing character.
determine where such additions would or would not be appropriate, and where they might be
objectionable to neighbors who would not be entitled to the same benefit if their homes do not
have flat roofs and central drain lines.
In conclusion, while the Board is generally supportive of approaches that might allow greater
onung ilexibility tor homeowners in exchange for making their homes more environmentall
ensitive, Board members believe that more consideration is needed to determine what specifi
public objectives would be best served by allowing property owners to increase the usability and
value of their homes, and to determine a fair way to balance the expected private benefit with
those public objectives.
Respectfully submitted for the Planning Board,
Headed De
H Theodore Cohen, Chair.
June 7, 2016
Page 2 of 2
To:
Planning Board
From: Jeff Roberts, Land Use and Zoning Planner
Date: May 17, 2016
Re:
Rainwater Separation from Flat Roofs Zoning Petition
On May 24, the Board will hear a City Council zoning petition that is a refiled and slightly
revised version of a zoning petition heard by the Board in 2013. Attached to this cover
memo are the Board's recommendation on that prior petition, along with past materials
provided by staff. An explanatory package from Nicolai Cauchy, an advocate for the
petition, is also provided.
Overview
The proposed zoning petition would allow the Board of Zoning Appeal (BZA) to grant a
special permit to authorize, within limitations, the construction of a partial top story on
an existing residential building with a flat or concave roof, if such construction would
enable the disconnection of an existing storm drain line from the City's sewer system.
This allowance would be available in any district for any residential building with the
existing condition described above. The concept is that such a change would reduce
stress on public infrastructure, but would not be economically advantageous for a
property owner to undertake without some other improvement to the property.
The current petition maintains the previously proposed limitations that any addition can
be no more than 10 feet above the existing roof line, cannot increase the FAR on the
property by more than 20%, and cannot constitute a new dwelling unit. In addition, the
current petition proposes a new requirement that the added top story be stepped back
at least 6 feet from the front roof edge and at least 3 feet from all other roof edges.
Comments
As noted in the attached Planning Board recommendation, the key consideration is the
balance between the environmental benefits of removing drain connections and the
potential impact of adding stories to buildings in residential neighborhoods that may
have a fairly consistent established height. The added requirement for step-backs might
help to mitigate this impact. It is difficult to determine exactly how many buildings
would be eligible for additions under this proposal, but the information previously
provided by the Department of Public Works shows that within neighborhoods, there
are highly varied existing conditions, and therefore some buildings would be eligible for
the proposed special permit while many others would not.
Also, the attached 2013 report from the City Engineer notes that there would be some
public benefit to separating storm drains, but the benefit is modest in relation to other
priority improvements that are being undertaken by the City.
CITY OF CAMBRIDGE, MASSACHUSETTS
PLANNING BOARD
CITY HALL ANNEX, 344 BROADWAY, CAMBRIDGE, MA 02139
Date:
September 3, 2013
Subject:
Craig Kelley Petition (Flat Roofs / Rainwater Separation)
Recommendation:
The Planning Board DOES NOT RECOMMEND adoption of the
proposed zoning amendment, but suggests alternative approaches.
To the Honorable, the City Council,
The Planning Board considered this proposed zoning amendment at a public hearing on June 18,
2013 and continued deliberation on September 3, 2013. The proposal would create a new Section
5.55, which would allow increases in the Gross Floor Area and height of existing residential
buildings by special permit as an incentive for property owners to remove internal drainage
connections to the City sewer from buildings with flat roofs. The Planning Board heard
testimony from Nicolai Cauchy, a resident who supports the petition, and from Owen O'Riordan,
the City Engineer and Acting Commissioner of Public Works.
The Planning Board recognizes the environmental benefit of removing these direct central drain
connections, which would reduce rainwater intake into the combined sewer system and help to
mitigate the impacts on water quality that result from sewer system overflows. In addition,
allowing rainwater to collect into the ground rather than being directed into the sewer system
would promote groundwater recharge, which would benefit watershed protection. However, the
Board also acknowledges that the environmental benefits would be modest, given that only a
fraction of rainwater is collected on rooftops, and that most rainwater runoff from rooftops
would continue to enter the sewer system eventually.
It is not typical in Cambridge to allow buildings to add an extra story above the height limit,
particularly in close-knit neighborhoods where buildings with flat roofs are most common and
the prevailing height tends to be three stories. Allowing those buildings to add a story would
significantly increase property values for some owners, by providing greater floor area and
views, while other owners in the same neighborhood would not be able to enjoy those benefits
and would be impacted by the increased size and height of nearby buildings.
Therefore, the Planning Board believes that the public benefit to be gained by the removal of
central storm drains would not justify the impact of allowing the construction of an extra story on
residential buildings.
On the other hand, the Board believes that there is merit in allowing some modest zoning
flexibility to facilitate the removal of central storm drains where the property owner wishes to do
Page 1 of 2
City of Cambridge, MA • Planning Board Recommendation
Craig Kelley Petition (Flat Roofs / Rainwater Separation)
so. Allowing property owners a few feet of height relief by special permit, rather than a variance,
could facilitate the alteration of a concave roof that collects rainwater into a pitched roof that
allows water to run off onto the property. As a modest incentive, additional Gross Floor Area
could be allowed by special permit for the creation of a small roof deck, so that the owner could
increase the value of the property by adding some usable open space and views in the process of
making the necessary roof alterations. This incentive would be better scaled to the resulting
public benefit, and would avoid some of the impacts of adding significant height and mass to an
existing building in an established neighborhood. Potential concerns around privacy, noise and
other impacts would still need to be considered in the special permit review process.
The Board suggests that the Council consider this strategy as an alternative to the proposed
zoning amendment.
Respectfully submitted for the Planning Board,
Hugh Russell, Chair.
September 3, 2013
Page 2 of 2
CITY OF CAMBRIDGE
COMMUNITY DEVELOPMENT DEPARIMENT
BRIAN MURPHY
Assistant City Manager for
To:
Planning Board
Communily Develorment
From: CDD Staff
Date: August 28, 2013
Re:
Craig Kelley Zoning Petition (Stormwater Separation)
In response to the Planning Board's discussion at the June 18 meeting, we have
prepared information on the following topics:
• The range of properties affected by the proposed zoning
Possible alternatives to increased FAR and height as an incentive to eliminate
central drain lines
Affected Properties
The properties that might take advantage of the proposed zoning include existing
buildings with flat roofs and drain pipes that collect water runoff from the roof and
discharge it directly into the City sewer line.
Data sources maintained by the City with information on existing buildings are not
detailed enough to make an accurate accounting of the number of buildings that fall
into these categories. In the memo to the Planning Board dated June 18, 2013, the
Department of Public Works (DPW) provided some analysis of a small area in the vicinity
of Concord and Huron Avenues that was performed as part of the City's Alewife Sewer
Separation Program. DPW inspected 690 properties in the area and found 67 residential
buildings (approximately 10% of the total) with flat roofs and internal drain systems
connecting to the City sewer.
There are approximately 11,000 residential buildings across all of Cambridge. If the
overall building stock is assumed to be comparable in its mix of building types, the
number of buildings with flat roofs and direct drain connections would be
approximately 1,000.
However, briefly scanning an aerial view of Cambridge reveals that the Concord/Huron
area has a smaller proportion of flat-roofed buildings than neighborhoods in the eastern
portion of the city, such as East Cambridge and Cambridgeport. While there are some
neighborhoods that have a similar building stock to the Concord/Huron area, there are
others where the proportion of flat-roofed buildings is likely around half or more.
Therefore, the actual number of affected properties throughout the city is likely to be
344 Broadway
greater than 1,000, possibly numbering between 2,000 and 3,000.
Cambridge, MA 02139
Voice: [phone removed]
Fax: [phone removed]
TTY: [phone removed]
www.cambridgema.gov
Craig Kelley Zoning Petition (Stormwater Separation) - Memo to Planning Board
Alternative Incentives
Allowing an increase in allowed height and floor area to build an additional story on existing residential
buildings would be a substantial benefit to property owners. The cost and disruption that would be
required to modify an existing drain line would also be substantial, but many property owners may be
enticed to make those improvements given the increase in value that would result. However, as the
Planning Board noted in its discussion, allowing ten-foot increases in height would potentially have
negative impacts not just on abutters, but on the character of entire neighborhoods where there is
currently a uniform prevailing height.
One possibility that was raised is the allowance of usable decks or green spaces on rooftops. Such spaces
are currently allowed under zoning. However, usable open spaces that are located above the second
floor of buildings are counted as Gross Floor Area (GFA) on the lot, and therefore owners typically do
not provide such spaces in favor of maximizing the GFA provided within the building. Also, roof decks
usually require a stairway and headhouse for users to access them, which are not exempt from height
limitations and therefore can be an impediment to building a roof deck. In situations where owners have
sought zoning relief to build roof decks, neighbors have often opposed the request because of concerns
about noise and privacy impacts.
Aside from relief on height, floor area or rooftop open space, it is difficult to conceive of a zoning
incentive that would be appropriate to the type of modification that is desired. Possibly, a few feet of
additional height could be granted to facilitate the improvement of roof drainage systems while
providing more spacious top floors and possibilities for skylighting without having to seek a variance.
This would provide some modest benefit to property owners while minimizing potential impacts on
direct neighbors and avoiding the overall impacts of increased floor area within neighborhoods.
However, it is possible that the increased value of additional height without additional floor area would
not be sufficient to offset the cost of the improvements.
August 28, 2013
Page 2 of 2
DEPARTMENT
MORES
June 18, 2013
To:
Brian Murphy,
Assistant City Manager for Community Development
From: Owen O' Riordars
City Engineer
Re: Flat Roof Zoning Petition
1 have been asked to provide comments on the zoning change proposed vis-à-vis flat roofs that
contribute extraneous stormwater discharge to the City sewer systems. At the outset it should be
stated that the Department of Public Works is broadly supportive and wants to encourage, to the extent
that it is reasonable, the elimination of all sources of extraneous flow to our municipal sewer system.
Extraneous flow, be it from rainfall or groundwater, contributes to combined sewer overflows polluting
our rivers and streams. It is also causative of sanitary sewer overflows and back-ups into homes and
basements causing public health issues for homeowners and businesses. Finally, every drop of additional
water discharging to our sewer systems has to be paid for, as the Massachusetts Water Resources
Authority wholesale charges are partially based on flow received from contributing communities.
The municipal drainage system in Cambridge was originally constructed as a combined sewer system.
The City has a well established program to separate sewer and drainage lines throughout the City. At
this time approximately 65% of the municipal system continues to function as a combined sewer
system. The Department of Public Works is presently in the middle of a large program in the Alewife
watershed to separate the combined sewer system. After the work in this neighborhood is completed
the number of times combined sewerage discharges (CSOs) to the Alewife and volume associated with
these occurrences will be reduced from 60 times a year to 7 times per year and from 50 million gallons
per year to 7.8m gallons per year respectively. The reductions achieved as a result of this effort will
meet the Environmental Protection Agency (EPA) goals for combined sewer overflow control for the
Alewife Brook. The analysis completed in designing the new separate systems in this watershed
provides some details that assist in illuminating the issues that are the subject of this petition, but given
the different goals associated with the sewer separation project and the zoning petition the data may be
insufficiently detailed to answer all questions that may be asked.
CAUGIRAI
Alewife Sewer Separotion Program
A twin goal for the City in completing this work is to improve sewer and stormwater service levels in
these areas. As a result of an incremental analysis the City determined that in order to achieve the CSO
standards demanded and to eliminate sewer system back-ups except in the most extreme
circumstances it will be necessary to eliminate 75% of the private sources on infiow to the municipal
sewer system. After completing a house to house inspection of 90% of the 690 properties in the
watershed area associated with this program we have identified those properties where inflow removal
is both cost effective and minimally disruptive to residents. To that end 176 properties have been
targeted for inflow removal, none include properties where stormwater and sanitary waste combine in
one pipe stack constructed through the center of the property.
The attached maps illustrate the extent of the investigations completed by DPW as part of this effort.
We have identified sixty seven (67) flat roof buildings within the overall area. Of those buildings forty
eight (48) have two internal pipe systems, one for sanitary waste and one for rainfall conveyance. Of the
forty eight buildings identified with two pipe systems, thirty one (31) have been selected for inflow
removal, Of the nineteen (19) buildings with a single stack conveying stormwater and sanitary waste in
one pipe down through the building, none of these have been selected for sewer separation. These
building were not selected due to the significant work required to either internally separate these pipes
or reconstruct the pitch of the roofs.
In summary, The Department of Public Works is not opposed to this petition; removing stormwater from
sewer systems is an important goal of the City. However, we recognize that there are complexities
associated with this proposal. The City expects to achieve a level of inflow removal in the Alewife
watershed to meet the requirements of our EPA permit for CSO control. This will be achieved by
completing a sewer separation program throughout the neighborhood which will include eliminating
approximately 75% of the private sources of stormwater and groundwater inflow to our sewer systems.
None of the private properties identified for inflow removal are of the type which is the subject of this
petition. The primary reasons for not including these properties are that the work required to internally
separate the systems is too expensive and the work would be too disruptive to those living in these
buildings.
Lisa Peterson; Commissioner of Public Works
Cc:
Figure 10 - Sanitary Service Connections
Huron A, Huron B & Concord Ave Project Areas
Legend
US Building Sanitary Sernce Connected to Storm Drain
[CONCORD AVE
Buiding Sanitary Serica Corrected to Combined Sewer
Sta Buding Saritary Service Connected to Combined Sowar Frevously Classified
as Storm Drain whin City GIS
Builaing with Sanitary Service Connector to Sanitary Sower or Not Inspected
lespection Rasuits from 199B-2001
Storm Drain
Sahitary Scabr
Combined Sewer
Combined Stwer Provousty Cassified as Storm Drawl within Cly GIS
Storm Dran Mahholo
Saniary Sewar Manhole
Combined Serpar Mechale
Huron A, Huron B, & Concerd Ave Hydraulic Ecundares
Notes:
1. Conditons from 1998-2001 building inspectan resuits are
2. Inspecton rosuls may include buildings outside of Huran A
Huron B and Concord Ave project areas
some cases been altered to reflect the fact thal those piper
currently serve as combined sewers (Sea taxi of Huron A Field
48783-
FRESH.
POND
HURON A
300283091
No. of Buildings with
No. of Buildings with
Sanitary Service
Sanitary Service
Connections to
Connectionsto
HURON Bed
Storm Drain
Combined Sewer
***
a Project Area
.: -
100
Huron A
Huror B
139
Concord Avenue
-Total
276
Figure 11 - Sump Pump Connectivity
Huron A, Huron B & Concord Ave Project Areasf
Legend
(B352) Buidings with Sura Pump Corinecson; lo Slim Daln
CONCORD AVE
BiNdungs wch Sump Putta Corocions 1o Sardary Sewer
is Buitings wit Sump Purra Cornections lo Combined Sewer
Braidings wnth Unknown Sump Pure Dischages
Buddings with Sump Puro Connections do Suctice is Drynel
Buidings wilh No Stamp Pump or Not Inspectod
22 Inspection Resulls tran 1898-2301
som Jan
Santary Sewer
Santary Sewar Manhole
Combited Sewer Manhoe
At Haron A Huron 8, and Corcart Are Hichaut Buyardy
¡HURON A
FRESH
POND
No. of
Ma. of
No. of
No. ad
Bulldines
Bulletings
Bulldings
wath
Bull dines
with
with
: Stomp Primp.
Sump Pump
Summer Pump
Sump Putto
* HURON B
UR NOWI
comecoon connacon to Canned An
Connection
Jump Pump
to stom
Sanitary
to Sartaro org
Draln
¡Project Area
Drywell
Start!
16
Huton 3
ConcorDA
215
pinna!
1041=
Figure 12 - Roof Drain Connectivity
:Huron A, Huron B & Concord Ave Project Areas
Legend
CONCORD AVE!
MILE Fact Lester Connectan to Stem Desin
i.r:
RE Root Leader Corecson la Sariay Sewer
22l Roof Loader Connecion la Combined Seror
¡ Flatticol Drain Coupston lo Stann Dran
Flat Roof Oraln Cornacticuto Baritory Gener
Flat Root Drant Connestim to Centertal Soner
• Ruling wnt Root Grain to Surtaçe or Drywall or Not wagede
TReats tron: 1959-2001 aspecton
5tomm Brain
.... Sanitary Semet
Comtered Seror
S4arn Drain Manholo
Sanilary Sewer Mersole
Combinad Sear Harlie
Iron A, Huros R. and Concos Ava Hidravic Boundarios
Notes
1. Conditons from 1$99.2001 bullng inspection resuits ara
2. utspoclions results may Includa buäfings outside of Hurn A.
Muron B and Concord Aur, moject a tas
FRESH.
EE SES+**
HURON A
POND
65089
garrera
No.ct
No. of
Na. ot
* 5981
No. of
No. of
No. of
ВИНИЛАС
Bulldinge
Buttino
Bussdingg
Building
with
with
with
with
wish
Flat Road
Acol Leader Rootleadar
HURON B
Drain
Drain
Drain
25.
Connection Connertionto Connection
Connecton
Connaction Cornertion!
Sanitary
10 Storm
to Combined
to shamm
to Sanitary to Combined
* 24,
DrEn
SoWAr
Sewer
Sewer
2940s
37
...
219*37
ATACHMENT B
of peripheral planters
Gutters harvest rain water for irrigation -
Zoning Ordinance Amendment 5.55
Residential flat roof conversion proposal
allows heat in winter
keeps cool in summer
(vine, morning glories...)
basic vegetative coverage
ssions
Goal A: Minimizes greenhouse gas
Objectives for 2020
Committee Goals and
emissions from all measurable sources
14.1% of Cambridge's greenhouse gas
emissions are from residential buildings
Climate Protection Action
http://www.cambridgema.gov/CDD/climateandenergy/greenhousegasemissions/communityemi
by:
for the costs of roof construction
drains and the buildup of snow and ice
flat roofs, thus cutting greenhouse gas
FLAT ROOF AMENDMENT
1. Protecting roofs from frozen center roof storm
Entices residential property owners to insulate
2. Providing extra FAR and/or height to compensate
emissions associated with heating and cooling,
roof conversion
Protects neighbors by:
natural paths "without direct
1. Requiring a Special Permit prior to any
encumbrance onto abutting properties"
2. Retaining stormwater onsite or following
FLAT ROOF AMENDMENTS
• damaging flooding
accumulated ice and snow
*There are different schools of thought on this
Currently...
• snow and ice buildup on the roof and
Insulated flat roofs are likely to result in*
associated ice dams in the center drain
• structural challenges due to the weight of
drain
into sewer
roof = clogged
roof: snow melts
Well insulated flat
Poorly insulated flat
insulated
5 days after snow storm, insulated roof:
3~4 inches of frozen snow cover 4" solid ice
Uninsulated Roof Day 5
Central drains clog when a flat roof is
Climate change:
frozen drain = snow overload and
associated roof shoveling dangers
Concave roof with cen
all roof water
Roof drain collects
waste water lines
(kitchens & baths)
water from local ecosystems
Combined Rain and Sewage
showers, etc.
Tie-in to toilets,
our MWRA treatment load and removing
that combine rain with sewage, adding to
Additionally, flat roots have center drains
experience
6,000cf/yr of rain*
A single Triple Decker gathers
And 1/3 of sewer input for a three-family
building could be RAIN! (Nicolai Cauchy's
*Ref.: 1500s.f. area; 4' annual rainfall; 7.5gals/c.f.; sewer tax $8.3/Ccf (Ccf=100c.f.); Typical Triple Decker consumes 130Ccf/yr (FY2010)
- Heat islands in summer
• Liability for homeowner
• Disincentive for ecology
Concave roofs are bad!
- insulation in attics causes drain to freeze
• Costly sewer input for City and residents
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
construction costs
ice/snow buildup
return it to local ecosystems
insulation of residential flat roots by
- Create FAR/height options to compensate for
• Incentivize greenhouse gas reducing
• Eliminate rainwater from sewage and
Purpose of ZO Amendment 5.55
- Reducing concerns about clogged drains and
- Entice ecological use of roof area
• PROVIDE relief for homeowners:
- "Lightweight" structure, "translucent"
• AVOID proliferation / development:
- Shed snow and eliminate central drain
- Added space is not a separate floor or unit
Scope - who to help and avoid
- Water: 3.24/3.19 $/Ccf =>1.5%
- Sewer: 8.32/7.71 $/Ccf =>7.9%
FY 09-12 (Block 2, typical triple decker):
increasing!
Cambridge sewer rates increasing 5 times faster than water
Cost of rain dumped into sewer
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
but maybe
Sources: Cambridge BZA at Variance Appeal 12 Apr., 2008 "Cambridge has over 2400 triple deckers"
2400 <TplDkrs in Cambridge= COSTS
$1,4M/yr @ "tax payers rate"
City=7.13 sq. mi.; estim. 60% of flat area residential buildings (10% business/univ.; 30% green + streets); 10,000 resdnl.bldgs.; 2% TpIDkr
at least $200K/yr @ "MWRA rate"
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
Xpert
Building
Solutions
*- TripleDeckerficor
Design
Concave roof with g
Engineering
Construction
loads
Liability to homeowners: numerous cases
• Frozen drain
snow off edge
[phone removed]
increasing snow
overload on roof
• "Global warming" =>
ERTIRED F
• Liability when shoveling
CAD SAFE
• Pipes crack inside walls
• Causes overflow and
Licensed G.C.
M.I.T. engineer
3. Bad for ecology
2. Liability to homeowners
Flat roots are
1. Cost to the City >5200K/yr (maybe $1.5M?)
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
City gains
Owners gain
• increases property tax revenue?
• Reduced rain water into sewage
• Usable roof with many green opportunities
• Peace of mind from risk of failure, snow, etc...
can solve these problems!
A small relaxation of height limit
• Improved insulation & ecological temperature control
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
Xpert
Building
Solutions
Rainwater
(gutters at
diverted to
the ground
eliminated!
gambrel) or
use on roof
recycled for
Central Drain
Design
Construction
Illustration of one design option
cooling
heating
[phone removed]
shading
enhance
seasonal
High-level
cover with
pollination
Convective
Passive solar
ventilation and
Vegetative roof
SEPA
RTIFIED T
flowering plants
LEADISARE
Licensed G.C.
M.I.T. engineer
2. Zoning
• Roof height
3. Increase in population density
Concerns about relaxing Z.O. limits
1. Impact on neighbors and visual aspect
• FAR (floor area ratio ~= living area/lot size)
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
Front view from 40ft away
green plants
Visual representation: minimal impact
Side view from 15ft away
currently:
higher than 387 flat
391 Huron Ayé. (approx, contour)
Proposed 387~3 higher than 391
387 Huron: Height perspective
overhang
perception
space between
• INVISIBLE from
neighborhood (all
buildings & crown
• New roof being set
• Pitched roof design
pitched except one
brings harmony with
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
back offsets the height
neighbor due to narrow
ed root line
Stovepipe
no impact on natural light
equidistant lines from
Even adjacent to a third floor dormer,
for light/view
No impact on neighbor's natural light or view
In other City areas where triple deckers are
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
concentrated the crown overhang determines angle
• FAR
existing FAR
and 6' (front)
• VISUAL IMPACTS
• Maximum roof height
• ZO 5.55 limits height gain to 10'
• ZO 5.55 suggests a limit of 20% over
Addressing zoning concerns
• Setback requirements of 3' (sides and rear)
+ increased snow load
Shallow slope, ice dams
incentive for owner
Expensive and little
Alternatives that have been suggested
Snow load still an issue
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Central drain not eliminated
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
BUT
gardens)
• Eliminates rain drain
• Addition is costly for homeowner,
• Owner gains functional, usable space
(third floor residents don't use street level
Z.O. §5.55 entices ACTION
• Has incentives for grass-roots green innovations
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
• City earns tax $$
• City saves sewage $$
• No intrusion on neighbors
• Multiple safeguards against abuse
• Reduce risk of leaks for homeowner
• Incentive for innovative/green design
Win-win situation!
Z.O. §5.55 Benefits all parties
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
architects
Concord area rain/sewer separation survey)
rain/sewage water on their flat roof.
Support Z.O. §5.55!
Support from several Cambridge and Huron
homeowners to take on the cost of separating
do the work for all it would save us!"
"The City should PAY owners willing to
(Engineer Dennis Carr, lead Engineer for the City regarding this proposal in the context of Huron
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Z.O. §5.55 saves the city $$ at zero cost, by inciting
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
Gutters harvest rain water for irrigation
of peripheral planters
adjustment
windows for seasonal
(lattice + vines) at all
vegetative sun shades
allows heat in winter
keeps cool in summer
(vine, morning glories...)
basic vegetative coverage
ZO 5.55 is good common sense
Innovation, Ecology, and Economies
design
scale -
Drawings
not to exact
primarily for
suggestions
front/street-side of building,
season enclosed porch within the following limitations
ZO 5.55
• Additional FAR* not to exceed 20% of the existing FAR of the building
Additional height not to exceed 10 ft. above the existing roof line of the building
•Side walls and roof shall be mostly translucent above 4 feet from existing roof, and
said rain water is either recycled or led down to the ground to follow its natural path,
the use of natural light, and harmonization of the new roof profile with surrounding buildings.
• entirely eliminate rain water entry from the concerned roof into said sewer line and that
Furthermore, in enhancing sustainable development and alternative energy sources (Article 22), additional
a Special Permit may allow the construction of a partial light-weight structure such as a greenhouse or 3-
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
positive consideration will be given to "sensibly green" projects that improve the use of passive solar heating,
convective cooling, seasonal shading with natural plants, harvesting and/or using rainwater at the roof level or
a flat (concave) roof, on which a drain pipe collects water from the roof and combines it with household waste-
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
In an effort to further the City's storm-water management, and to alleviate hardships resulting from heavy snow
loads, modifications to the applicable dimensional requirements of this Article 5.000, in particular regarding FAR
• Footprint to be no closer than 3 feet from either long edge or rear side of the building, no less than 6 feet from
water, discharging into a single outflow pipe to the municipal sewer line, provided that the resulting construction
floors below, planting flowering bushes and vegetation attractive to pollinating insects at the roof level, maximizing
and height limitations, may be authorized for eliminating rain-water from sewer lines on residential buildings with
• 4-level homes in Cambridge
antin far eliminatina rainwater
Cambridge Zoning Ordinance:
Supporting Amendment 5.55 to
• Ice damage & snow load/ice load liability
Annex/Additional material
(some were apparently allowed in 1973 oil crunch)
A few of many Cambridge residences with 4 levels
regards,
of the roof area."
covering, as well as access to passive solar heating and concentrators. Regards"
Neighbors who wrote directly to PB
• Peter Wilson, 451 Huron Ave.: " wanted to express my support amending the height
limitations so that owners of flat roof homes can make senseful ecological conversions,
Tancredi Botto, Broadway: "with this letter I wish to express my support for Policy Order
including separation of rainwater from sewage, small roof gardens, greenhouses and vegative
2016#84, to amend zoning ordinance 5.23 in order to allow exceptions to the maximum height
of allowing exceptions to the maximum height in Z.0.5.23 as may be decided by the Ordinance
Brian Thompson, Appleton St.: "My wife, Marie-Claude, and I have been homeowners at 168-
Committee, and in particular for erecting light weight structures with an ecological function within
170 Appleton Street since 1969. I would like to add our support to Policy Order 2016#84 in favor
the parameters proposed under Z.0.5.55. Thank you in advance for your kind consideration. Best
restrictions in Z.0.5.23 to allow building a lightweight structure like a greenhouse on a percentage
on 4/2/16
• Andrew Hartness, Huron Ave.
I'd appreciate your taking note of my support. Best regards,
• Peter Wright, Larch Rd., designer and builder of Larch Rd Playground Condos
Cambridge Architects in support of ZO 5.55
• John Altobello, Reservoir St.: As a Cambridge architect and resident in the Huron Avenue
neighborhood, I'm writing to express my support for 205.55, which would enable flat root owners
to gain relief from height and FAR in order to build a lightweight structure, such as a greenhouse.
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
• Harry Irwin, Gurney St., member of Cambridge Historical Society - wrote directly to Donna Lopez
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
your consideration,
• James Prescott, 85 Trowbridge St.:
solar heating and other grass-roots ecological options.
supporting ZO 5.55
Other triple decker owner with problems
Dear Ms. Lopez, I am a home owner in mid-Cambridge (85 Trowbridge Street, Cambridge, MA
conversions. The exception options include the possibility of raising a lightweight structure which
would eliminate rainwater dumping into sewage lines by building a greenhouse, providing passive
ammend zoning ordinance 5.23 in order to allow sensible and rational exceptions to the maximum
that accumulate on the roof, resulting in water accumulation on the roof, and providing breeding for
height limitations, so as to allow owners of flat roof homes to make sensible and rational ecological
mosquitos. Enabling ecological (i.e. green) roof conversions would minimize heat absorption in the
debris from entering the sewer lines. The drain grate is prone to blocking from leaves and acorns
02138). The building, which was built around 1890, is a triple decker with a center-pitch flat roof that
third floor can be extreme. (The building does not have air conditioning, and so we rely on window
air conditioning units.) And, the drain on the center pitch roof has a grating to prevent leaves and roof
use of temporary air conditioning units. In addition, roof plantings will provide an efficient consumption
In our specific case, the rubber membrane roof is black, and in the summer months the heat on the
summer months, resulting in cooler temperatures in the building and, possibly, in the elimination of the
drains into the sewer system. I and am writing in support of Policy Order 2016#84, which is seeking to
of rain water and provide for a healthier and environmentally friendly living arrangement. Thank you for
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
2016
2011 and the Ordinance Committee in 2013
• A scan with over 50 signatures was emailed to Ms.
• A larger number yet had been filed with the original
Neighbors signatures of support
Lopez in anticipation of the Council meeting in March
variance application (2008) as well as with hearings in
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
existing Bft height differe
requested: 3ft more
ce
Note wide angle distortion
(building is set back 15ft)
existing 1ft height difference
increase specific to 387 Huron
reduce visibility
Simplified illustration of relative height
• Represents 11ft
• Setback from front
height increase i.e.
and sides will largely
greater than ZO 5.55
sewer from residential flat roofs (typical triple-deckers) - Nicolai Cauchy [email removed]
Supporting Amendment 5.55 to Cambridge Zoning Ordinance: option for eliminating rainwater dumping into
Lakeview Ave
Map-Lot:
3073
[phone removed]
Map-Lot:
234-166
234-18
(Map-Lot:
Map-Lot:
[phone removed]
Map-Lot:
234-167
accurate graphic rendition).
4141
(signed letter of support with
not opposed
X=supporters of initial request
Map-Lot:
234-105,
Map-Lot:
234-158
2 of 3)
Huron Ave
3047
reiterated their support after posting in yard
234-169
Map-Lot:
4000
Cambridge Zoning Ordinance:
antion for eliminatina rainwater
Supporting Amendment 5.55 to
-Map-Lot:
234-112
(234-66
Map-Lot:
4000
234:111
Map-Lot:
Map-Lot:
[phone removed]-67
Map-Lot:
Abutter support for 387 Huron
circumstances:
municipal sewer line
height limitations, may be authorized under the following
In an effort to enhance the City's commitment to mitigating
Language- background
water management, modifications to the applicable dimensional
requirements of this Article 5.000, in particular regarding FAR and
namely so-called "triple-deckers", while improving the City's storm-
Flat Roof Zoning Proposal's
household waste-water, discharging into a single outflow pipe to the
Residential buildings with a flat (concave) roof which may have poor
environmental impacts of certain older types of residential buildings,
on which a drain pipe collects water from the roof and combines it with
effects, or may suffer from the secondary effects of over-insulation, and
upper-level thermal insulation and/or contribute to important heat island
abutting properties
sewer system, and that
Provided that the resulting construction will
• significantly increase the thermal efficiency of the building
Language- requirements
per square foot of roof area, with the remainder dispersed at the
Flat Roof Zoning Proposal's
ground to follow its natural path without direct encumbrance onto
• entirely eliminate rain water entry from the concerned roof into the
• said rain water is harvested on the property at the rate of 1/8 gallon
building.
the building
building, and
and height limit may be permitted within the following limits
• Additional FAR not to exceed 20% of the existing FAR of the
side of the building, no less than 6 feet from front/street-side of
Language- new allowances
Flat Roof Zoning Proposal's
• Footprint to be no closer than 3 feet from either long edge or rear
the construction of a partial structure relieved from the applicable FAR
• Additional height not to exceed 10 ft. above the existing roof line of
the
architecture.
with natural plants,
insects at the roof level, and
• using rainwater at the roof level or floors below,
• harmonization of the new roof profile with the neighborhood
Language- considerations
• installation of solar panels (impractical on residential flat roofs)
Furthermore, in enhancing alternative energy sources (Article 22),
Flat Roof Zoning Proposal's
• planting flowering bushes and vegetation attractive to pollinating
additional positive consideration will be given to projects that improve
• use of passive solar heating, convective cooling, seasonal shading
ATTACHMENTC
Proposal for converting flat concave roofs to a kind of greenhouse/glass porch
Z.O. 5.55
In an effort to enhance the City's commitment to mitigating environmental impacts of certain older
Formatted: Strikethrough
types of flat roofed residential buildings, namely so called "triple deckers", while improving the City's
Formatted: Strikethrough
storm-water management, modifications to the applicable dimensional requirements of this Article
5.000, in particular regarding FAR and height limitations, may be authorized via special permit by the
Planning Board under the following circumstances:
Residential buildings with a flat (concave) roof which may have poor upper level thermal insulation
Formatted: Strikethrough
and/or contribute to important heat island effects, or may suffer from the secondary effects of
everinsulation, and on which a drain pipe collects water from the roof and combines it with household
waste-water, discharging into a single outflow pipe to the municipal sewer line
Provided that the resulting construction will:
• significantly increases the thermal efficiency of the building or maintains the thermal efficiency
of an existing insulated roof
• entirely eliminate rain water entry from the concerned roof into the sewer system, and that
•
results in said rain water being stored on site or is harvested on the property at the rate of 1/8
Formatted: Strikethrough
gallon per square foot of roof area, with the remainder dispersed at the ground te following its
natural path without direct encumbrance onto abutting properties,
the construction of a partial structure relieved from the applicable FAR and height limit may be
permitted within the following limits: with the following requirements:
Formatted: Strikethrough
• Additional height not to exceed 10 ft. above the existing roof line of the building
• Footprint to be no closer than 3 feet from either long edge or rear side of the building, no less
than 6 feet from front/street-side of building, and
• Additional FAR not to exceed 20% of the existing FAR of the building.
• Approval by condominium or homeowners' association as appropriate.-
Furthermore, in enhancing alternative energy sources (Article 22), additional positive consideration will
be given to projects that improve the:
• Possibility of installation of solar panels (impractical on residential flat roofs)
Formatted: Strikethrough
• use of passive solar heating, convective cooling, seasonal shading with natural plants,
• using rainwater at the roof level or floors below,