Search ▸ Communication to the City Council
a report from Councillor Dennis J. Carlone Co-Chair and Councillor Craig A. Kelley, Co-Chair of the Ordinance Committee, for a public hearing held on July 11, 2019 to discuss the refiled petition from Alexandria Real Estate Equities, Inc. to amend the Zoning Ordinance in Article 20 to add at the end thereof the creation of a Grand Junction Pathway Overlay District
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative.
ATTACHMENTA
3.1.a
ALEXANDRIA.
May 15, 2019
Donna Lopez
City Clerk
City of Cambridge
67:01HM
795 Massachusetts
[phone removed]
Avenue
Cambridge, MA 02139
Re: Refiled Zoning Petition-Grand Junction Pathway Overlay
Petition Grand Junction Pathway Overlay
District
ng
Dear Ms. Lopez:
As our November 29, 2018 petition has expired, please find enclosed for filing, on behalf of
Alexandria Real Estate Equities, Inc., and the owners of affected land, an updated zoning
petition proposing the Grand Junction Pathway Overlay District.
Our November 29, 2018 petition has been revised to reflect input from interested parties. Key
changes include lowering of proposed building height, the addition of a transition zone for
building height and a decrease in project density.
2019 #38 : Refiled Zonin
We look forward to continuing the review process and are eager to revitalize the affected land
and advance the Grand Junction Pathway
Thank you for your consideration.
:
Very truly yours,
pop Munice
Senior Vice President-Real Estate Development & Asset Services
Alexandria Real Estate Equities, Inc.
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019
Alexandria Real Estate Equities, Inc.
400 Technology Square, Suite 101 | Cambridge, MA 02139
[phone removed] | www.are.com
Packet Pg. 125
3.1.a
Grand Junction Pathway Overlay District Zoning Amendment
The undersigned owners of land to be affected by this Petition, hereby petition the Cambridge
City Council as follows:
1.
To see if the City Council will vote to amend the Zoning Map of the City of Cambridge
as tollows:
Parcel 1. A certain parcel of land situated in the City of Cambridge, County of Middlesex and
the Commonwealth of Massachusetts more particularly described as tollows: Beginning at a
Grand Junction Pathway Overlay
point at the intersection of the westerly sideline of Fulkerson Street and the northeasterly sideline
of Binney Street; thence running N 56°29'27" W, by said Binney Street, a distance of 226.55 feet
to a point; thence turning and running N 57°11'37" W, by said Binney Street, a distance of 51.81
feet to a point; thence turning and running N 10°45'15" E, by land now or formerly of
Massachusetts Department of Transportation, a distance of 1014.59 feet to a point; thence
turning and running S 80°27'41" E, by land now or formerly of Spring Condominium, a distance
of 83.70 feet to a point; thence turning and running S 09°32'21" W, by land now or formerly Pay
Phone Realty Trust, and land now or formerly of NSTAR Electric Company, a distance of
278.56 feet to a point; thence turning and running S 06°22'09" E, by land now or formerly of
NSTAR Electric Company, a distance of 127.16 feet to a point; thence turning and running N
12°47'39" W, by land now or formerly of NSTAR Electric Company, a distance of 76.39 feet to
a point of non-tangency; thence running by a curve to the left, having a radius of 301.06 feet, a
chord bearing of S 28°33'33"E, a chord distance of 138.60 feet, a delta angle of 19°01'53", and
an are length of 139.85 feet, by land now or formerly of NSTAR Electric Company to a point on
said Fulkerson Street; thence running S 09°32'20" W, by said Fulkerson Street, a distance of
546.29 feet to the point of beginning; said parcel of land containing an area of 191,506 square
feet or 4.39 acres; and
Parcel 2. A certain parcel of land situated in the City of Cambridge, County of Middlesex and
the Commonwealth of Massachusetts more particularly described as follows: commencing at a
point at the intersection of the westerly sideline of Fulkerson Street and the northeasterly sideline
of Binney Street; thence running N 56°29'27" W, by said Binney Street, a distance of 226.55 feet
to a point; thence turning and running N 57°11'37" W, by said Binney Street, a distance of 90.66
feet to the point of beginning; thence running N 57°11'37" W, by said Binney Street, a distance
of 15.11 feet to a point; thence turning and running N 10°45'15" E, by land now or formerly of
ARE-MA Region No. 58, LLC, a distance of 508.00 feet to a point; thence turning and running S
67°21'26" E, by Parcel 3 herein described, a distance of 14.31 feet to a point; thence turning and
running S 10°45'15" W, by land now or formerly of Massachusetts Department of
Transportation, a distance of 510.72 feet to the point of beginning; said parcel of land containing
an area of 7,131 square feet; and
Parcel 3. A certain parcel of land situated in the City of Cambridge, County of Middlesex and
the Commonwealth of Massachusetts more particularly described as follows: beginning at a
Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition
point on the westerly line of land now or formerly of Massachusetts Department of
Transportation said point being S 10°45'15" W, a distance of 510.72 feet from the northeasterly
sideline of Binney Street; thence running N 67°21'26" W, by Parcel 2 herein described and land
now or formerly of ARE-MA Region No. 58, LLC, a distance of 17.69 feet to a point; thence
Attachment:
Packet Pg. 126
3.1.a
turning and running N 10°46'42" E, by land now or formerly of Richard D. Fanning, Wellington
Harrington Memorial Way, and land now or formerly of John Frazier, Trustee, a distance of
743.27 feet to a point; thence turning and running S 80°25'39" E, by land now or formerly of
Roman Catholic Archbishop of Boston, and Parcel 4 herein described, a distance of 17.00 feet to
a point; thence turning and running S 10°45'15" W, by land now or formerly of Massachusetts
Department of Transportation, a distance of 747.26 feet to the point of beginning; said parcel of
land containing an area of 12,785 square feet; and
Parcel 4. A certain parcel of land situated in the City of Cambridge, County of Middlesex and
the Commonwealth of Massachusetts more particularly described as follows: beginning at a
point on the southerly sideline of Cambridge Street, S 80°29'15" E a distance of 130.97 feet from
the easterly sideline of Cardinal Medeiros Avenue; thence running S 80°29'15" E, by said
Cambridge Street, a distance of 6.19 feet to a point; thence turning and running S 11°03'38" W,
by land now or formerly of Massachusetts Department of Transportation, a distance of 264.00
feet to a point; thence running along a curve to the right, by land now or formerly of
Massachusetts Department of Transportation, having a radius of 784.50 feet, a chord bearing of
S 13°46'27" W, a chord distance of 74.29 feet, a delta angle of 05°25'41", and an arc length of
74.32 feet, to a point; thence with a reverse curve to the left, by land now or formerly of
Massachusetts Department of Transportation, having a radius of 1315.50 feet, a chord bearing of
S 13°37'16" W, a chord distance of 131.60 feet, a delta angle of 05°44'02", and an arc length of
131.65 feet, to a point; thence running S 10°45'15" W, by land now or formerly of Massachusetts
Department of Transportation, a distance of 59.81 feet to a point; thence turning and running N
80°25'39" W, by Parcel 3 herein described, a distance of 14.00 feet to a point; thence turning and
running N 10°45'15" E, by land now or formerly of Roman Catholic Archbishop of Boston, a
distance of 60.10 feet to a point; thence running along a curve to the right, by land now oi
formerly of Roman Catholic Archbishop of Boston, having a radius of 1329.50 feet, a chord
bearing ofN 13°37'16" E, a chord distance of 133.00 feet, a delta angle of 05°44'02", and an arc
length of 133.05 feet, to a point; thence with a reverse curve to the lett, by land now or formerly
of Roman Catholic Archbishop of Boston, having a radius of 770.50 feet, a chord bearing of N
13°46'27" E, a chord distance of 72.97 feet, a delta angle of 05°25'41", and an arc length of 72.99
feet, to a point; thence running N 11°03'38" E, by land now or formerly of Roman Catholic
Archbishop of Boston, a distance of 213.61 feet to a point; thence turning and running S
80°29'15" E, by Parcel 5 herein described, a distance of 8.06 feet to a point; thence turning and
running N 10°46'42" E, by Parcel 5 herein described, a distance of 50.01 feet to the point of
beginning; said parcel of land containing an area of 7,020 square feet; and
Parcel 5. A certain parcel of land situated in the City of Cambridge, County of Middlesex and
the Commonwealth of Massachusetts more particularly described as follows: beginning at a
point on the southerly sideline of Cambridge Street, S 80°29'15" E a distance of 78.39 feet from
the easterly sideline of Cardinal Medeiros Avenue; thence turning and running S 80°29'15" E, by
said Cambridge Street, a distance of 52.58 feet to a point; thence turning and running S
10°46'42" W, by Parcel 4 herein described, a distance of 50.01 feet to a point; thence turning and
running N 80°29'15" W, by Parcel 4 herein described and by land now or formerly of Roman
Catholic Archbishop of Boston, a distance of 51.41 feet to a point; thence turning and running N
09°26'25" E, by land now or formerly of Roman Catholic Archbishop of Boston, a distance of
50.00 feet to the point of beginning; said parcel of land containing an area of 2,600 square feet;
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
- 2 -
Packet Pg. 127
3.1.a
be rezoned to create a new overlay zoning district entitled the Grand Junction Pathway Overlay
District.
To see if the City Council will vote to amend Article 20 of the Zoning Ordinance of the
City of Cambridge by adding the following text at the end of Article 20 as presently ordained:
20,1000
Grand Junction Pathway Overlay District
20.1001
Establishment and Scope.
Grand Junction Pathway Overlay
There is hereby established the Grand Junction Pathway Overlay District, which is governed by
the regulations and procedures specified in this Section 20.1000. It is the intent of this Section
that these regulations will apply to land within the Grand Junction Pathway Overlay District,
which is comprised of Grand Junction Land and Development Land, as defined below.
Purpose.
20.1002
It is the purpose of the Grand Junction Pathway Overlay District to augment base zoning and
promote the development of a public pathway along the Grand Junction railroad right-of-way in
connection with high quality development consistent with development along the Binney Street
corridor.
The October 2001 East Cambridge Planning Study identified the Grand Junction corridor as a
means to provide a significant transportation and recreational resource and enhance non-auto: *
mobility in the City. The October 2006 Grand Junction Rail-with-Trail Feasibility Study.
highlighted the public benefits of the pathway, including recreation and open space, but noted
that acquiring rights in the land to develop the pathway was a key limiting issue. The August
2017 Final Report of the Kendall Square Mobility Task Force underscored the importance of
enhancing non-auto mobility in the City and the Grand Junction Pathway in meeting that goal.
The Grand Junction Pathway Overlay District will facilitate the City's efforts to secure long term
public access to certain land in the Grand Junction Pathway Overlay District by incenting
development consistent with development along the Binney Street corridor. A project meeting
the requirements of this Section will provide open space, recreational opportunities, a corridor
way Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition
Tor non-auto traific in the City, as well as high quality development, and promote the goals of
ath
public health, safety, welfare and economic development.
20.1003
Applicability.
Juntion
Development in the Grand Junction Pathway Overlay District shall be controlled by the
Seculan 20, 100, which handusy in lie othereceptaons of tie yusty A-l Disristo her c
the regulations applicable to the Industry A-1 District differ from the requirements of this
Section 20.1000, the provisions of this Section shall apply. The Grand Junction Pathway
Overlay District shall be established on the Zoning Map of the City of Cambridge pursuant to the
provisions of Section 3.20.
ment: Refiling
- 3 -
Packet Pg. 128
20.1004
Procedure.
Construction, use and development under this Section shall be authorized by Special Permit
granted by the Planning Board. In granting a Special Permit under this Section 20.1000, the
Planning Board shall find that the intent of this Section has been satisfied and find that provision
has been made for the conveyance to the City, or a designee thereof, by fee or easement, of
interests in certain land as described herein for the development of the Grand Junction pathway
Junction Pathway Overlay
between Binney Street and Cambridge Street.
20.1005
Required Conveyance of Grand Junction Land.
Grand
In connection with a Special Permits) granted pursuant to Section 20.1000, conveyance to the
City, or its designee, of the following land for use on the Grand Junction pathway, by fee or
easement, shall be required under such Special Permits) or have already been made:
(a) Tax Parcel 37-88, comprising approximately 2,600 square feet, and known as 686
Cambridge Street;
(b) A fourteen (14) foot wide strip of land along the east boundary of Tax Parcel 37-126,
beginning at the north boundary of Tax Parcel 33-111 and continuing approximately 480 feet,
and then the land between the east boundary of Tax Parcel 37-126 and the west boundary of Tax
Parcel 37-88, continuing approximately fifty (50) feet to Cambridge Street, comprising a total of
approximately 7,020 square feet; and
(c) A fourteen (14) foot wide strip of land along the east boundary of Tax Parcel 33-110
(APP 2019 #38 : Refiled Zoning Petition
bordering the Grand Junction railroad right-of-way beginning at Binney Street and continuing
approximately 511 feet to the south boundary of Tax Parcel 33-111 and Tax Parcel 33-111,
comprising a total of 19,916 square feet.
The land described in subparagraphs (a)-(c) is hereby defined as "Grand Junction Land."
Other Matters--Grand Junction Land.
20.1006
The Grand Junction Land shall be conveyed to the City, or its designee, by fee or easement: (i)
such that the environmental condition of the Grand Junction Land poses No Significant Risk, as
defined under 310 C.M.R. 40.0006, to future users of the land given its intended use as a public
pathway; (il) subject to encumbrances which do not interfere with the use of the land for its
intended purpose; and (il) subject to a reservation of Grantor to grant subsurface utility
easements. Nonconformity, including setbacks, arising directly from the conveyance of Grand
Junction Land hereunder is waived.
Grand Juntion Pathway Overlay_5.20.2019
Development Land.
20.1007
"Development Land" within the Grand Junction Pathway Overlay District consists of Tax Parcel
Refiling
31-20 [known as 303 and 345 Binney Street], comprising a total of approximately 191,506
square feet ("Development Land Lot Area").
chment:
Atta
- 4 -
Packet Pg. 129
3.1.a
Permitted Uses.
20.1008
Uses permitted in the Development Land shall be governed by base zoning. After conveyance
pursuant to Section 20.1011, Grand Junction Land shall be used for Public Open Space.
Dimensional Requirements.
20.1009
20.1009.1
Floor Area Ratio. The maximum Floor Area Ratio for the Development
Land located in the underlying Industry A-1 District (130,671 square teet) shall be 2.5.
Development Land in the underlying Residence C-1 District (60,835 square feet) may be
included in the calculation of allowable Gross Floor Area on Development Land located in the
Industry A-1 District (for Uses allowed therein) at the Floor Area Ratio allowed in the Industry
A-I District of 1.25, provided that: (i) future use of the Development Land in the Residence C-1
District shall be Publicly Beneficial Open Space, except that fences, berms, sound barriers, a
vehicle turnaround, a loading dock enclosure and underground systems serving the Development
Land may be located in the underlying Residence C-1 District; and (Il) a 25 foot wide landscaped
buffer shall be created along the westerly boundary of that portion of the Development Land
located in the Residence C-1 District abutting the railroad right-of-way.
20.1009.2
Height. As shown on the attached Figure of Height Zones for
Development Land within the Grand Junction Pathway Overlay District, the Development Land
is divided into three zones: the Binney Street Zone, the Transition Zone and the Base Zoning
Zone. The maximum height of any building in the Binney Street Zone shall be 105 feet. The
maximum height of any building in the Transition Zone shall be 60 feet. The maximum height "
of any building in the Base Zoning Zone shall be governed by base zoning
20.1009.3
Setbacks. There shall be no minimum required front, rear or side yard
setbacks, except that no above grade building shall be constructed within twenty-five (25) feet of
the westerly boundary of Tax Parcel 31-20.
20.1010
Parking--Parking Ratio.
Parking shall be at a ratio no greater than 0.8 spaces per 1,000 feet of Gross Floor Area for
technical office for research development laboratory or research facility (see Section 4.34(f) of
the Ordinance).
20.1011
Timing of Grand Junction Land Conveyance.
The Grand Junction Land shall be conveyed to the City per Section 20.1005 no later than the
issuance of the Certificate of Occupancy for the first building constructed on the Development
Land pursuant to a Special Permit granted pursuant to this Section 20.1000.
20.1012
Project Review.
In granting approval for a building or buildings under Article 19, the Planning Board may
approve buildings for which physical design information is presented in conceptual form, subject
to later design review and approval by the Planning Board and a finding that final design of such
building(s) is consistent with Section 19.30, as applicable.
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
- 5 -
Packet Pg. 130
3.1.a
Respectfully submitted,
303/345 Binney Street
Map 31, Lot 20
By its Owner,
ARE-MA REGION NO. 61, LLC,
a Delaware limited liability company
:
By:
Alexandria Real Estate Equities, L.P.,
a Delaware limited partnership,
managing member
By:
ARE-QRS. Corp.,
a Maryland corporation,
general partner
By:
Name:
Jackie Clem
Senior Vice President
Title:
RE Legal Affairs
353 and 353R Binney Street
Map 33, Lots 110 and 111
By its Owner,
ARE-MA Region No. 58, LLC,
a Delaware limited liability company
By:
Alexandria Real Estate Equities, L.P.,
a Delaware limited partnership,
managing member
By:
ARE-QRS. Corp.,
a Maryland corporation,
general partner
By:_
Name:
Jackie Clem
Title:
Seplor Vicer dont
RE Legal Affails
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
Packet Pg. 131
686 Cambridge Street
Map 37-Lot 88
By its Owner,
RUNNING BROOK ASSOCIATES, LLC,
a Delaware limited liability company
By:
Alexandria Real Estate Equities, L.P.,
a Delaware limited partnership,
managing member
By:
ARE-QRS. Corp.,
a Maryland corporation,
general partner
By:_
Name:
Title:
Senior Vice President
RE Legal Affairs
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
Packet Pg. 132
# Feet
750 1,000
BA
50D
PUD-4
Overlay Distric
250
T6UD-49
PROPOSED GRAND JUNCTION PATHWAY
A PURSE
os
tA-1
OS
abbi
BB
Attachment: Refiling Grand Juntion Pathway Overlay _5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
ALEXANDRIA
OS
Packet Pg. 133
. 1.a
MICHA
MEMORIAL WAY
ZONING DISTRICT
EXISITING SITE
BOUNDARY
BOUNDARY
BASE ZONING
CHARLES STREET
Grand Junction Pathway Overlay Distric
,C-1
HEIGHT ZONES - DEVELOPMENT LAND
FULKERSON STREE
BENT STREET
ZONE
TRANSITION
250*
nbbi
ZONE
BINNEY
STREET
240'
Attachment: Refiling Grand Juntion Pathway Overlay_5.20.2019 (APP 2019 #38 : Refiled Zoning Petition Grand Junction Pathway Overlay
ALEXANDRIA
Packet Pg. 134
ALEXANDRIA | nbbj
nbbj
July 11, 2019
PETITION
ATTACHMENT B
REFILED GRAND JUNCTION OVERLAY
ALEXANDRIA
feet to 90 feet *
from FAR calculations
from 120 feet to 60 feet
nbbj
• Eliminate Transfer of Development Rights
Proposed amendment from Refiled Petition
Changes trom Original Grand Junction Overlay Petition
• Exclude commercial building from residential district
REFILED GRAND JUNCTION OVERLAY PETITION
• Limit increased height to areas within the industrial district
• Exclude lot area of Grand Junction Pathway, including Cambridge Street lot,
• Limit rooftop mechanical penthouse height in the Binney Street Zone to 25' *
• Reduce maximum height along proposed "Binney Street Zone" down from 120
• Reduce maximum height along Fulkerson Street in new "Transition Zone" down
90฿
BINNEY STREET
ALEXANDRIA
245
ROGERS STREET
IA-1
ZONE
BINNEY
STREET
nbbj
60'
255'
ZONE
BENT STREET
TRANSITION
45'
82'
:C-1
FULKERSON STREET
CHARLES STREET
BOUNDARY
BOUNDARY
BASE ZONING
EXISITING SITE
ZONING DISTRICT
MEMORIAL WAY
HEIGHT ZONES - DEVELOPMENT LAND
Grand Junction Pathway Overlay District
BB
DALEXANDRIA nbbj
-B)
IA-1
CO-2
/ IA-1
POP
PUD K
34
BUD-4G
250
500
NP
PUD-4
/PUD-5
1,000
1 Feet
PROPOSED GRAND JUNCTION PATHWAY
Overlay District
BINNEY STREET
IA-1
ROGERS STREE
ALEXANDRIA nbbj
130,697 SF
BENT STREET
FULKERSON STREET
CHARLES STREET
EXISTING SITE BOUNDARY
191,536 SF
TOTAL SITE AREA
60,839 SF
MEMORIAL WAY
C-1
Existing Site Boundary
SITE
ALEXANDRIA. mbbj
DESIGN PROCESS
Building Massing Studies
DALEXANDRIA nbbj
EXISTING SITE CONDITIONS
The Corner of Binney Street and Fulkerson Street
ALEXANDRIA.
nbbi
Multi-Use Path
Grand Junction Greenway
(Existing Path)
Tech. Square
BROADWAY
(Planned Path,
construction underway)
BINNEY ST
City of Cambridge
ALEXANDRIA
225 Binney
ROGERS ST
One Kendall Square
6TH ST
325 Binney
BENT ST
nbbj
399 Binney
OKS Garage
ARE Controlled
CHARLES ST
Cinema
(Proposed Connection, ~1,800 If)
SPRING ST
FULKERSON ST
THORNDIKE ST
OTIS ST
CAMBRIDGE ST
Existing, Planned, & Proposed Segments | Key Local Connections
GRAND JUNCTION GREENWAY
0 500
2,000
Feet
& GJ Path extensions
Planned Community Path
of Community Path & GJ Path
Proposed GJ Path connection
Publicly accessible open space
Extent of Grand Junction Rail Corridor
Existing & Under Construction Portions
ALEXANDRIA
Bike Path Connection
Yards, and Paul Dudley White
Proposed West Station, Beacon * 4.
nbbj
Community Path
(Minuteman Bikeway connection)
(MIT Commitment)
Proposed
Connection
Commitment)
(City of Cambridge
Construction)
(Existing/Under
- White Bike Path
Station and Paul Dudley
Future connection to North
GRAND JUNCTION GREENWAY
Planned & Existing Sections & Connections
ALEXANDRIA
Cambridge St
nbbj
Broadway
Binney St
325 Binney
Key Corridors
Portions of Path
Proposed Grand
Under Construction
Permitted/Proposed
Existing/Proposed City
Junction Path Addition
Wellington-Harrington
Key Routes & Connections
GRAND JUNCTION GREENWAY
ALEXANDRIA.
nbbj
GRAND JUNCTION GREENWAY
Existing Condition 686 Cambridge Street
•ALEXANDRIA. | nobJ
nbbj
GRAND JUNCTION GREENWAY
Proposed Cambridge Street Gateway
PARCEL LINES
PROPOSED PEDESTRIAN /BIKE PATH
ALEXANDRIA
PROPOSED LAND OWNERSHIP CHANGE
nbbj
820 20
AuR 1 1
U 2 Д0D
Z›
50
cambi
lage St
Distance in ft
150
GRAND JUNCTION GREENWAY
Enabling Land Acquisition
ALEXANDRIA.
nboj
GRAND JUNCTION RAILROAD
Existing Condition
15
GREENWAY
THE LAND TO
ACCOMMODATE
MULTI-USE PATH
GRAND JUNCTION
CONTRIBUTION OF
Grand Junction
Overlay District
ALEXANDRIA.
Community Benefits
APPROXIMATELY
UNION CONSTRUCTION JOBS
375
nbbj
LOCALLY
PERMANENT
JOBS ADDED
20 YEARS
NEW REAL ESTATE
TAX REVENUE OVER
1,000+ $88M+
~$6.6M
CONTRIBUTION OF
BASED ON 440,000 SF
INCENTIVE ZONING FEE
ENHANCED
CYCLING &
EXPERIENCE
PEDESTRIAN
BINNEY STREET
201
2019
ECPT
JANUARY
Block Party
Planning Board
SEPTEMBER
Ordinance Committee
Wellington Harrington
ALEXANDRIA.
Cambridge
Committee
Pedestrian
Cambridge
ECBA
FEBRUARY
Cambridge Bike
Safety Committee
Transit Committee
Linden Park/
Linden Park/
OCTOBER
Wellington Harrington
Wellington Harrington
nbbj
MARCH
City Council &
Group Meeting
City Community
Review Meeting
Neighbor Working
Development Staff
ECPT
NOVEMBER
Filed Zoning Petition
APRIL
City Council &
Group Meeting
Grand Junction
Group Meeting
Neighbor Working
Path Design Working
CRA
Linden Park/
DECEMBER
Wellington Harrington
ECPT
MAY
325 Binney Street Public Process
City Council &
Group Meeting
Neighbor Working
JUNE
Meeting
Group Meeting
Planning Board
(2) City Council &
Neighbor Working
ECBA
JULY
Meeting
Neighborhood
Working Group
Strategies
• PV array
• Water use reduction
325 BINNEY STREET
Sustainability Goals / Highlights
• Ultra-Low Fossil Fuel Consumption
• Ground source heating and cooling
• High performance building envelope
• LEEDV4 Gold Core & Shell Certification
• Flexible and efficient mechanical system
DALEXANDRIA. nbbj
Target to be most sustainable commercial lab building
LOC
400
500
600
40 Landsdowne (MIT)
13 Vassar (MIT)
EUl (kBtu/sf-yr)
320 Bent (BMR)
200 Tech So CARE
200 Cambridgepark
ULTRA-LOW FOSSIL FUEL GOAL
500 Main (MIT)
GEOTHERMAL
ULTRA-LOW FOSSIL FUEL SRATEGIES
SU ECSOA
75 Amnes BR
200 Tech Sq lA
We Novarin
2016 Energy Intensity
555 Tech sq
- 54
7107
* 11:7
=1.1
Cambridge Lab Buildings >150,000 Sf
415 Main (BP
REDUCE HEATING DEMAND
45 Sidney till
PERFORMANCE
HEA I RECOVERT
675 West Kenda
ZONES
COOLING AT
/Uu Main Call
SUPPLEMENTAL
KEY
b40 Mem Urtan
Gas EUl
Electric EUl
Targeting
Ultra-Low
Fossil Fuel
325 BINNEY STREET SUSTAINABILITY
NORTHEAST VIEW
ALEXANDRIA.
BINNEY
STREET
20•
nbbj
BENT STREET
.02T
CHARLES STREET
CORNEL
10/29/18
INITIAL PROPOSAL
901
BINNEY STREET
ALEXANDRIA
245'
ROGERS STREE
IA-1
ZONE
BINNEY
STREET-
nbbj
60°-
255'
• ZONE
TRANSITION
45°
821
FULKERSON STREET
CHARLES STREET
BOUNDARY
BOUNDARY
BASE ZONING
EXISITING SITE
ZONING DISTRICT
MEMORIAL WAY
HEIGHT ZONES - DEVELOPMENT LAND
Grand Junction Pathway Overlay District
ALEXANDRIA.
Neighborhood Proposal at
nbbj
Amended Zoning Petition at
June 18th Planning Board Presentation
July 11th Ordinance Committee Meeting
90' Building
75' Building
115' Overall Height
115' Overall Height
40' Mechanical Penthouse
25 Mechanical Penthouse
OVERALL HEIGHT COMPARISION
106
120
FOOTPRINT
CURRENT BUILDING
ALEXANDRIA.
nbbj
00"
10/29/2018
PRESENTED ON
BUILDING FOOTPRINT
street facade.
MASSING
to neighborhood.
REDUCTION
Binney Street Zone
• Mechanical Penthouse
120' to 60' on the north
height limit of 25' in
• Height reduction from
120' to 90' on Binney
side of building adjacent
• Height reduction from
MASSING OVERLAY DIAGRAM
10/29/2018 Footprint and Current Footprint
60°
80' top of
120*
penthouse)
penthouse)
(160' top of
FOOTPRINT
CURRENT BUILDING
DALEXANDRIA. mbbj
10/29/2018
PRESENTED ON
90'
penthouse)
BUILDING FOOTPRINT
penthouse/
115' top of
(160' top of
street facade.
MASSING
to neighborhood.
REDUCTION
Binney Street Zone
• Height reduction from
• Mechanical Penthouse
• Height reduction from
height limit of 25' in
120' to 90' on Binney
120' to 60' on the north
side of building adjacent
MASSING OVERLAY DIAGRAM
10/29/2018 Footprint and Current Footprint
ALEXANDRIA.
300 Binney St.
301 Binney St.
66 ft - To Parapet
96 ft - To Parapet
88 ft - To Penthouse
111 ft - To Penthouse
Bidg 1000
nbbj
125 ft - To Parapet
147 ft- To Penthouse
320 Bent St.
Amgen One Kendall Sq
64 ft - To Parapet
83 ft - To Penthouse
325 Binney St.
115 ft - To Penthouse
90 ft - Top of Occ Floor
117 Sixth St.
30 ft - To Parapet
58 ft - To Penthouse
Garage
80 ft - To Penthouse
One Kendall Sa
60 ft- Top of Occ Floor
66 ft - To Top of Wall
325 Binney
Permitted/Proposed
Under Construction
Existing & Proposed Development Height Comparisons
GRAND JUNCTION GREENWAY
IA-1
BINNEY STREET
ALEXANDRIA.
6 FLOORS
ROGERS STREET
160'
nbbj
105'
.4
4 FLOORS
BENT STREET
1 FLR
-4021
82'
82'
287
CHARLES STREET
FULKERSON STREEL ...
EXİSITING SITE BOUNDARY
Existing Site Boundary
BUILDING FOOTPRINT - 90'60'
nbbj
DALEXANDRIA nbbj
SUN STUDIES
DALEXANDRIA nbbj
90'- 60'
MICHAEL
CORNELIUS WAY
WAY
FULKERSON STREET
BENT STREET
ROGERS STREET
BINNEY STREET
SUN STUDIES - WINTER SOLSTICE 9:00 AM
ALEXANDRIA
nbbj
90' - 60'
CORNELIUS WAY
FULKERSON STREET
BENT STREET
CHARLES STREET
BINNEY STREET
SUN STUDIES - WINTER SOLSTICE 10:00 AM
ALEXANDRIA
nbbj
90' - 60'
RNELIUS WA
FULKERSON STREET
BENT STREET
CHARLES STREET
BINNeY STREET
SUN STUDIES - WINTER SOLSTICE 11:00 AM
ALEXANDRIA
nbbj
90' - 60'
LIUS WA
FULKERSON STREET
BENT STREET
BINNEY STREET
SUN STUDIES - WINTER SOLSTICE 12:00 PM
DALEXANDRIA nbbj
90' - 60'
CORNELIUS WAY
FULKERSON STREET
BENT STREET
ROGERS STREI
CHARLES STREET
BINNEY STREET
SUN STUDIES - WINTER SOLSTICE 1:00 PM
ALEXANDRIA
nbbj
90' - 60'
MICHAEL
CORNELIUS WAY
FULKERSON STREET
BENT STREET
CHARLES STREET
BINNEY STREET
SUN STUDIES - WINTER SOLSTICE 2:00 PM
33
ALEXANDRIA.
nbbj
ATACHMENTC
ALEXANDRIA.
July 11,2019
Donna Lopez
City Clerk
City of Cambridge
795 Massachusetts Avenue
Cambridge, MA 02139
Re: Amendment to Zoning Petition for the Grand Junction Pathway
Overlay District
Dear Ms. Lopez:
On behalf of Alexandria Real Estate Equities, Inc., and the owners of affected land, please find
enclosed a proposed amendment to the May 16, 2019 zoning petition for the Grand Junction
Pathway Overlay District. I also have enclosed a blackline incorporating the amendment and
showing proposed changes from the May 16, 2019 Petition.
The amendment reduces the maximum building height from 105 feet to 90 feet and limits the
height of mechanical penthouses based on input we have received from the working group.
We plan to formally propose the amendment at the July 11, 2019 Ordinance Committee hearing
on the Petition.
Thank you for your consideration.
4/Mas
Senior Vice President--Real Estate Development & Asset Services
Alexandria Real Estate Equities, Inc.
Alexandria Real Estate Equities, Inc.
Suite
I Cambridge, MA 02139
400 Technology Square,
[phone removed]
www.are.com
Ordinance Committee
Cambridge City Council
Cambridge, Massachusetts
Proposed Amendment to the May 16, 2019 Petition of Alexandria Real Estate Equities, Inc. et al
creating the Grand Junction Overlay District ("Petition"') by amendment to the Zoning Map of
the City of Cambridge and the Zoning Ordinance of the City of Cambridge.
1.
Delete the number "105" in Section 20.1009.2 on page 5 of the Petition and insert
the number "90." [Note: This change reduces the maximum building height in the Grand
Junction Overlay District from 105 feet to 90 feet.]
2.
Insert the following at the end of Section 20.1009.2 on Page 5 of the Petition:
"Notwithstanding Section 5.23 of the Cambridge Zoning Ordinance, the height of any Roof Top
Mechanical Penthouse in the Binney Street Zone of the Grand Junction Pathway Overlay District
shall be limited to twenty-five (25) feet and the height of any Roof Top Mechanical Penthouse in
the Transition Zone of the Grand Junction Pathway Overlay District shall be limited to twenty.:
(20) feet. "Roof Top Mechanical Penthouse" is defined as an enclosed space housing
mechanical systems, air conditioning equipment, elevator bulkheads, ventilation systems or other
necessary features normally built above the roof and not used for human occupancy."
Dated: July 11, 2019
ActiveUS 174281475v.1
Permitted Uses.
20.1008
Uses permitted in the Development Land shall be governed by base zoning. After conveyance
pursuant to Section 20.1011, Grand Junction Land shall be used for Public Open Space.
Dimensional Requirements.
20.1009
Floor Area Ratio. The maximum Floor Area Ratio for the Development
20.1009.1
Land located in the underlying Industry A-1 District (130,671 square feet) shall be 2.5.
Development Land in the underlying Residence C-1 District (60,835 square feet) may be
included in the calculation of allowable Gross Floor Area on Development Land located in the
Industry A-1 District (for Uses allowed therein) at the Floor Area Ratio allowed in the Industry
A-l District of 1.25, provided that: (i) future use of the Development Land in the Residence C-1
District shall be Publicly Beneficial Open Space, except that fences, berms, sound barriers, a
vehicle turnaround, a loading dock enclosure and underground systems serving the Development
Land may be located in the underlying Residence C-1 District; and (ii) a 25 foot wide landscaped
buffer shall be created along the westerly boundary of that portion of the Development Land
located in the Residence C-1 District abutting the railroad right-of-way.
20.1009.2
Height. As shown on the attached Figure of Height Zones for
Development Land within the Grand Junction Pathway Overlay District, the Development Land
is divided into three zones: the Binney Street Zone, the Transition Zone and the Base Zoning
Zone. The maximum height of any building in the Binney Street Zone shall be t0590 feet. The
maximum height of any building in the Transition Zone shall be 60 feet. The maximum height
of any building in the Base Zoning Zone shall be governed by base zoning. Notwithstanding
Section 5.23 of the Cambridge Zoning Ordinance, the height of any Roof Top Mechanical
Penthouse in the Binney Street Zone of the Grand Junction Pathway Overlay District shall be
limited to twenty-five (25) feet and the height of any Roof Top Mechanical Penthouse in the
Transition Zone of the Grand Junction Pathway Overlay District shall be limited to twenty (20)
feet. "Roof Top Mechanical Penthouse" is defined as an enclosed space housing mechanical
systems, air conditioning equipment, elevator bulkheads, ventilation systems or other necessary
features normally built above the roof and not used for human occupancy.
Setbacks. There shall be no minimum required front, rear or side yard
20.1009.3
setbacks, except that no above grade building shall be constructed within twenty-five (25) feet of
the westerly boundary of Tax Parcel 31-20.
20.1010
Parking-Parking Ratio.
Parking shall be at a ratio no greater than 0.8 spaces per 1,000 feet of Gross Floor Area for
technical office for research development laboratory or research facility (see Section 4.34 (f) of
the Ordinance).
Timing of Grand Junction Land Conveyance.
20.1011
- 6-
=
ATTACHMENTD
Alexandria Real Estate Equities, Inc.
400 Technology Square, Suite 101
Cambridge, MA 02139
June, _ 2019
Mayor Marc C. McGovern
Vice Mayor Jan Devereux
Ordinance Committee Co-Chair Dennis J. Carlone
Ordinance Committee Co-Chair Craig A. Kelley
City Councilor Alanna M. Mallon
City Councilor Sumbul Siddiqui
City Councilor E. Denise Simmons
City Councilor Timothy J. Toomey, Jr.
City Councilor Quinton Y. Zondervan
795 Massachusetts Avenue
City Hall
Cambridge, MA 02139
Re:
Commitments and conditions accompanying the Petition for Grand Junction
Zoning attached hereto as Attachment A
Dear Mayor McGovern, Vice Mayor Devereaux, Ordinance Committee Co-Chair Carlone,
Ordinance Committee Co-Chair Kelley and Councilors Mallon, Siddiqui, Simmons, Toomey, .
and Zondervan:
The purpose of this letter is to describe commitments and benefits which ARE-MA Region No.
61, LLC ("Alexandria") is prepared to offer to the City of Cambridge to facilitate and enable
Alexandria's use and development of the Development Land, subject to the satisfaction of the
"Conditions" set forth below.
This letter is the "Letter of Commitment" referenced in Section.
_of the proposed
amendment to the Zoning Ordinance set forth in Attachment A (the "Grand Junction Zoning").
All capitalized terms not defined herein shall have the meaning given them in Attachment A.
This Letter of Commitment shall be binding upon and inure to the benefit of successor owners of
the Development Land; Paragraphs A(1) and A(2) below shall be binding upon and inure to the
benefit of successor owners of the Garage Parcel (hereinafter defined).
Alexandria's Commitments
A.
1.
Alexandria, by and through its affiliate, ARE-MA Region No. 58, LLC ("ARE 58), the
owner of the land and building known as the Kendall Square Garage (Tax Lot 39-174)
("Garage Parcel"), hereby agrees that any new building constructed on and as part of a
redevelopment of the Garage Parcel shall not exceed the height and massing of the
existing One Kendall Square Garage. Said restriction shall be effective on the issuance of
a Permanent Certificate of Occupancy for the Project and no challenge to the validity of
ActiveUS 174329297v.1
June
_ 2019
Page 3
the validity of the same shall have been made (or in the event of any challenge, such
challenge shall have been finally resolved in favor of such validity). The use of such
funds will be restricted to the purpose for which they are contributed.
NStar Electric Company d/b/a Eversource Energy ("Eversource") is the owner of Tax Lot
32-52 ("Eversource Land"), which abuts the Development Land. If Eversource offers to
sell the Property to Alexandria, then Alexandria shall use reasonable efforts to purchase
the Eversource Land, subject to and conditioned on the following: (i) title, survey and
the environmental status of the Eversource Land are satisfactory in Alexandria's sole
discretion; (ii) Alexandria's total cost to purchase the Eversource Land does not exceed
$12,929,000; and (iii) Alexandria shall not be obligated to Close on the purchase of the
Eversource Land until ninety (90) days after the Permanent Certificate of Occupancy is
issued for the Project and no challenge to the validity of the same shall have been made
(or in the event of any challenge, such challenge shall have been finally resolved in favor
of such validity. Alexandria's obligation under this Paragraph 5 shall terminate _ years
after the date of enactment of the Grand Junction Zoning
B. Conditions to Alexandria's Commitments
For purposes of clarification, Alexandria's commitments set forth above are offered if the
following conditions (the "Conditions") are met:
The amendments to the Cambridge Zoning Ordinance set forth in Attachment A are duly
adopted in the form attached hereto as Attachment A, and no challenge to the validity of
the same shall have been made (or in the event of any challenge, such challenge shall
have been finally resolved in favor of such validity.)
2.
Permits and approvals required under the Cambridge Zoning Code area granted, (a)
allowing Alexandria to construct a building(s) containing a total commercial space of at
least 400,000 square feet of Gross Floor Area (as defined in the Cambridge Zoning
Ordinance), subject to any reductions proposed by Alexandria (the "Project"), and (b)
Alexandria shall have commenced construction of the Project.
The appeal periods for the permits and approvals necessary for the Project, including
without limitation a Grand Junction Special Permit and an Article 19 Special Permit,
shall have expired without appeal having been made, or in the event that any appeal does
occur, the outcome of said appeal shall not result in a change in the validity, or reduction
in the development rights set forth in, the permits and approvals. All time periods
specified in this Letter of Commitment shall be tolled during the resolution of any appeal.
4.
So long as Alexandria, its successors and assigns, is proceeding with development and
until the Project is completed, the City shall not have initiated or supported any rezoning
ActiveUS 174329297v.1
June
_ 2019
Page 5
Limited Joinder of ARE-MA Region No. 50, LuC Solely with Respect to Sections A(1) and
A (2) o1 this Letter:
ARE-MA Region No. 58, LLC
By:
Alexandria Real Estate Equities, L.P.,
a Delaware limited partnership
By: ARE-QRS Corp.,
a Maryland corporation, General Partner
By:_
Name:
Title:
Attachment A - Form of Grand Junction Zoning
Attachment B - Garage Parcel--No Building Area
Attachment C - Landscaped Trellis Plan and Details
ActiveUS 174329297v.1
Attachment B - Garage Parcel--No Building Area
[Follows this page]
DRAFTI
ActiveUS 174329297v.1
ATACNMENT E
JULY 11, 2019
approved by the Linden Park Residents Association.
325 BINNEY STREET
Note: Statements in this presentation are made on behalf of the three Linden Park
Committee. Any final agreement and the details of such agreement would need to be
Neighbors that are part of the working group under the City of Cambridge Ordinance
LINDEN PARK PRESENTATION
• Height
• Density
OVERVIEW
Eversource
• Timing of GJP completion
Significant Concerns remain
• Working Group has made progress
Additional Community Benefits Proposed
• Inadequate community benefits relative to benefits to Alexandria
Density
Height - Two Levels
• Reasonable set backs
(double current zoning)
OUR THIRD PROPOSAL
Courtyard cutout between buildings
• FAR 2.5 considering only IA-l zoned land
115' along Binney Street (75'+ 40' mechanicals*)
80' building along Fulkerson (60° + 20' mechanicals)
300 Binney St.
301 Binney St.
66 ft - To Parapet
96 ft - To Parapet
88 ft - To Penthouse
111ft - To Penthouse
Bidg 1000
125 ft- To Parapet
147 ft - To Penthouse
320 Bent St.
Amgen One Kendall Sa
64 ft - To Parapet
B3 ft - To Penthouse
325 Binney St.
115 ft - To Penthouse
90 ft - Top of Occ Floor
NORTH OF BINNEY STREET
117 Sixth St.
30 ft - To Parapet
58 ft - To Penthouse
Garage
80 ft - To Penthouse
One Kendall Sa
60 ft- Top of Occ Floor
Annotated Materials Received From Alexandria 7/10/19
66 ft - To Top of Wall
BUILDING HEIGHTS IN TRANSITION ZONE
NORTH VS. SOUTH OF BINNEY STREET
BINNEY STREET
IA-1
130,697 SF
ENTS RES
FULKERSON STREET
DENSITY TO INDUSTRIAL FAR
CHARLES STREET
191,536 SF
TOTAL SITE AREA
60,839 SF
INAPPROPRIATETO CONVERT HOUSING
Slide 16 From Alexandria 6/18/19 Planning Board Presentation
MEMORIAL WAY
C-1
BINNEY STREET
130,697 SF
FULKERSON STREET
DENSITY TO INDUSTRIAL FAR
CHARLES STREET
C-1
(housing)
ANA GOTEN
191,536 SF
INAPPROPRIATE TO CONVERT HOUSING
MEMORIAL WAY
60,839 SF
Annotated Slide 16 From Alexandria 6/18/19 Planning Board Presentation
& Cafe
Jonnelly Field
G & J Variety
Berkshire St
cambridge
Cardinal Medeiros Ave
Brewing Company
One Kendall Square,
Cardinal Medeiros Ave
The Friendly Toast
Cornelius Way
Square Cinema
Michael Way
Bright Horizons
Landmark's Kendall
at Kendall Square
James Way
Memorial Way
Calilel Way
Alexandria
Fulkerson St
Rogers St
Fulkerson St
Bem St
Binney St
Eversource
Charles St
magery 82019 Google, Map data 02019 Google
Ironwood
dad Institute | 320C.
Kennedy Longfellow
SprinSchool
Thomdike St
Bth St
John A
United States
Ahern Field
Department
Pharmaceuticals, Inc
Cambridge Policer G
7th St
& Biogen
6th St
Rogers St
Bent St
Corrected Eversource Slide
Charles St
200 fl
Hurley Str
Thorndike St
Cambridge
Community Charter
School of Cambridg
Public Library
pany
ridge
Berkshire St
Cardinal MS
e du pays
MK Hair Studio
House & cafe
Cardinal Medeiros Ave
One Kendall Square
Cornelius
Bean Towne Coffee
Square Cinema
Michael Way
Bright Horizons
Landmarks Kendall
at Kendall Square
Memorial Way
Galile Way
Google
Alexandria
Fulkerson St
Eversource
Bent St
Fulkerson St
Binney St
Ironwood
Charles St
Kennedy binschool
RogerPharmaceuticals, Ine
John A
Ahern Field
• Department
Cambridge Police c
6th St.
ORIgInAl
Biogen
Rogers St
6th St
_Bent St
Imagery
Enney St
School of Cambridge
Community Charter
Charles St
Hurley St
@2019 Google
5th St
Map da
Evensounce Slide
EVERSOURCE
402
287:
• Traffic
Density
Eversource
• Loading Dock
• Light Pollution
• Noise Pollution
ONGOING CONCERNS
• Timing of development of GP
Adequacy of Community Benefits
Precedent for Future Development
# Noise
• Height
benefits
Single parcel zoning
absent neighbor agreement
• Inadequate offset/ community benefits
Planning Board raised concerns regarding:
5 of 7 Planning Board members did not support petition,
JUNE 18, 2019 PLANNING BOARD MEETING
• Lack of commitment letter for review when weighing community
COMMUNITY BENEFITS
Cornelius Way Property Line*
1 "Buffer zone" from Eversource Property
*Not included in current petition, as filed and amended
Donation of Grand Junction Pathway Land
Potential community benefits on the table:
Design/Development of Grand Junction Pathway Land*
• Fund for Linden Park Community Improvements/Mitigation*
• $1 3M available to purchase Eversource land, if opportunity arises*
Easement for triangle of property between OKS Parking Garage and
offered
BENEFITS
~239,000 SF)
Total of Current
*According to Alexandria
Community Benefits
Alexandria (additional
Total Value of Upzoning to
them to build a lab building under current zoning
~$20 million
$IOM - $20M*
VALUE OF UPZONING VS. COMMUNITY
of $315-$450 million
Increase in annual revenue of
Alexandria representative told the public that it would be profitable for
Increase in gross building value
$1,342 per SF
$1,880 per SF
$1,800 per SF
BENEFIT TO ALEXANDRIA
Reasonable Valuations of Additional SF:
IMPACT OF UPZONING PETITION:
Source: Alexandria sale of 60% of 75/125 Binney Street, February 2019
Source: MIT sale of 90% share in three Osborn Triangle Buildings, May 2019
Source: Dr. Rafi Mohammed, May 25, 2019 comments re recent building sales
14
Working Group
COMMUNITY OUTREACH
East Cambridge Planning Team
Cambridge Residents' Alliance
Bicyclist groups, incl. Cambridge Bike Safety
I City Council and Linden Park Neighborhood
Liveable Cambridge (over 7 neighborhood groups)
SUMMARY
• Density
Alexandria
Eversource
• Timing of GJP completion
Significant Concerns remain
Close to Agreement on Height
• Inadequate community benefits relative to benefits to
ATTACHMENT F
One Kendall Square, Building 600
CAMBRIDGE
Suite 6-105, Cambridge MA 02139
[phone removed] | cambridgechamber.org
CHAMBER of COMMERCE
[email removed]
President and CEO
David P. Maher
July 10, 2019
Board Chair
Jay Kiely
Councillor Dennis Carlone
Brookfield Properties
Councillor Craig Kelly
Secretary
Robyn Culbertson
Members of the Ordinance Committee
Ofice for Tourism
Cambridge, MA 02139
Treasurer
Stephen Meunier
Sanofi Gencyme
Re: Grand Junction Pathway Overlay District
Board Members
Alex Allia
The Charles Holel
Dear Chairmen and Members of the Ordinance Committee:
Ken Barron
CARD Associates
Brian Burke
On behalf of the Cambridge Chamber of Commerce, I am writing to voice our support for the
Microsoll
Alexandria Real Estate zoning proposal, because Cambridge's status as the leader in innovation
Kelly Flynn
is a title that needs support and reinforcement.
Takeda
Sarah Gallop
MIT
• The work being conducted every day in buildings just like the one Alexandria is pursuing is
transformative for our society. It's not hyperbole to say the research leads to therapies that
Holly Heslop
Camridge Kats & Beats
improve the quality of life for people around the world. The brightest minds come to
Sean Hope
Cambridge to learn and then take that knowledge and put it to use making the world a better
Hope Legal Services
place for people with chronic illnesses and rare diseases.
Bill Kanc
Bionfed Realty
Kendall Square thrives because of the constant infusion of talent, new ideas and opportunities
Pand Lee
Hong hong Restaurant
to collaborate among various companies and disciplines. This building would support all of that
Jelley Lockwood
by giving companies of varying sizes and maturity the opportunity to be part of the Kendall
Novartis
Square innovation cluster. If we cannot provide enough space for this research and
Thomas Lucey
Harvard Unicersity
development to occur, companies will look elsewhere to set up shop, and that would be a
monumental loss for the neighborhood, the city and the state. In addition to the important
Joseph Maguire
Alerandria Real Estate
work conducted within the buildings it must be stated that the tenants play a vital role in our
Jim MeSweeney
local economy by patronizing small businesses throughout East Cambridge.
CIP Group
Michael Medeiros
Turning to Alexandria specifically, I have experienced Alexandria's commitment to working
Rosal Sonesta Hotel
with the community first-hand going back to the Binney St. redevelopment. They exerted
Gilda Nogueira
East Cambridge Savings Bank
significant time and great effort to develop a proposal that was responsive to the
Wayne Palenaude
neighborhood and the result was a high-quality development that brought vitality to that
Cambridge Sarings Bank
corridor and has made a positive impact well beyond. This is the same process they've
Sasha Purpora
Food for free
followed for the 325 Binney St. proposal and their willingness to meet with neighbors and
Katherine Rafferly
reduce their project is a testament to their standing as a good partner for Kendall Square.
Mount Anburn Hospital
Deborah Ruhe
I urge you to support this petition and continue supporting Kendall Square as the center of
Just-A-Slarl
innovation.
Elizabeth Schwab
Gangle
Bill Zamparelli
Eversource
Emeritus Members
foe Barrell
lames Hawkins
Norman Mciver
ATTACNMENT G
July 11, 2019
Dear members of the Ordinance Committee,
I am writing for the Cambridge Residents Alliance to oppose App. 2019 No. 38 filed by Alexandria Real Estate.
Alexandria is asking the city to allow a large "bio building" in exchange for giving the city a small strip of land for the
Grand Junction Pathway. These community benefits are too small to justify this huge upzoning, which would hugely
increase the return on investment for Alexandria. We strongly support the Grand Junction Pathway. However, we feel
creating the pathway should not be exchanged for granting Alexandria permission to build an oversized building near
residents' homes. The decision on the building should be independent of the pathway. The city can and will find other
means to execute the pathway, including the $10 million it has already appropriated.
The Residents Alliance appreciates that Alexandria has negotiated with residents and has reduced the height of the
building to 115' with mechanicals, but Alexandria's revised petition still proposes a huge increase in GFA compared to
the current zoning for a commercial building. I attended the last meeting of the Planning Board, where most members
said they could not support this petition, and the Chair said it was "contract zoning"... and said the "practice of site-
specific zoning is objectionable." The head of CDD said perhaps the petition did not match the goals of Envision for
more housing.
The current zoning is intended to provide a transition to the residential neighborhood, as supported in the Envision
plan: "create an intermediate sense of scale between adjacent activities." The proposed building is out of character
with the neighborhood. Buildings north of Binney St. should be lower than buildings south of Binney; currently there is
no building as high as the proposed building in the transition zone north of Binney St. We oppose any proposal that
increases the current zoning to allow a taller office building with more density on the corner of Fulkerson and Binney
Streets. Granting Alexandria's petition would create a bad precedent for allowing other large buildings to border
residential neighborhoods across the city, and specifically, could set a bad precedent for the parcel on which the
parking garage on Binney St. currently sits.
The Cambridge Residents Alliance wants to see more housing in Kendall Sq. to accommodate the thousands of jobs
being added there. More housing is one of the top Envision plan priorities: "increase overall housing production." The
Planning Board Vice Chair said he would support this proposal if it were housing, and the Chair proposed the Planning
Board should ask for more housing when upzoning is requested. This parcel is already zoned to have greater density
and height for housing. We would strongly support an appropriate residential building in this location. In addition, a
residential building would have smaller and quieter mechanicals, and would create less traffic, and therefore would
impact residents less. We also are concerned about the traffic generated by the 1000 new jobs in the proposed new
building and the additional demand for housing from those workers. While Alexandria has said they "are not housing
developers," in fact they have built housing when required as part of a PUD project. We ask that the Council deny this
commercial upzoning, and instead encourage Alexandria to build housing.
We oppose any upzoning petition that increases energy demand in East Cambridge until the city and Eversource find an
acceptable alternate site for the proposed Fulkerson St. substation. At the Council hearing on Eversource, I heard
Eversource say that they are not including the proposed new development in eastern Cambridge, including the
Alexandria proposal, in their estimate of the additional electrical power needed. That is why we ask that the Planning
Board and Council not approve any more commercial upzonings until this issue is resolved
We note that the proposed open space between a dense bio-building and an electrical sub-station is not useful to the
public. Lastly, we request that the Ordinance Committee ask the petitioner to preserve all trees on the site.
We respectfully request that you vote against granting Alexandria's petition.
If the Council at some point approves Alexandria's petition, we ask that it mandate that Alexandria complete
construction of the Grand Junction Path segment before being granted a certificate of occupancy. That is the only way
to ensure that Alexandria delivers the pathway faster than the city could complete it.
We also ask that if it were to approve the petition, the Council require Alexandria to file a deed restriction to keep the
One Kendall Sq. Garage at its current height, as a condition of approval.
Sincerely,
Lee Farris
VP, Cambridge Residents Alliance
269 Norfolk St. 02139
The Cambridge Residents Alliance: Working for a Livable, Affordable and Diverse Cambridge
www.cambridgeresidentsalliance.org • [email removed]
Crane, Paula
ATTACHMENT H
Jason Alves < [email removed]>
From:
Sent:
Wednesday, July 10, 2019 9:25 PM
To:
City Council; Crane, Paula
Subject:
Support for GJ Overlay Petition
Attachments:
ARE Grand Junction_Refile Support.pdf
Dear Councillors,
Please see attached letter of support for the Grand Junction Overlay zoning petition.
Jason Alves
Executive Director
East Cambridge Business Association
Office: [phone removed]
@EastCambBiz
www.EastCambridgeBA.com
East Cambridge ~ Wellington-Harrington ~ Inman Square ‹
One Kendall Square ~ Lechmere Square
ECBA
THE EAST CAMBRIDGE
www.EastCambridgeBA.com
BUSINESS ASSOCIATION
Executive Director
July 9, 2019
Jason Alves
Cambridge City Council
Executive Director
795 Massachusetts Ave
[email removed]
Cambridge, MA 02139
Office [phone removed]
Members of the Ordinance Committee,
Board and Officers
The East Cambridge Business Association (ECBA), is offering our support for the Grand
Patrick Magee, President
Junction Overlay zoning petition re-filed by Alexandria Real Estate (ARE).
Atwood's Tavern
[email removed]
The new petition, with its recent modification, is the result of substantial effort by a
working group which has been meeting for several months. The working group, consisting
Stephen LaMaster, Clerk
of residents, Ordinance Committee chairs, and petitioner, has produced a petition that is
Vinfen
responsive to abutters concerns of height and massing and is a suitable compromise that will
Michelle Lower, Treasurer still deliver the great benefits this petition offers in the Grand Junction Path.
Alexandria Real Estate
Equities
The benefits of the Grand Junction amenities should not be undervalued. The ECBA
Michelle Carter
has long advocated for the creation of the Grand Junction Multiuse Path (GJMP) and this
Divco West
petition will advance its timeline significantly. The path will improve the connections
between Cambridge Street businesses and Kendall Square workers. The path will also
Carl Fantasia
connect to a network of paths that will bring many residents and visitors and support the
New Deal Fish Market
Cambridge Street business district. Alexandria conveying the land required for the path
greatly advances the timetable of this project, and. we hope that the City and petitioner can
Paul Ferreira
reach an agreement so that construction of this path can happen simultaneously with the Met
Cambridge Printing Co.
Pipe redevelopment rather than waiting until a certificate of occupancy is issued.
Lenny Frisoli
Alexandria Real Estate continues to be a good example of the type of corporate
Frisoli Associates, P.C.
citizen we want doing business in the City of Cambridge. They have been responsible
developers that are willing to listen and engage with the community, and also great partners
Michael Grill
in helping the City and small businesses community reach common goals. We also commend
Fairlane Properties
the residents, working group members and councillors who have worked hard to produce a
successful outcome for the neighborhood and business district.
Virginia Johnson
Gather Here Stitch Lounge
We hope you vote in favor of the Grand Junction Overlay petition.
Michael J. Ring
The Law Office
Sincerely
of Michael J. Ring
Mark Rogers
Rogers Properties Group
Jason Alves
Executive Director
East Cambridge Business Association
East Cambridge Business Association P.O.Box 410386 Cambridge, MA 02141
email: [email removed] ~ Office Phone [phone removed]
Crane, Paula
AITACH MENT I
From:
Matt Connolly <[email removed]>
Sent:
Thursday, July 11, 2019 1:30 AM
To:
City Council
Cc:
Clerk; City Manager; Pamela Van Dort
Alexandria Upzoning Petition
Subject:
Attachments:
2019-07-10 Letter to Ordinance Committee about Alexandria Petition.pdf
Dear Councillors:
Please see the attached letter about Alexandria's upzoning petition (App 2019 No. 38). While progress has been made
between the Linden Park Neighborhood and Alexandria, significant issues remain. I therefore request that the petition
remain in committee until these issues are resolved.
Please include this letter in the public record.
Thank you for your consideration.
Matt Connolly
13 Cornelius Way
Cambridge, MA 02141
Matt Connolly
[email removed]
LinkedIn
Cambridge City Council
City Hall
795 Massachusetts Ave
Cambridge, MA 02139
July 11, 2019
RE:
Alexandria Upzoning Petition (App 2019 No. 38)
Dear Councillors,
I write about Alexandria's proposed upzoning petition for the former Metropolitan Pipe Site,
including its email to the Council on July 10. Alexandria's latest proposal, as described in its
email and at the working group, is of tolerable height and contains many neighborhood benefits
that will help mitigate the impact from this project. The neighborhood members of the working
group have tentatively agreed to the proposed height. But contrary to what Alexandria suggested
in its email, the neighborhood has not agreed to this petition and does not support the project in
its current form.
I request that the Ordinance Committee keep this proposal in committee for at least four reasons.
1.
The proposed building will worsen the need for the Eversource substation on
Fulkerson Street
The Council has consistently held that the current proposed location for the Eversource
substation on Fulkerson Street is inappropriate. And rightfully so: The station would abut the .
Kennedy-Longfellow school on one side and two residential neighborhoods on others.
The prospect of the substation became even worse on June 25 when Eversource presented a
preliminary concept for the station at a hearing of the Transportation & Public Utilities
Committee:
Figure 1
Preliminary Design of Eversource Substation
(From Eversource June 25 Presentation to T&PU Committee)
0 O
PRELIMINARY CONCEPT ONLY
Eversource has not said what the height of the station will be but presented examples at the
hearing that ranged from 80-110 feet. It also said that the substation on Fulkerson would be
larger, potentially double the size of the examples provided. It is therefore possible that this
station will be much higher.
Eversource has said that the substation is needed because of the current and planned
development in Kendall Square, nearly all of which is commercial or MIT lab space, including" :
the many lab buildings Alexandria already operates. The need for the substation does not account
for the major proposed upzonings in the area (CambridgeSide, the Courthouse, the Constellation
site, and Alexandria), and does not account for buildings already in construction or many others
that are likely to come. If approved, Alexandria's building will unquestionably draw power from
the substation. And it could force Eversource to make the substation even bigger.
Knowing that any commercial upzoning will increase the impact of the substation, the City can
no longer ignore this problem. If the Council approves this petition, it's not approving just one
building. It's two:
2
Figure 2
Alexandria and Eversource Sites!
(Adapted from slide provided by Alexandria)
402'
287
• FLOORS
IA-1
If the Council is unwilling to accept both together, it cannot approve either separately. They are
a package deal.
The developers who have benefited from the development should be responsible for the costin
this case the substation needed to power their buildings. Without the Council's efforts, we risk
the opposite result: by forcing a substation within feet of a school, park, and several nearby
houses, East Cambridge residents will bear the cost for a substation they do not want or need.
It comes down to this: The Council cannot oppose the Eversource substation while approving the
upzoning that makes it necessary. Cause and effect should be treated alike. The developers who
have benefited so much from Kendall's development should now be responsible for the cost of
that development. In other words, no commercial upzoning proposal-including this one-
should be approved until developers solve the problem they caused.
II. The petition should include housing
Alexandria claims that this building will bring in 1,000 new permanent jobs, almost all of which
will go to non-Cambridge residents. This will increase the demand for housing and cause many
of those who cannot find affordable housing to drive and worsen the already crowded streets on
' This image assumes that the substation will extend to the XO Communications building directly across from the
Kennedy-Longfellow school. If Eversource does not own that land, the substation will be somewhat narrower (and
likely higher).
3
Cardinal Medeiros, Binney, and Fulkerson. Nothing in Alexandria's petition addresses this and
the other costs from such a sizeable upzoning.
The current proposal is exclusively for lab space and provides 0 feet for housing, affordable or
not. Indeed, the City upzoned the Met. Pipe site about 20 years ago to give an incentive for
housing, and that zoning would allow hundreds of thousands of feet for desperately needed
residences. If the City approves an upzoning for lab space instead, it will undo that housing
incentive and forever abandon the housing potential. The Planning Board, when considering
CambridgeSide's upzoning request over the last several months, expressed significant concerns
about the amount of proposed housing, which at the time was about 125,000 sf, 50% of which
would be affordable. From a housing perspective, Alexandria's petition is far worse. The best
Alexandria can say is that it will pay $6.6 million under a mandatory zoning incentive fee. It is
unclear how much affordable housing this fee can fund or when, but it is unlikely to be much.
To compound the problem, to get the density it wants for its laboratory building, it is taking
residential density from the C-1 portion of the site and converting it to industrial:
Figure 3
Residential zoning used for industrial building
(Adapted from slide provided by Alexandria)
IA-1
C-1
60,839 SF
(housing)
130,697 SF
TOTAL SITE AREA
191,530 SF
Alexandria is doing so at the 1.25 FAR that the City set to encourage housing on this site - not
the standard 0.75 FAR that is generally applicable in C-1 zoned land. This is a terrible
precedent.
At a minimum, Alexandria should not be permitted to misuse residential density. Preferably, the
Council would go further and require Alexandria to include housing on this site. This is the last
large area in Kendall that could support housing, and the site is an ideal location, as it is near
public transportation and jobs. Alexandria has provided no reason why its development
shouldn't have housing, other than to say they're not housing developers. That's not a good
reason.
4
III. Alexandria should complete the Grand Junction Pathway segment before
receiving a certificate of occupancy
Alexandria has staked its petition on providing the land it intends to deed for the Grand Junction
pathway segment between Cambridge and Binney Streets. This is not the benefit Alexandria
makes it seem. The City had already appropriated $10 million for this part of the pathway and
was committed to completing it. The real benefit then would be for Alexandria to complete the
pathway faster. It won't: The petition requires only that Alexandria convey the required land
"no later than the issuance of the Certificate of Occupancy for the first building constructed on
he Development Land .... (Section 20.1011). The occupancy certiticate won't be issued for
years, and the proposed ordinance doesn't even require that Alexandria build the pathway—
which would likely take several years after the deed is conveyed. This is no better than what the
City was already pursuing.
To provide an actual benefit, the petition should require Alexandria to pay for the completion of
the pathway and for it to be completed before issuing a Certificate of Occupancy.
IV. The windfall Alexandria will receive from this project will more than pay for
these requested changes
We have repeatedly asked Alexandria why they need an upzoning so much larger than the other
nearby buildings in the transition area. They have acknowledged that (i) there is no special
purpose to this project that needs the additional height or density, (ii) their project would be
profitable under current zoning, and (iii) the height is not needed to fund some other portion of
the project (unlike CambridgeSide, for example).
Instead, Alexandria-a company worth $18.4 billionclaims it needs the upzoning to "justify"
the proposed community benefits, which they value at about $10-$20 million—a cost of roughly
$42-$84 per square foot of upzoned space (237,000 sf).?
Even if 14' of land along a railroad track and an abandoned hair salon really were worth $10-$20
million (which we doubt), this pales in comparison to the windfall Alexandria would reap from
its petition. As part of the CambridgeSide Galleria's recent upzoning petition, Dr. Rafi
Mohammed submitted comments on how the City should consider the economic gross upside a
developer receives from an upzoning petition in this area.? Based on recent building sales, he
determined that the approximate gross value of upzoning at the CambridgeSide site was about
$1,342 per square foot.4 As high as this figure is, it's likely conservative: In May 2019, MIT
announced that it has sold three buildings on the Osborne Triangle in Kendall Square for $1.1
2 Alexandria has sometimes included its offer to buy the Eversource land for Eversource's purchase price, should the
substation be relocated, in its community benefit figures. That offer is currently speculative and not included in the
petition, so it cannot be considered as part of the benefit Alexandria is providing in this petition.
See Dr. Rafi Mohammed, "Don't fall into trap of bargaining downward on the giant CambridgeSide mall
rezoning," Cambridge Day (last revised on May 25, 2019), available at
http://www.cambridgeday.com/2019/05/24/dont-fall-into-trap-of-bargaining-downward-on-the-giant-
cambridgeside-mall-rezoning/. As Dr. Mohammed also acknowledged, these figures don't account for the
developer's costs and certain risks. Alexandria has not disclosed these costs (and likely won't), but we remain open
to adjusting our analysis based on verifiable information Alexandria provides.
5
billion for a 90% share in the buildings, about $1,800 per square foot. Indeed, Alexandria sold
60% of 75/125 Binney Street in February 2019 for $438 million-$1,880/sf. Applying Dr.
lohammed's and the more recent Osborne Triangle rates to the square footage at issue
lexandria would receive a building worth about $220 million - $290 million under currer
zoning based on its slides. And Alexandria's much larger proposed building under the petition
would be worth $540 million - $720 million:
Figure 4
Gross Zoning Values
Petition Value
Baseline
Upzoned value
Current Zoning
Value (163,000 sf)
(400,000 st)
(+237,000 st)
Dr. Mohammed
$318,054,000
$536,800,000
$218,746,000
Average ($1,342/sf)
Osborne Triangle
$720,000,000
$293,400,000
$426,600,000
($1,800/st)
In exchange for its claimed $10-$20 million in community benefits, it would receive about $318
million - $427 million in gross upzoned value.
With this margin, there is no need for Alexandria to pull from residential density, it can include
housing in its project, and it can timely complete construction of the pathway. Most important, it
would have considerable capital to buy an alternate site for the Eversource substation. The
Council should compel it do so.
For these reasons, I respectfully ask that the Ordinance Committee vote to hold the petition in
committee until these important issues can be addressed.
Thank you for your consideration.
Sincerely,
/s/Matthew Connolly
Matthew Connolly
13 Cornelius Way
Cambridge, MA 02141
[email removed]
5 Tim Logan, MIT-owned lab buildings change hands for reported $1.1 billion, The Boston Globe (May 17, 2019),
available at https://www.bostonglobe.com/business/2019/05/17/mit-owned-lab-buildings-sold-for-
reported/kYksBT78MCHoslaCTAYhoK/story.html?event=event12. The Globe article values the purchase at
$1,625/sf, but this assumes that the buyers purchased the entire stake in the buildings, not just 90%. Based on a 90%
interest, the valuation is $1,800/sf ($1.1 bn / 679,000 sf / 90%). It's also unclear how the article accounts for the
parking spaces in its calculations and the purchase price may not include land in the sale, so these numbers may
need to be further revised based on more information.
• Alexandria SEC Form 10-Q for the period ending Mar. 31, 2019, at 66, available at
http://www.snl.com/Cache/c397733927.html.
6
ATTACNMENTT
Lopez, Donna
From:
Jim Gray <[email removed]>
Sent:
Thursday, July 11, 2019 5:25 PM
Clerk; City Council
To:
Cc:
James Gray; Matt Connolly; Pamela Van Dort
Subject:
Alexandria's re-zoning petition (APP #38)
Dear City Council,
As a resident of the Linden Park Neighborhood, I have been closely following the issued related to Alexandria's re-zoning
petition (APP #38), and request that it be kept in committee for the reasons presented so eloquently by my neighbors
Pamela Van Dort, Matt Connolly, and others.
Best Regards,
Jim Gray
2 Michael Way
:
ATTACHMENT K
Lopez, Donna
From:
Piotr Mitros < [email removed]>
Sent:
Thursday, July 11, 2019 8:52 AM
To:
City Council; Clerk
APP #38
Subject:
I am writing to request that Alexandria's petition (APP #38) be kept in committee.
I think the neighbors who will be at the meeting speak for most of the community, so I won't repeat their concerns. One
minor point l'd add is that there is a block of open space in the proposal. I think putting a park there or similar would be
a nice addition, with no costs / downsides to ARE, and lots of upsides to the community.
Piotr
Lopez, Donna
ATTACHMENT L
From:
Crane, Paula
Sent:
Thursday, July 11, 2019 1:48 PM
To:
Lopez, Donna
Subject:
FW: Met Pipe
--Original Message----
From: Hazel Arnett <[email removed]>
Sent: Thursday, July 11, 2019 1:29 PM
To: Crane, Paula <pcrane@cambridgema.gov>
I AM STRONGLY AGAINST THE REFILED PETITION FROM ALEXANDRIA REAL ESTATE EQUITIES INC. THIS COMPANY OVER
THE YEARS HAS LITERALLY RAPED THE CITY OF CAMBRIDGE. ENOUGH ALREADY! THE ANSWER IS NO NO
NO!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!••••••••!!!!!!!!
HAZEL ARNETT
CAMBRIDGE REAIDENT
ATTACHMENT M
Planning Board
City of Cambridge
City Hall Annex
344 Broadway
Cambridge, MA 02139
July 11, 2019
Regarding Grand Junction
Members of the Cambridge Planning Board,
I am writing in support of the Zoning petition filed by Alexandria Properties, which is
designed to create the Grand Junction Pathway Overlay District. The petition seeks to enable
an exchange of development rights for conveyance of land for the completion of a section of the
Grand Junction Multi-use pathway, an important route in and out of Kendall Square that I
previously supported in my role on the Volpe Working Group.
While the discussion of a proposed multiuse pathway has been ongoing for many years, there
continue to be many hurdles, and the City seems unlikely to independently proceed with the
significant cost and logistical planning required to make this path a reality on it's own any time
soon. Development of this infrastructure is critical to the Volpe site's permeability and access by
surrounding neighborhoods, as well as mitigating the expected increases in daytime traffic to
and from the Kendall Square area as it continues to develop.
Any development has impacts upon the surrounding community; therefore the collection of
revenues by the city for Alexandria's proposed build, transferring approximately 6 million dollars!
in needed funds to the Cambridge Affordable Housing Trust, should not be ignored for it's
contribution to replenishing the city's stock of badly needed affordable housing.
I'd previously hedged some level of support based upon my neighbors at Linden Court who
have voiced concern about the impact of the proposed development on light, noise,
and additional traffic, and understand they have arrived at an agreement on size that has
significantly reduced the overall height and massing. I know that the process is not yet
complete, and there will be a number of other opportunities during design phase of the project to
mitigate noise and additional concerns. However, I want to urge both the Council and
Alexandria to ensure that the design and construction of the multiuse path begin at permitting
and avoid the additional delays that will occur if the timing of this project is not included as a
contiguous component of the re-development. The Cambridge CDD data shows that within a
half-mile of the Grand Junction corridor are 42% (49,000) of the jobs and 31% (33,000)
of the residents in Cambridge. All residents of Cambridge need safe routes for walking
and other non-vehicular mobility to safely travel to work, school and play. An
expeditious resolution to the permitting and completion of this pathway will go a long
way toward what Cambridge citizens want and need in this regard.
Respectfully,
Steve LaMaster
395 Windsor Street
Cambridge, MA 02141
ATTACHMENT N
MassBio
main: 617 • 674• 5100 fax: 617 • 674• 5101
Massachusetts Biotechnology Council
July 11, 2019
300 Technology Square, Eighth Floor
Cambridge, MA 02139
Cambridge City Council
Ordinance Committee
City Hall
759 Massachusetts Avenue
Cambridge, MA 02139
RE: Grand Junction Pathway Overlay District
Dear Members of the Cambridge City Council Ordinance Committee and Cambridge Planning Board:
On behalf of the Massachusetts Biotechnology Council (MassBio) and its 1200+ member organizations (285
members in Cambridge), I write to support the extension of the Grand Junction Pathway Overlay District to allow
for Alexandria Real Estate Equities, Inc. to develop 325 Binney Street into a lab building.
Massachusetts is home to one of the largest biopharma clusters in the world, with Cambridge housing the largest
percentage of these companies. The biopharma industry in Massachusetts directly employs over 74,000 people,
representing one-year growth of 6% and 35% growth in the past ten years. Maintaining our growth and status as a
global leader in this industry requires near constant addition of space for new and expanding companies, and of
upmost importance to our industry, the creation of additional lab space for these companies.
Cambridge specifically is home to the largest percentage of biopharma companies in the state, with hundreds of
companies across all stages. Cambridge-based companies received 62% of all biotech venture capital investment in
Massachusetts in 2017, and half of all Massachusetts-based biopharma companies with IPOs in 2017 were
headquartered in Cambridge as well.
Cambridge and its companies are leading the way in creating new treatments and therapies to help patients around
the world, and in order to do so continue to need additional lab space, which is why MassBio supports the
development of 325 Binney Street into lab facilities.
Thank you for your consideration.
Best regards,
Rk loughlin,
Robert K. Coughlin
President and CEO
City of Cambridge
ATTACHMENTO
Ordinance Committee
795 Massachusetts Ave.
Cambridge, MA 02139
July 11, 2019
Regarding Grand Junction
Members of the Cambridge Ordinance Committee,
1am writing in support of the zoning petition filed by Alexandria Properties, which is
designed to create the Grand Junction Pathway Overlay District.
Soon after moving to Cambridge in the fall of 2005, I was riding my bicycle home from
school when I was hit by a car, flew over the hood of the vehicle, and broke my arm when I
landed on the other side. The accident occurred as I was riding my bike northbound on
Cardinal Medeiros Ave. I was hit when the driver of a car on Binney Street didn't see me in
the midst of other vehicular traffic, rolled through a stop sign and entered the intersection.
If a well-marked alternative path for pedestrians and cyclists had existed, I am certain I
would have been on it and that I would not have been hit. The Grand Junction Pathway
Overlay District would create such a nearby, parallel pathway.
While the discussion of a proposed multiuse pathway has been ongoing for decades, there
continue to be many hurdles, and the City seems unlikely to independently proceed with the
significant cost and logistical planning required to make this path a reality on it's own any
time soon. The Zoning petition filed by Alexandria Properties would help make this
pathway a reality now in the near term.
Fourteen years after my accident, I am now raising two young children in the Wellington
Harrington neighborhood and I would like to see this pathway built as soon as possible so
that my children do not have to take the same risks that I did while biking or walking
between our neighborhood and Kendall Square.
The Cambridge CDD data shows that within a half-mile of the Grand Junction corridor are
42% (49,000) of the jobs and 31% (33,000) of the residents in Cambridge. Personal
experience tells me that Cardinal Medeiros Ave is a particularly dangerous street for cyclists
due to its lack of bike lanes, high traffic congestion, high traffic speeds, and a large number
of commercial trucks entering and exiting One Kendall Square just south of Binney St.
All residents of Cambridge need safe routes for biking, walking and other non-vehicular
mobility to safely travel to work, school and play, particularly in such a congested area that
currently lacks any safe alternative for non-vehicular traffic. An expeditious resolution to
the permitting and completion of this pathway will go a long way toward what Cambridge
citizens want and need in this regard.
sincerely,
Phil Mckenna
135 Willow St. Apt 3
Cambridge, MA 02141
AtTACHMENT P
Lopez, Donna
Isabel Caceres < iac|[email removed]>
From:
Sent:
Thursday, July 11, 2019 4:39 PM
Clerk; City Council
To:
Alexandria's Up-zoning Petition at Former Met Pipe Site
Subject:
Dear City Clerk and City Counsiloors
I have been a Cambridge resident fro the last 28 years and would like to respectfully request to City Councillors, at the
Ordinance Committee meeting scheduled for today 7/11/19, to please keep this petition in Committee.
This will allow us, the residents impacted by this petition, to have time to discuss the remaining issues going forward,
such that mitigate light, traffic, and noise pollution, among other community concerns that this development will bring
to the surrounding neighborhoods.
Sincerely,
Isabel Caceres
6 Cornelius Way,