Search ▸ Agenda item attachment
COM 97 #2021 : communication was received from Robert J. La Tremouille, regarding a private interstate off ramp to MIT.
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative.
Friends of the White Geese
An Attorney General Registered Charitable Organization since 2001,
Defending the Charles River, its Animals, Trees and Water From destructive Governmental Entities.
Post Office Box 391412
Cell: [phone removed]
Cambridge, MA 02139
E-Mail: [email removed]
Website:
http://friendsofthewhitegeese.org
February 16, 2021
City Manager Louis A. DePasquale
City Council, City of Cambridge
795 Massachusetts Avenue
c/o City Clerk
795 Massachusetts Avenue
Cambridge, MA 02139
Cambridge, MA 02139
RE: A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Segment 1.
A private Interstate Off Ramp to MIT sold as a Bike Path, with major harm to the Charles River,
and to the Cambridge Environment, General.
The key part of an outrage.
Introduction.
2.
3.
190 connection to MIT.
MIT's Interstate Off Ramp — details on the "Bike Path" stalking horse
Segment II:
Introduction.
0.
1.
The Stalking Horse, part 0- The Grand Junction Railroad Bridge.
2.
The Stalking Horse, part 1, at the Charles River - the SECRET part..
3.
The Stalking Horse, Part 2, official overview.
4.
The Stalking Horse, part 3, temporary southern terminus or, if Cambridge had a responsible City Council, the
permanent southern terminus.
5.
The Stalking Horse, part 4, MIT's proposal for bike connection to Memorial Drive — The reality on the
6.
The Stalking Horse, part 5, Who knows?.
Segment 1. A private Interstate Off Ramp to MIT sold as a Bike Path, with major harm to the Charles River, and to
the Cambridge Environment, General.
1.
The key part of an outrage.
THE CITY CLERK
ASSACHUSETTS
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 2
February 16, 2021
more stills from this source, only providing the minute as identification.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
•
1:39 / 13:53
•
This is an overall picture of the area we have been studying. The Magazine Beach Playing fields, Woods and
Swimming pool are very prominent in the middle. Also prominent toward the bottom is the narrow portion of 190
which needs to be replaced, plus Soldiers Field Road below it.
Less visible AND KEY are the BU Bridge, the Grand Junction railroad bridge, the Destroyed Nesting Area of the
Charles River White Geese, the doomed wild area, and the Grand Junction Railroad which runs through and is
targeted by the Massachusetts Institute of Technology.
Details below.
2.
Introduction.
It is so distressing to see Cambridge Pols selling con games to well meaning people. We could go on and on and on.
The basic con is:
DO NOT LOOK AT WHAT WE ARE DESTROYING..
LOOK AT WHAT WE TELL YOU TO LOOK AT-
The Charles River White Geese, other free animals and the Charles River environment are beloved by decent human
beings and attacked by frauds who call themselves environmental saints.
One of the big differences from the past is that we now have drones flying around in the skies which help call liars
liars.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 3
February 16, 2021
Plus there are good people involved. On the Charles River the good people are the Massachusetts Department of
Transportation.
The bad peopie, as usual, are the Cambridge City Council, related bureaucrats, fake "protectors" who do exactly the
opposite, and too many others. The bad folks scratch each others backs and lie and lie and lie. People who have
been conned, however, can be very aggressive about stabbing themselves in the their own backs because they trust
people who should not be trusted.
I have been working on the state's plans to correct a very dangerous situation on the Boston side of the Charles River
from the habitat which is directly being attacked by the Cambridge City Council and by bureaucrats from the
Massachusetts Department of Conservation and Recreation.
Cambridge and the DCR. have very terrible plans for the Charles River. They have been fighting for destruction
using various frauds. This report is about a fraud which claims to be helping bicyclists. Much of the fraud is quite
beneficial. MassDOT is protecting the bicyclists from the bad stuff.
There is a railroad track going through the eastern part of Cambridge called the Grand Junction railroad. There are
big plans there, most of it is good.
As usual, the bad stuff has been kept as secret as possible froin the victims. The worst of it can be avoided, and we
have tried to heip well meaning people from, once again, being shafted by their government, and we have proposed a
limited modification which could make the plans responsible.
Our proposal is on Page 26, on a map provided by MIT, next to an alternative
raised by MIT.
MassDOT, once again, is standing up to dirty tricks coming out of the Cambridge City Council and the DCR. I have
responded to those dirty tricks and communicated a lot of responses.
Reality dates back to 2003 when the regional transportation authority, the Massachuselts Bay Transportation
Authority proved it possible to create an off ramp from 190 to the Metropolitan Institute of Technology. This off
ramp is behind so much of the outrages on the Cambridge side of the Charles River.
The bad guys have tried to sneak in dirty tricks publicly AND LOST. So they are trying to sneak them into
MassDOT's proposal
A. to make safe the portion of 190 which is across the Charles River from Magazine Beach, and
B.
to straighten out 190. Straightening out is now possible because of:
(1) the relocation of the major Beacon Park railroad yard to Worcester; and
(2) improvement in technology with regard to management / charging of users.
The portion which needs to be replaced is now 40 to 50 years old.
It is raised and being held together by extreme measures which are needlessly expensive because the segment is
beyond its proper replacement time.
Cambridge and friends are trying to use this repair work to assist in the creation of the off ramp which was proven
possible in 2003, and which is an update of the "Inner Belt."
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 4
February 16, 2021
Here is how it works.
3. 190 connection to MIT.
Never mentioned in all the piety from the Cambridge pols is the demonstration by the MBTA in 2003 that an off
ramp can be built from 190 to the north through Cambridge, specifically to the heart of the campus of the
Massachusetts Institute of Technology OR FURTHER.
Their sales pitch is "bike path" / other euphemisms, not mentioning that the bike path, IF THE POLS HAVE THEIR
WAY, will be the stalking horse for that off ramp.
From minute 4.39 of the Drone footage:
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
HAZI
Play (k)
4:39 / 13:53
On the left side, in the V between the BU Bridge and the on ramp to Memorial Drive, is the Destroyed Nesting Area
of the Charles River White Geese. The Grand Junction railroad bridge can be seen on both sides of the BU Bridge.
It runs under the BU Bridge.
Following that line to the left can be seen the Grand Junction Railroad Tracks heading to MIT. The buildings
directly above that track, starting from the tallest building, are MIT buildings.
Looking to the right, the BU Bridge meets Commonwealth Avenue Boston ABOVE 190, the Mass. Pike. 190 comes
to that point from the bottom right hand corner. Closer to the Charles River than 190 and running under the BU
Bridge is Soldiers Field Road, the Boulevard on the Boston Side of the Charles River which matches Memorial
Drive in Cambridge.
To the bottom left can be seen the Magazine Beach Playing Fields blocked off from the Charles River by the
Starvation Wall.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 5
February 16, 2021
At minute 4.40 is a closer view of the same relationship.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
The MBTA study proved an off ramp can be built from the east bound lanes (upper / right side) of 190 AT THIS
POINT to the Grand Junction River Bridge. The study showed that a ramp in the opposite direction can be built
from the Grand Junction Railroad Bridge to the west bound (lower/left lanes.
The one problem with the MBTA plan was that the bridge is not wide enough to build both the railroad and the off
and on ramps. Dah, dah, all those lovely people and the Cambridge City Council are fighting to add to the 190
rebuild a widening of the Grand Junction Bridge.
They call it bike paths. The reality is that, once it is built and it is convenient for MIT, there is no reason from the
point of view of MIT to continue to call it bike lanes. Once MIT decides it is convenient and politically feasible,
they have their private off ramp to 190. That off ramp can be extended beyond the Main portion of MIT to Kendall
Square, Cambridge and, quite possibly over the extent of the "bike path" toward the Somerville line.
Nearly fifty years ago, Cambridge activists defeated a super highway in this area. It was called the "Inner Belt."
I had the honor of being an intern in the governor's office when he announced the killing of the inner belt, although I
was working on other matters. Very discretely, on my own, I was in the middle of a legislative bicycle victory.
Without my having any visibility, some associates of mine, in consultation with me, achieved a veto of an
inadvertently harmful bike bill which passed both houses without negative comment.
Cantabridgians from that time period are very proud of the victory over the "Inner Belt."
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 6
February 16, 2021
Here from minute 9.13 is the same view from the east (upper in the prior picture).
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
0:22
9:13 / 13:53
¢
•
Here from minute 10.54 is the view from the west showing the Grand Junction Railroad Bridge (on right) connecting
to the Grand Junction Railroad toward the MIT Campus. It has to go under Memorial Drive to get there.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
10:54 / 13:53
#F
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 7
February 16, 2021
At the top can be seen the Mass. Ave. ("Harvard" Bridge) which connects directly to the main part of the MIT
Campus.
Here, from minute 9.28 is the Grand Junction track running from this point to Massachusetts Avenue.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
13:53
° +
From the left, first is the Grand Junction. Then is Vassar Street. Then is Memorial Drive. At the top is the Mass.
Ave. Bridge. Massachusetts Avenue and the Grand Junction connect straight ahead.
To those in the process of being fooled, the Grand Junction widening is sold as a bike path. The MBTA plan
showed it as an off ramp going to the heart of the MIT Campus.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 8
February 16, 2021
Segment II:
MIT's Interstate Off Ramp — details on the "Bike Path" stalking horse
0. Introduction.
To put it succinctly, the usual cast of characters in Cambridge are trying to sell a super highway off ramp through
Cambridge, MA. The super highway lost 50 years ago when it was honestly called a super highway, the "Inner
Belt." This time they are calling it a bike path.
Here are two key still photos from above. Six others provide detail in that segment. The photos are stills from
"From Cambridge to Boston with the DJ Inspire 1 Drone footage," posted at
https://www.youtube.com/watch?v=sN-OmMzvHhw. These photos are taken from minutes 4.40 and 9.28.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
213.6
Minute 4.40, above, shows the area where the off ramp will originate (on the right, doing a loop from the inbound
side next to Commonwealth Avenue and the BU Bridge), the Grand Junction Railroad Bridge (It needs to be
widened to handle the Inner Belt Highway, under middle part of the BU Bridge. Perhaps it will be TEMPORARILY
used as a bike path, but the stab in the back would work more easily early on. The Cambridge end can be seen
beyond the left portion of the BU Bridge), and the future path of the stalking horse (mid left). The Destroyed
Nesting Area of the Charles River White Geese is between the BU Bridge and the Grand Junction. The Wild Area is
beyond the Grand Junction facing the Charles River.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 9
February 16, 2021
Minute 9.28, below, shows the path of the proposed renamed and redescribed Inner Belt.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
28/13:53
• +
The future Inner Belt is the left of three vertical highways. The middle road is Vassar Street. The road on the right
is Memorial Drive.
The stalking horse bike path is projected to be built on the left portion of the left highway to allow connections to
Memorial Drive off and below the picture. The connection would be by a fairly new highway. The con is that this
connection directs bike traffic the far more dangerous way to Memorial Drive. The plans for the construction of this
highway showed thick tree planting which has not gone forward. That could be because I pointed out to a developer
type that the trees to be planted left room for highway connectors to the new road from the Mass. Pike off ramp. If
you know what to look for, those openings were damning.
Responsible alternatives would connect a real bike path ON THE RIGHT SIDE OF THE GRAND JUNCTION right
of way to Vassar Street in either of two routes,
A. by a narrow taking of private property slightly below the bottom of the photo and then to Memorial Drive
safely or
B by the alternative proposed by MIT - by an existing walkway from Cambridge's Fort Washington Park
(trees halfway up to the left) to Vassar Street and then to Memorial Drive.
In sections 3 and 4 below are key parts of Cambridge's presentation of the stalking horse, the bike path which would
disappear when the new Inner Belt is constructed. After Cambridge's con game, in section 5, is the simple map
presented to the Cambridge City Council by MIT which shows its proposal and Cambridge's. Without the con
game, it shows the con game's reality.
Section 2 presents some of the secret stuff. A little of our analysis is included in Section 4.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 10
February 16, 2021
We regret not showing a lot of tree destruction coming. This is a long report. Including tree destruction would make
it a book.
1.
The Stalking Horse, part 0- The Grand Junction Railroad Bridge.
Everything depends on widening the Grand Junction Railroad Bridge. The powers that be in Cambridge have
worked on different excuses. This excuse is a bike bath. It sounds so great!!!
The excuse the local transit authority, the MBTA, had to study widening of the Grand Junction in the first place was
to put in an express bus from Newton to Kendall Square. Express Buses tend to run maybe two or three times in in
the morning with return trips in the evening.
The amount of money which would be needed to be expended to create a route for three buses per day each way
absolutely would not justify the amount of money needed to upgrade facilities. That was obvious from the
beginning.
The MBTA noticed the funding reality after spending all that money on the research. Golly gee.
The Grand Junction was the "obvious" route for their new express bus.
They did the engineering. They proved that the Grand Junction Railroad Bridge over the Charles could be modified
by cantilevering a new lane off the existing bridge while continuing one lane of train service.
The current con game claims to be providing two lanes for rail with one lane width for a bike path.
The important thing is GET THAT EXTRA LANE. Once they have the extra
lane, they can SUDDENLY change the use as is convenient for MIT and other
developers and businesses along the Grand Junction.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 11
February 16, 2021
Here is a good photo of the Grand Junction Railroad Bridge from the west side of the BU Bridge.
The very Southern end of the portion of the portion of the Grand Junction Railroad Bridge over the Charles is shown
at the bottom of the photo.
As can be noted, the Grand Junction used to consist of two tracks each using one side of the bridge over the Charles
River. This photo shows that the west side (shown to the right) has been abandoned.
The tracks move to the middle of the two lanes when the track goes over Soldiers Field Road on the Boston side.
They then curve to go under 190.
If you look straight ahead, you can see a green highway sign over the outbound side of 190. If you look REALLY
carefully, you can even see a car straight ahead on the outbound side. Access to the Outbound side of 190 is simple.
Instead of going down at this point to get under 190, you go up to create a ramp to the outbound vehicle traffic side.
The complicated part was how to get inbound and outbound traffic associated with areas to the west of the BU
Bridge. The MBTA devised the loop as we show in section 0 for inbound traffic.
There is not enough room for ramps for associated traffic in both directions on 190. The MBTA study proposed a U
turn on the Mass. Pike to the west of the Grand Junction Bridge to allow outbound traffic to switch to the inbound
side of 190 and the loop ramp to the Grand Junction to resolve that.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 12
February 16, 2021
That U turn was relatively cheap. It was done years ago just east of the former toll booths at the Brighton /
Cambridge exit. But Cambridge and the DCR still needed to widen the Grand Junction Bridge by any means that
worked.
This particular tactic is to call the off ramp a bike path.
I have a whole bunch of photos of this area of 190 and where the ramp could go. But the Drone photos do a lot more
with less time needed. Really a more useful use of our and your time is to go into the connection on the Cambridge
side.
A photo showing the Cambridge end of the Grand Junction Railroad Bridge is the next photo below.
The Stalking Horse, part 1, at the Charles River - the SECRET part.
2.
Cambridge has spent a lot of time on the responsible parts of what it calls the
Grand Junction bike path / other euphemism. It would be a good project IF
IT WERE REAL AND NOT A STALKING HORSE. The key modification is
also included.
The responsible way to provide the bike path is to move the bike path to the right (east) side of the Grand Junction
right of way. This would allow the bike path to connect to Vassar Street followed by access to Memorial Drive. The
bike path should not go under Memorial Drive because of the associated very major destruction on the Charles River
and on its banks.
See Page 26, below.
The state Department of Conservation and Recreation has already done massive destruction on Memorial Drive in
January 2016 WITH CAMBRIDGE ASSISTANCE including but not limited to the Cambridge City Council's
VERY LOUD silence when this outrage called for objection.
I had been keeping the Cambridge City Council up to date with photos and comment in emails multiple times a
week starting in September 2015, emails which do not go into the official record.
Our video, Memorial Drive Destruction, final cut, posted at https://www.youtube.com/watch?v-pTp|CCEJP7o, goes
into great detail based on the DCR's plans which were written by its predecessor, the Metropolitan District
Commission with assistance from Cambridge "planners."
The MDC was destroyed by the Massachusetts legislature at least in part to protect the
Charles River from the destructiveness of the MDC "planners" The "planners" proceeded
to move to the DCR with their outrageous plans and with the assistance of the extremely
destructive Cambridge Development Department and the Cambridge City Council.
Outrages are continuing at Magazine Beach. These plans with analysis are on line at
http://focrwg.com/agendal.html. This is my letter to the Cambridge City Council in response to FALSE claims of
environmental sainthood during a rally led by city councilors on the steps of Cambridge City Hall.
The plans included destruction of the excellent woods east of the Grand Junction at the Charles River. The DCR
destroyed hundreds of mostly excellent trees, but did not destroy this excellent woods.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 13
February 16, 2021
Now, the DCR has proceeded with lying "public notices" for hearings which they included those plans in a project
which was advertised as having an eastern end at the BU Bridge. They then announced the reality that the plans
went to that doomed woods. The key slides are presented below/
Here are the doomed woods, the Wild Area, and the plans for destruction. There are much more detailed plans
available for destruction in the "Destroyed Nesting Area of the Charles River White Geese which is off camera to the
left. The white figures are a gaggle of the Charles River White Geese. The place has much greater diversity. A lot
of the other free animals have been driven away, but many remain / have returned. The Grand Junction railroad
This is the last remaining natural wild in this part of the Charles River.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 14
February 16, 2021
Here are the most visible, but most definitely, not the only victims of this outrage, the Charles River White Geese,
admiring the Charles River in the winter, viewing from their Destroyed Nesting Area looking under the Grand
Junction railroad bridge.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 15
February 16, 2021
Here are the destruction plans. They show both halves. The massive destruction in the Wild Area, to the right, is
shown by displaying only ONE TREE NOT DESTROYED.
541
В неанном
If the stalking horse ends above Memorial Drive (the almost horizontal line from right to left as currently identified,
it would be a responsible project
The upper right part of these plans is near the location where the bike path should connect to Vassar Street as shown
on page 26.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 16
February 16, 2021
Here is another winter shot of the Charles River White Geese. The view looks through the Wild Area from the
sidewalk next to the Destroyed Nesting Area and the Wild Area.
This bay stays liquid during the most frigid part of the winter. The Charles River White Geese also use this natural
harbor for refuge during the most extreme storms. Their goose down jackets protect them in winter. Having non
frozen water is very valuable on the coldest days.
DCR plans shown above would destroy EVERY TREE BUT ONE in this picture. The balance of the plans were
implemented in the January 2016 outrage.
From the day this shot was taken, I also have photos of Canada Geese, not familiar with the turf, hunkering down in
the cold Nesting Area.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 17
February 16, 2021
This is the key slide from the DCR's FALSELY PUBLICIZED presentation in
which they change the definition of "BU Bridge" to include the Wild Area.
In this slide, the Wild Area is at the extreme right. Note that the colored line
includes it as part of the "BU Bridge" which, physically, is the highway at the
bottom.
The bay shown above is probably the inbound curve toward the right. In the
destruction plan, it is probably the curve to the right of the Grand Junction.
All but one tree in the winter photo is planned to be destroyed by Cambridge
and the DCR.
And the Cambridge City Council has praised this outrage with skillfully deniable
praise.
Phase IV POP for Will Undeveloped - Font Reader
Share
Comment
Connect
Help
Eitres
• Tel ma
P0-
о-п-
Phase 2 RUP for WIL
B.U. Rotary/ Reid Overpass Concept
Alternative 2: Keep Overpass, Reconfigure At-grade Geometry
• Eliminates rotary aspect and
• Gains to parkland greenspace
controls all vehicle thru and
in all four quadrants
turning movements with signals
• Conflict points managed by
Flexibility for left-turn options
signalized crossings
Improvements to ped-bike
Improvements to ped-bike
crossings (north-south)
crossing (east-west)
41 4 46/56
• 9-
- +
00 00 3
• Type here to search
7124/2015
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 18
February 16, 2021
3.
The Stalking Horse, Part 2, official overview.
These plans and following plans are from the City of Cambridge's public plans on the internet for the stalking horse
bike highway. The part of the bureaucracy responsible is the Cambridge Development Department.
This is what the well intended victims are shown as the overview of the project. "GLX" in green letters at the right
indicates the Green Line Extension being constructed from Lechmere Station to Tufts University in Medford.
_Existing Grand
Paul Dudley
Junction Park
White/Mern Drive l
Allston 1-00
Mass. Ave
GLX Project
Miller's Rive
Somerville City Lin
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 19
February 16, 2021
Here is the dirty part blown up as much
as my application will allow. Note the
stuff they are bragging about as
Paul Dudley
compared to the really irresponsible
terrible stuff they keep as secret as
possible. The bottom of the green line
is the point where the proposal goes
White/Mem Drive
from responsible to irresponsible.
Standard technique when you are
dealing with the City of Cambridge and
its friends is silence on the stuff they do
not want the voters aware of.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 20
February 16, 2021
Here is their map version, first the entire map with numbered explanation, then cropped to the southermost area with
their points 1 and 2;
1. Waverly Street at Henry Street (Path End)
2. Waverly Street (Pocket Park Opportunity)
3. Fort Washington Park (Pocket Park Opportunity)
4. Massachusetts Avenue between Vassar Street and
Albany Street (Path Crossing)
5. Main Street at Vassar Street and Galileo Galilei
Way (Path Crossing)
6. "Little Binney" - portion of Binney Street west of
Fulkerson (Path Crossing)
7. Cambridge Street (Pocket Park Opportunity)
8. Cambridge Street between Cardinal Medeiros
Avenue and Lambert Street (Path Crossing)
9. Gore Street near Warren Street (Path End)
And here is the portion at the Charles.
Cambragepon
Both this map version and the prior version are extremely
general south of Memorial Drive. That portion has been
HEAVILY PLANNED, but it is kept secret from people
being suckered into the bad part by showing the much larger
innocuous BUT TEMPORARY part.
MIT's map on page 26 shows part of what Cambridge's
"planners" keep secret south of Memorial Drive.
Point 1 is the supposed terminus. Point 2 is the bike reroute
to Memorial Drive. Note that the marked path continues to
Memorial Drive, temporarily.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 21
February 16, 2021
4.
The Stalking Horse, part 3, temporary southern terminus of, if Cambridge had a responsible City Council,
the permanent southern terminus..
Here again is our second still at the beginning for the overview at this level.
From Cambridge to Boston with the DJI Inspire 1, Drone Footage
Play (k)
8/ 13:53
* #
Here is the detailed part of the map overview again,
because it is the only map I can find from their
presentation showing where the bikes are
supposedly being directed to.
Cambrageport
Greater detail is provided on MIT's map on page
26.
02
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 22
February 16, 2021
The curved street coming out of point 1 is Waverly Street. It was created supposedly as access for planned
development further up the Grand Junction. The plans included a very detailed tree planting schedule. The trees had
spaces created in what otherwise was a very thick planting plan. To somebody familiar with the way plans are
presented, these spaces allowed for access to Waverly Street from the off ramp coming from 190.
That connection on the left is a very key reason for running the "bike path" in the left part of the Grand Junction right
of way.
This interconnection structure allows for connection of 190 traffic to Memorial Drive. Major tree destruction is
ongoing along Memorial Drive to rearrange the Magazine Beach park to reduce access between the park and
Memorial Drive and thus to speed up traffic on Memorial Drive for the benefit of the traffic coming off 190. The
Cambridge City Council has put money on planning for the destruction of the excellent grove across from the
MicroCenter parking lot.
The curved, C shaped, area in the left
middle of this map is in Magazine Beach's
beautiful park.
That curved area is being reduced to one
curb cut with major tree destruction as
part of this outrage, also part of speeding
up traffic.
The doomed thick MicroCenter /
Bathhouse grove is a few hundred feet
further west to the right of that curve..
See the hook shaped parking area which is
to the grove's west and south.
Destroying that grove allows access to Magazine Beach to be moved and relocated across from a public street which
goes through the MicroCenter parking lot. In both cases, access curb cuts to the west would disappear (that hook
shaped curve), further speeding up traffic on Memorial Drive.
The BU Bridge extends to neighborhood streets directly above it. This area is a traffic nightmare, especially when
the Boston Red Sox have a home game on the Boston side of the BU Bridge.
BIKE TRAFFIC IS BEING ROUTED INTO THIS TRAFFIC NIGHTMARE.
WHY?
Because the purpose is not a bike path, it is for creating access to Memorial Drive for traffic coming from 190.
Routing bike traffic into a nightmare is a prepared excuse to kill the bike path.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 23
February 16, 2021
Note on the map the street following the bike highway directly to its right and below it. That street, Vassar Street, is
"coincidentally" blocked by the numbers 1 and 2. It turns and goes straight to Memorial Drive at the number 1,
another "coincidentally" not shown reality.
Here is a photos of that side of the bike path. The photo is taken from the leg of Vassar Street toward Memorial
Drive. Straight ahead is the corner of Vassar Street. The land between Vassar Street and the Grand Junction, the
"wrong side" from the bike path IS UNDEVELOPED.
The land between Vassar Street and the
"wrong side" of the Grand Junction is
an obvious target for access to Vassar
Street and then to Memorial Drive,
short and simple, without the traffic
nightmare built into the supposed plans.
This is VERY CLEAR from MIT's
map in the next section.
But, if you want a route which you can
"suddenly" discover is too dangerous to
route bikes, you use the dangerous side,
to the left and up, and have an excuse to
use the dangerous side for Memorial
Drive access from 190.
Here is the Grand Junction side of that
building. Note the abutment for
parking at the corner, next to the
building.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 24
February 16, 2021
Here are Cambridge's lovely plans bragging about the southern terminus of the bike path with access on the wrong
side from the safe side for bikes going to Memorial Drive.
Pocket Park Opportunity
at Waverly Street Entrance
4.00 м а
Pocket Park
Opportunity: Path Entry
at Waverly
KEY PLAN
The images to the right show the
size and shape of the proposed
pocket park location at the
Waverly Street path entrance.
I assume that 1 and 2 in the photo are the same as in the prior plan. The building below 1 and 2 is the one
photographed above. The photo crop stops at the corner of the UNDEVELOPED LAND shown in the second prior
Cambridge has been selling the responsible parts of this outrage for years. Standard con game. Get well intentioned
folks sold, then stab them in the back.
The "bike path" will
disappear for the off ramp
when it is convenient for
MIT. The suckers, AS
pays
amputat
USUAL, will be shocked.
192-5030
This area shows in the first
still above, as the thick trees
above the BU Bridge on the
Cambridge side. There is a
very large former Ford Plant
between the two.
Here is a good cropping of
another representation in the
plans.
Note the building in our two
photos is toward the lower
right corner. THIS
PRESENTATION SHOWS
ON THAT BUILDING'S
LEFT THE
UNDEVELOPED area which
should be used for access to
Vassar Street and Memorial
Drive.
Harvard University
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 25
February 16, 2021
Once again, although it is there, the bend of Vassar Street is only minimally
visible, but it is more than in the other plans. The route for bikes to take to the
DANGEROUS Brookline Street is the curved street coming from the "park."
Brookline Street, to no surprise, is not shown. It is the next street after the vertical
street and will be crucial in the "Oh Golly Gee" stage when MIT decides MIT
wants the off ramp. It is very visible in MIT's plan on page 26.
Where would the parking go from the strip taken for bike travel? The bottom right corner of this plan shows a
corner of the Hyatt Regency Hotel complex. It or its neighbor off the plan has open lot parking to the left of the
Hyatt Regency at this spot.
It would not be at all difficult to add a floor deck over that parking to accommodate the few cars parked in the area
taken for bike access. Public taking with subsequent property division should really not be a big thing.
The bikes have much easier access to Memorial Drive than in the con game.
5.
The Stalking Horse, part 4, MIT's proposal for bike connection to Memorial Drive - The reality on the
Charles.
Expanding the
Cambridge analysis
presented above to
include Cambridge's
Point 3. Point 3 is
Ared 2
Cambridge's Fort
Washington Park.
Cambridge's analysis
3
calls for open space
but does not mention
the attractiveness of
area next to the Park
area for connection to
Vassar Street.
0X2)
BOSI
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 26
February 16, 2021
MIT submitted to the Cambridge City Council an extended analysis of the area / Grand Junction Path dated October
2014. It has a lot of graphics.
Here is MIT's summary map of the options in the southern Grand Junction area. MIT's map is a LOT CLEARER
than what the City of Cambridge is putting out now. I have marked on MIT's summary map a broken black line, the
sensible connection we proposed in the prior section.
DR. PAUL DUOLET WHITE Y
Grand lunation nath routing antions near the Bl! Rridor
At the bottom of the map is Memorial Drive. Immediately above Memorial Drive and toward the right / east is
Vassar Street. In contrast to the Cambridge presentations, the bend of Vassar Street is clearly shown. Above Vassar
Street is the supposed "bike path." MIT's map shows the DANGEROUS bike access to Brookline Street (point 2)
and which has the traffic nightmare KEPT SECRET in the Cambridge Analysis.
I have drawn the broken black line between the "bike path" and the bend of Vassar Street. This is the sensible
connection I propose above. My proposed terminus and connection clearly goes straight ahead with a simple, fast
connection to Memorial Drive.
Even ignoring traffic, connection to Memorial Drive by Cambridge's proposed route by way of Brookline Street is
clearly vastly inferior. But the bike path FOR THE SUPERIOR BIKE ACCESS has to be on the lower, southern
side of the Grand Junction. The responsible bike access to Memorial Drive for bikes cannot be simply modified to
the 190 off ramp and connection of the 190 off ramp to Magazine Street and Memorial Drive.
MIT HAS ITS OWN PROPOSAL FOR A BIKE CONNECTION TO VASSAR STREET. It is the marking
between the "bike path" and Vassar Street to the right and up from my proposed connector. MIT's access is at the
point marked 3 in Cambridge's presentation of the "bike path" con.
The number 1 on MIT's map shows the route which MIT would take from the Fort Washington crossing to get to
Memorial Drive. The route is simple although inferior to my proposal.
The MIT connection would cross over to Vassar Street from the Ft. Washington area, turn right and turn left. This is
inferior to my proposal because MIT's "bike path" is on the northern side of the right of way (see next paragraph). It
is also inferior because bicycles have a larger area shared with motor vehicles in the MIT alternative.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 27
February 16, 2021
MIT's map also gives a sample of the outrage south of Memorial Drive which Cambridge keeps secret.
That is marked by number 4, DIRECTLY THROUGH the Nesting Area of the Charles River White Geese. The
nesting area and the Wild Area at number 5 are the only areas available for free animals in this part of the Charles.
Access requires the bike path (future 190 off ramp) to be on the left / western side of the Grand Junction.
Route 4 would destroy the Nesting Area to which the reprehensible DCR and Cambridge have confined the Charles
River White Geese without food. The Destroyed Nesting Area is the last portion of the 40 year habitat of the
Charles River White Geese which has not been destroyed to them. The Charles River White Geese are most
definitely not the only free animals living south of Memorial Drive. They are simply the most visible and the
residents who are clearly loved.
Once again, the MIT "bike path" is on the left / west for access to Brookline Street / Memorial Drive for 190 traffic if
not through the Destroyed Nesting Area.
Additionally, the fence which Cambridge demands next to the bike path would destroy free animal access between
the Destroyed Nesting Area and the Wild Area.
And we have shown more in section 2 above.
6.
The Stalking Horse, part 5, Who knows?
SOMERVILLE
The minimal point at which the off
ramp from 190 will end is
Massachusetts Avenue. In reality,
9
this updated Inner Belt could end at
any of the other major streets in the
stalking horse maps. At the very
Welington-rarington
northern end, a lot would depend on
the receptivity of Somerville.
East Cambriage
Here is Cambridge's key locations
map cropped to the possible end
points of the 190 off ramp / Inner Belt
Key location 4 is Mass. Ave.
The Port
Key location 5 is Main Street.
Mur s
Between 5 and 6 is Broadway, not
5
numbered. Could this be the target?
Keeping it secret is ominous dealing
T
with Cambridge.
Key location 6 is Little Binney Street.
Key location 7 / 8 is Cambridge
Street in East Cambridge.
Key location 9 is Gore Street, Cambridge / Medford Street, Somerville. To the left it directly connects to the
McGrath / O'Brien Highway which is elevated at this point, but access already exists in the street structure.
Somerville / the DCR have mentioned lowering the McGrath / O'Brien to ground level.
A private Interstate Off Ramp to MIT sold as a Bike Path with major harm to Cambridge
Page 28
February 16, 2021
In another map, Cambridge notes that "GLX" is above the bike way. In this map, note the T annotation to the top
right marked Lechmere. This is the current location of the Lechmere terminus on the Green Line. The Lechmere
Station is being moved to the other side of McGrath / O'Brien Highway for the Green Line Extension to Tufts /
How far will the off ramp go? There is no telling. All that is clear is that Cambridge is running a con game calling it
a "bike path" / other euphemism from the Charles River to Somerville.
III.
On Line Reporting
The segments of these reports may be viewed on line as follows.
Segment I:
https://www.blogger.com/blog/post/edit/19|2|262/6697413398555732422
Segment Il:
https://www.blogger.com/blog/post/edit/19121262/7990771314241769450
Modifications have been made to fit this presentation and for clean up of the presentation.
They foremont