Search ▸ Agenda item attachment
An application was received from James J. Rafferty, requesting permission for a curb cut at the premises numbered 600-624 Main Street; said petition has received approval from Inspectional Services, Traffic, Parking and Transportation, Historical Commission and Public Works. No response has been received from the neighborhood association
General Information
Attestation
Curb Cut
125504
Submitted On: Jun 07, 2021
Applicant
James Rafferty
[phone removed]
[email removed]
Location
600 Main St
Cambridge, MA 02139
Frontage (in feet)
see attached
Setback - distance from building to sidewalk (in feet)
4
Distance from proposed driveway to surrounding structures
and property line (in feet)
0
Length of proposed driveway (in feet)
4
Width of proposed driveway (in feet)
33
Size of proposed driveway (square feet)
132
Location of any trees, sign posts, fire hydrants, utility poles, etc., in direct vicinity of proposed driveway
see attached plan
Full Name
James J. Rafferty
Date
06/07/2021
Page 1 of 1
6/16/2021
https://cambridgema.viewpointcloud.io/
OFFICE OF THE CITY CLERK
CITY OF CAMBRIDGE
[phone removed]
FAX [phone removed]
ANTHONY I. WILSON PAULA M. CRANE
CITY CLERK
DEPUTY CITY CLERK
CITY HALL, 795 MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS 02139
Dear Neighborhood Representative:
This office is in receipt of a copy of an application from:
The City Council has directed that all curb cut petitions be submitted to the appropriate Neighborhood
Associations for the locality where the curb cut would be made, so that the association may have an opportunity for
review, prior to action by the City Council.
Please indicate by return mail your approval or disapproval of the petition within twenty-one days from the date
of this letter. If the response is "disapproval" please state reasons. Be sure to sign the form and include a daytime phone
number. I have enclosed a self-addressed stamped envelope to facilitate your reply.
As soon as this office has received both the completed application and your neighborhood association response, I
will place the petition on the agenda for the next City Council meeting. If I do not receive a response from your
neighborhood organization by twenty-one days from the date of this letter, I will place the petition on the agenda for the
next City Council meeting.
If your neighborhood association cannot complete its review by twenty-one days from today, you may extend the
reply time another seven days by requesting an extension by letter to me with a copy to the petitioner. However, I urge
you to make every effort to complete your review as soon as possible.
Thank you for your cooperation.
Sincerely yours,
Anthony I. Wilson
City Clerk
hereby _______ approve _______ disapprove of said driveway petition.
Comments: ____________________________________________________________________
Signature of authorized association representative
Daytime telephone no.
cc: Petitioner
June 16, 2021
James J. Rafferty for curb cuts for The Ragon Institute at 600-624 Main Street. One 33' wide curb cut for a loading dock,
one 24' wide curb cut for a below-grade parking garage, both located on Albany Street.
Area Four Neighborhood Coalition
Julian Cassa, Liz Layton,Jean Cummings, Laurie Friedman, Arleen Henry, Jonathan King, Nancy Ryan,D
RESET
PRINT
CITY OF CAMBRIDGE
APPLICATION FOR DRIVEWAY CUTS
AND OPENINGS ABUTTOR'S FORM
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners
including property owners directly across the street (may be more than one). If the abutting buildings are
condominiums then all condominium owners must sign.
600-624 Main Street
608-616 Main Street
X
MIT 650 Main Street LLC, by its manager, MIT Cambridge Real Estate LLC,
Patrick Rowe, Officer and not individually
One Broadway, 9th Floor, Suite 200, Cambridge, MA 02142
DocuSign Envelope ID: E6264E6C-1553-461E-87AA-DDE2F38A4030
5/28/2021
CITY OF CAMBRIDGE
APPLICATION FOR DRIVEWAY CUTS
AND OPENINGS ABUTTOR'S FORM
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners
including property owners directly across the street (may be more than one). If the abutting buildings are
condominiums then all condominium owners must sign.
600-624 Main Street
545, 565 and 575 Technology Square
MIT Real Estate, LLC, by its manager, MIT Cambridge Real Estate LLC,
Patrick Rowe, Officer and not individually
One Broadway, 9th Floor, Suite 200, Cambridge, MA 02142
X
DocuSign Envelope ID: 756422C0-932F-4651-998F-99A032B0E9E2
6/3/2021
CITY OF CAMBRIDGE
APPLICATION FOR DRIVEWAY CUTS
AND OPENINGS ABUTTOR'S FORM
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
To Whom It May Concern:
As owner or agent of
Cambridge, Massachusetts, I do hereby declare
approval
disapproval
of installment of Off-Street Parking Facility located at:
Signed:
Date:
Address:
Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners
including property owners directly across the street (may be more than one). If the abutting buildings are
condominiums then all condominium owners must sign.
600-624 Main Street
36 and 38-50 Albany Street
X
Massachusetts Institute of Technology
77 Massachusetts Ave, Building NE49-4000, Cambridge, MA 02139
DocuSign Envelope ID: 76F71E37-B91D-4F7C-ADE6-642C577C92E9
5/19/2021 | 3:32:47 PM EDT
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-TOC-1
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
TABLE OF CONTENTS
VOLUME ONE - NARRATIVE MATERIALS
VOLUME TWO (PART A) - GRAPHIC MATERIALS
SITE AND CONTEXT INFORMATION
EXISTING CONDITIONS PLAN
A-2
EXISTING CONDITIONS PHOTOGRAPHS
A-3
SITE CONTEXT PLAN
A-5
ZONING MAP
A-6
K2C2 STUDY AREA
A-7
EXISTING SITE BOUNDARY
A-8
ZONING ANALYSIS
ZONING ANALYSIS - HEIGHT LIMITS
A-9
ZONING ANALYSIS - BULK CONTROL PLANE
A-10
BUILDING MASSING
A-11
RENDERINGS
AERIAL VIEW - LOOKING SOUTHWEST
A-12
AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED)
A-13
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST
A-14
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED)
A-15
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST
A-16
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED)
A-17
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH
A-18
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19
VIEW FROM MAIN ST - LOOKING SOUTH
A-20
VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED)
A-21
AERIAL VIEW - LOOKING SOUTHEAST
A-22
AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED)
A-23
VIEW FROM MAIN ST - LOOKING WEST
A-24
VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED)
A-25
VIEW FROM ALBANY STREET - LOOKING NORTH
A-26
VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED)
A-27
VIEW FROM ALBANY STREET - LOOKING NORTHEAST
A-28
VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED)
A-29
VIEW OF ALBANY ENTRANCE - LOOKING NORTH
A-30
VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-31
VIEW OF PARKING ENTRANCE - LOOKING NORTH
A-32
VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-33
FLOOR PLANS
GROUND LEVEL PLAN
A-34
MECHANICAL PLATFORM PLAN
A-35
SECOND LEVEL PLAN
A-36
THIRD LEVEL PLAN
A-37
FOURTH LEVEL PLAN
A-38
FIFTH LEVEL PLAN
A-39
MECHANICAL LEVEL PLAN
A-40
ROOF LEVEL PLAN
A-41
ROOF LEVEL PLAN (GREEN ROOF AREA CALCULATION)
A-41A
GARAGE LEVEL ONE PLAN
A-42
GARAGE LEVEL TWO PLAN
A-43
LONG-TERM BICYCLE PARKING PLAN
A-44
SECTIONS AND ELEVATIONS
BUILDING SECTIONS
A-45
ATRIUM SECTION
A-47
STREETWALL ELEVATION
A-48
MAIN STREET ELEVATION
A-49
PORTLAND STREET ELEVATION
A-50
ALBANY STREET ELEVATION
A-51
CONCEPT MODEL
A-52
EXTERIOR ELEVATION WALL TYPES
A-53
DETAILED MAIN STREET ELEVATION
A-54
DETAILED ATRIUM ELEVATIONS
A-55
DETAILED PORTLAND STREET ELEVATION
A-56
DETAILED ALBANY STREET ELEVATION
A-57
PROPOSED WALL ASSEMBLY
A-58
PROPOSED MATERIALS
A-59
VOLUME TWO (PART B) - GRAPHIC MATERIALS
STREET SECTIONS
MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING)
B-61
MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED)
B-62
MAIN STREET SECTION AT OCULUS
B-63
MAIN STREET SECTION AT COLLOQUIUM ROOM
B-64
PORTLAND STREET SECTION AT BUILDING ENTRANCE
B-65
PORTLAND STREET SECTION AT CHILD CARE GARDEN
B-66
TYPICAL ALBANY STREET SECTION
B-67
LANDSCAPE DESIGN
OVERALL SITE PLAN
B-68
PROPOSED CURB CUTS
B-69
OPEN SPACE / PERMEABLE SPACE PLAN
B-70
PROPOSED OVERALL TREE PLAN
B-71
TREE PROTECTION PLAN
B-72
OVERALL MATERIALS PLAN
B-73
OVERALL LAYOUT PLAN
B-74
OVERALL GRADING PLAN
B-75
OVERALL PLANTING PLAN
B-76
LINEAR PARK / OCULUS PLAZA MATERIALS PLAN
B-77
LINEAR PARK / OCULUS PLAZA PLANTING PLAN
B-78
RENDERING OF LINEAR PARK
B-79
RENDERING OF OCULUS PLAZA
B-80
RAGON PLAZA / URBAN GROVE MATERIALS PLAN
B-81
RAGON PLAZA / URBAN GROVE PLANTING PLAN
B-82
RENDERING OF URBAN GROVE
B-83
RENDERING OF RAGON PLAZA
B-84
EVENING RENDERING OF RAGON PLAZA
8-85
SECOND LEVEL TERRACE GARDEN PLAN
B-86
SECOND LEVEL TERRACE GARDEN PLAN RENDERING
B-87
ROOF LEVEL GREEN ROOF PLAN
B-88
PLAYGROUND SITE CONTEXT
B-89
PLAYGROUND EQUIPMENT
B-90
PLAYGROUND SURFACING
B-91
PLAYGROUND GRADING
B-92
PLAYGROUND PLANTING
B-93
SHADOW STUDIES (MARCH & JUNE)
B-94
SHADOW STUDIES (SEPTEMBER & DECEMBER)
B-95
SHADOW STUDIES - NET NEW SHADOWS LASTING
B-96
LONGER THAN 2 HOURS
UTILITIES AND INFRASTRUCTURE
EXISTING CONDITIONS PLAN
B-97
EXISTING DOMESTIC WATER PLAN
B-98
PROPOSED DOMESTIC WATER PLAN
B-99
EXISTING STORM DRAIN PLAN
B-100
PROPOSED STORM DRAIN PLAN
B-101
EXISTING SEWER PLAN
B-102
PROPOSED SEWER PLAN
B-103
VOLUME THREE - TRANSPORTATION IMPACT STUDY
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-9
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ZONING ANALYSIS - HEIGHT LIMITS
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-10
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ZONING ANALYSIS - BULK CONTROL
PLANE
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-11
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
BUILDING MASSING
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-12
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
AERIAL VIEW LOOKING SOUTHWEST
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-13
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
AERIAL VIEW LOOKING SOUTHWEST
(TREES REMOVED)
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-41
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ROOF LEVEL PLAN
Available Green Roof Area 25,036 sf
Required Green Roof Area 20,028 sf
Proposed Green Roof Area 20,145sf
Green Roof Coverage 80.45%
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
B-104
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ROOF LEVEL PLAN
A-41A
ROOF LEVEL PLAN - GREEN ROOF CALCULATION
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
B-TOC-1
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
TABLE OF CONTENTS
VOLUME ONE - NARRATIVE MATERIALS
VOLUME TWO (PART A) - GRAPHIC MATERIALS
SITE AND CONTEXT INFORMATION
EXISTING CONDITIONS PLAN
A-2
EXISTING CONDITIONS PHOTOGRAPHS
A-3
SITE CONTEXT PLAN
A-5
ZONING MAP
A-6
K2C2 STUDY AREA
A-7
EXISTING SITE BOUNDARY
A-8
ZONING ANALYSIS
ZONING ANALYSIS - HEIGHT LIMITS
A-9
ZONING ANALYSIS - BULK CONTROL PLANE
A-10
BUILDING MASSING
A-11
RENDERINGS
AERIAL VIEW - LOOKING SOUTHWEST
A-12
AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED)
A-13
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST
A-14
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED)
A-15
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST
A-16
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED)
A-17
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH
A-18
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19
VIEW FROM MAIN ST - LOOKING SOUTH
A-20
VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED)
A-21
AERIAL VIEW - LOOKING SOUTHEAST
A-22
AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED)
A-23
VIEW FROM MAIN ST - LOOKING WEST
A-24
VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED)
A-25
VIEW FROM ALBANY STREET - LOOKING NORTH
A-26
VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED)
A-27
VIEW FROM ALBANY STREET - LOOKING NORTHEAST
A-28
VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED)
A-29
VIEW OF ALBANY ENTRANCE - LOOKING NORTH
A-30
VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-31
VIEW OF PARKING ENTRANCE - LOOKING NORTH
A-32
VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-33
FLOOR PLANS
GROUND LEVEL PLAN
A-34
MECHANICAL PLATFORM PLAN
A-35
SECOND LEVEL PLAN
A-36
THIRD LEVEL PLAN
A-37
FOURTH LEVEL PLAN
A-38
FIFTH LEVEL PLAN
A-39
MECHANICAL LEVEL PLAN
A-40
ROOF LEVEL PLAN
A-41
ROOF LEVEL PLAN (GREEN ROOF CALCULATION)
A-41A
GARAGE LEVEL ONE PLAN
A-42
GARAGE LEVEL TWO PLAN
A-43
LONG-TERM BICYCLE PARKING PLAN
A-44
SECTIONS AND ELEVATIONS
BUILDING SECTIONS
A-45
ATRIUM SECTION
A-47
STREETWALL ELEVATION
A-48
MAIN STREET ELEVATION
A-49
PORTLAND STREET ELEVATION
A-50
ALBANY STREET ELEVATION
A-51
CONCEPT MODEL
A-52
EXTERIOR ELEVATION WALL TYPES
A-53
DETAILED MAIN STREET ELEVATION
A-54
DETAILED ATRIUM ELEVATIONS
A-55
DETAILED PORTLAND STREET ELEVATION
A-56
DETAILED ALBANY STREET ELEVATION
A-57
PROPOSED WALL ASSEMBLY
A-58
PROPOSED MATERIALS
A-59
VOLUME TWO (PART B) - GRAPHIC MATERIALS
STREET SECTIONS
MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING)
B-61
MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED)
B-62
MAIN STREET SECTION AT OCULUS
B-63
MAIN STREET SECTION AT COLLOQUIUM ROOM
B-64
PORTLAND STREET SECTION AT BUILDING ENTRANCE
B-65
PORTLAND STREET SECTION AT CHILD CARE GARDEN
B-66
TYPICAL ALBANY STREET SECTION
B-67
LANDSCAPE DESIGN
OVERALL SITE PLAN
B-68
PROPOSED CURB CUTS
B-69
OPEN SPACE / PERMEABLE SPACE PLAN
B-70
PROPOSED OVERALL TREE PLAN
B-71
TREE PROTECTION PLAN
B-72
OVERALL MATERIALS PLAN
B-73
OVERALL LAYOUT PLAN
B-74
OVERALL GRADING PLAN
B-75
OVERALL PLANTING PLAN
B-76
LINEAR PARK / OCULUS PLAZA MATERIALS PLAN
B-77
LINEAR PARK / OCULUS PLAZA PLANTING PLAN
B-78
RENDERING OF LINEAR PARK
B-79
RENDERING OF OCULUS PLAZA
B-80
RAGON PLAZA / URBAN GROVE MATERIALS PLAN
B-81
RAGON PLAZA / URBAN GROVE PLANTING PLAN
B-82
RENDERING OF URBAN GROVE
B-83
RENDERING OF RAGON PLAZA
B-84
EVENING RENDERING OF RAGON PLAZA
B-85
SECOND LEVEL TERRACE GARDEN PLAN
B-86
SECOND LEVEL TERRACE GARDEN PLAN RENDERING
B-87
ROOF LEVEL GREEN ROOF PLAN
B-88
PLAYGROUND SITE CONTEXT
B-89
PLAYGROUND EQUIPMENT
B-90
PLAYGROUND SURFACING
B-91
PLAYGROUND GRADING
B-92
PLAYGROUND PLANTING
B-93
SHADOW STUDIES (MARCH & JUNE)
B-94
SHADOW STUDIES (SEPTEMBER & DECEMBER)
B-95
SHADOW STUDIES - NET NEW SHADOWS LASTING
B-96
LONGER THAN 2 HOURS
UTILITIES AND INFRASTRUCTURE
EXISTING CONDITIONS PLAN
B-97
EXISTING DOMESTIC WATER PLAN
B-98
PROPOSED DOMESTIC WATER PLAN
B-99
EXISTING STORM DRAIN PLAN
B-100
PROPOSED STORM DRAIN PLAN
B-101
EXISTING SEWER PLAN
B-102
PROPOSED SEWER PLAN
B-103
VOLUME THREE - TRANSPORTATION IMPACT STUDY
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
B-69
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
PROPOSED CURB CUTS
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
B-88
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ROOF LEVEL GREEN ROOF PLAN
Article 19 Application for Special Permit
May 25, 2021
I .,,
I
I
I
• • •
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-TOC-1
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
TABLE OF CONTENTS
VOLUME ONE - NARRATIVE MATERIALS
VOLUME TWO (PART A) - GRAPHIC MATERIALS
SITE AND CONTEXT INFORMATION
EXISTING CONDITIONS PLAN
A-2
EXISTING CONDITIONS PHOTOGRAPHS
A-3
SITE CONTEXT PLAN
A-5
ZONING MAP
A-6
K2C2 STUDY AREA
A-7
EXISTING SITE BOUNDARY
A-8
ZONING ANALYSIS
ZONING ANALYSIS - HEIGHT LIMITS
A-9
ZONING ANALYSIS - BULK CONTROL PLANE
A-10
BUILDING MASSING
A-11
RENDERINGS
AERIAL VIEW - LOOKING SOUTHWEST
A-12
AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED)
A-13
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST
A-14
VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED)
A-15
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST
A-16
VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED)
A-17
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH
A-18
VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19
VIEW FROM MAIN ST - LOOKING SOUTH
A-20
VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED)
A-21
AERIAL VIEW - LOOKING SOUTHEAST
A-22
AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED)
A-23
VIEW FROM MAIN ST - LOOKING WEST
A-24
VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED)
A-25
VIEW FROM ALBANY STREET - LOOKING NORTH
A-26
VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED)
A-27
VIEW FROM ALBANY STREET - LOOKING NORTHEAST
A-28
VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED)
A-29
VIEW OF ALBANY ENTRANCE - LOOKING NORTH
A-30
VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-31
VIEW OF PARKING ENTRANCE - LOOKING NORTH
A-32
VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED)
A-33
FLOOR PLANS
GROUND LEVEL PLAN
A-34
MECHANICAL PLATFORM PLAN
A-35
SECOND LEVEL PLAN
A-36
THIRD LEVEL PLAN
A-37
FOURTH LEVEL PLAN
A-38
FIFTH LEVEL PLAN
A-39
MECHANICAL LEVEL PLAN
A-40
ROOF LEVEL PLAN
A-41
ROOF LEVEL PLAN (GREEN ROOF AREA CALCULATION)
A-41A
GARAGE LEVEL ONE PLAN
A-42
GARAGE LEVEL TWO PLAN
A-43
LONG-TERM BICYCLE PARKING PLAN
A-44
SECTIONS AND ELEVATIONS
BUILDING SECTIONS
A-45
ATRIUM SECTION
A-47
STREETWALL ELEVATION
A-48
MAIN STREET ELEVATION
A-49
PORTLAND STREET ELEVATION
A-50
ALBANY STREET ELEVATION
A-51
CONCEPT MODEL
A-52
EXTERIOR ELEVATION WALL TYPES
A-53
DETAILED MAIN STREET ELEVATION
A-54
DETAILED ATRIUM ELEVATIONS
A-55
DETAILED PORTLAND STREET ELEVATION
A-56
DETAILED ALBANY STREET ELEVATION
A-57
PROPOSED WALL ASSEMBLY
A-58
PROPOSED MATERIALS
A-59
VOLUME TWO (PART B) - GRAPHIC MATERIALS
STREET SECTIONS
MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING)
B-61
MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED)
B-62
MAIN STREET SECTION AT OCULUS
B-63
MAIN STREET SECTION AT COLLOQUIUM ROOM
B-64
PORTLAND STREET SECTION AT BUILDING ENTRANCE
B-65
PORTLAND STREET SECTION AT CHILD CARE GARDEN
B-66
TYPICAL ALBANY STREET SECTION
B-67
LANDSCAPE DESIGN
OVERALL SITE PLAN
B-68
PROPOSED CURB CUTS
B-69
OPEN SPACE / PERMEABLE SPACE PLAN
B-70
PROPOSED OVERALL TREE PLAN
B-71
TREE PROTECTION PLAN
B-72
OVERALL MATERIALS PLAN
B-73
OVERALL LAYOUT PLAN
B-74
OVERALL GRADING PLAN
B-75
OVERALL PLANTING PLAN
B-76
LINEAR PARK / OCULUS PLAZA MATERIALS PLAN
B-77
LINEAR PARK / OCULUS PLAZA PLANTING PLAN
B-78
RENDERING OF LINEAR PARK
B-79
RENDERING OF OCULUS PLAZA
B-80
RAGON PLAZA / URBAN GROVE MATERIALS PLAN
B-81
RAGON PLAZA / URBAN GROVE PLANTING PLAN
B-82
RENDERING OF URBAN GROVE
B-83
RENDERING OF RAGON PLAZA
B-84
EVENING RENDERING OF RAGON PLAZA
8-85
SECOND LEVEL TERRACE GARDEN PLAN
B-86
SECOND LEVEL TERRACE GARDEN PLAN RENDERING
B-87
ROOF LEVEL GREEN ROOF PLAN
B-88
PLAYGROUND SITE CONTEXT
B-89
PLAYGROUND EQUIPMENT
B-90
PLAYGROUND SURFACING
B-91
PLAYGROUND GRADING
B-92
PLAYGROUND PLANTING
B-93
SHADOW STUDIES (MARCH & JUNE)
B-94
SHADOW STUDIES (SEPTEMBER & DECEMBER)
B-95
SHADOW STUDIES - NET NEW SHADOWS LASTING
B-96
LONGER THAN 2 HOURS
UTILITIES AND INFRASTRUCTURE
EXISTING CONDITIONS PLAN
B-97
EXISTING DOMESTIC WATER PLAN
B-98
PROPOSED DOMESTIC WATER PLAN
B-99
EXISTING STORM DRAIN PLAN
B-100
PROPOSED STORM DRAIN PLAN
B-101
EXISTING SEWER PLAN
B-102
PROPOSED SEWER PLAN
B-103
VOLUME THREE - TRANSPORTATION IMPACT STUDY
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-9
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ZONING ANALYSIS - HEIGHT LIMITS
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-10
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
ZONING ANALYSIS - BULK CONTROL
PLANE
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-11
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
BUILDING MASSING
Article 19 Application for Special Permit
May 25, 2021
Article 19 Application for Special Permit
April 20, 2021
Ragon Institute 2.0
A-12
RAGON INSTITUTE 2.0
MASSACHUSETTS GENERAL HOSPITAL
AERIAL VIEW LOOKING SOUTHWEST
Article 19 Application for Special Permit
May 25, 2021