An application was received from James J. Rafferty, requesting permission for a curb cut at the premises numbered 600-624 Main Street; said petition has received approval from Inspectional Services, Traffic, Parking and Transportation, Historical Commission and Public Works. No response has been received from the neighborhood association

APP 2021 #37·Council meeting Aug 2, 2021·22 pages·📄 Original PDF (city portal)
General Information Attestation Curb Cut 125504 Submitted On: Jun 07, 2021 Applicant James Rafferty [phone removed] [email removed] Location 600 Main St Cambridge, MA 02139 Frontage (in feet) see attached Setback - distance from building to sidewalk (in feet) 4 Distance from proposed driveway to surrounding structures and property line (in feet) 0 Length of proposed driveway (in feet) 4 Width of proposed driveway (in feet) 33 Size of proposed driveway (square feet) 132 Location of any trees, sign posts, fire hydrants, utility poles, etc., in direct vicinity of proposed driveway see attached plan Full Name James J. Rafferty Date 06/07/2021 Page 1 of 1 6/16/2021 https://cambridgema.viewpointcloud.io/
OFFICE OF THE CITY CLERK CITY OF CAMBRIDGE [phone removed] FAX [phone removed] ANTHONY I. WILSON PAULA M. CRANE CITY CLERK DEPUTY CITY CLERK CITY HALL, 795 MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS 02139 Dear Neighborhood Representative: This office is in receipt of a copy of an application from: The City Council has directed that all curb cut petitions be submitted to the appropriate Neighborhood Associations for the locality where the curb cut would be made, so that the association may have an opportunity for review, prior to action by the City Council. Please indicate by return mail your approval or disapproval of the petition within twenty-one days from the date of this letter. If the response is "disapproval" please state reasons. Be sure to sign the form and include a daytime phone number. I have enclosed a self-addressed stamped envelope to facilitate your reply. As soon as this office has received both the completed application and your neighborhood association response, I will place the petition on the agenda for the next City Council meeting. If I do not receive a response from your neighborhood organization by twenty-one days from the date of this letter, I will place the petition on the agenda for the next City Council meeting. If your neighborhood association cannot complete its review by twenty-one days from today, you may extend the reply time another seven days by requesting an extension by letter to me with a copy to the petitioner. However, I urge you to make every effort to complete your review as soon as possible. Thank you for your cooperation. Sincerely yours, Anthony I. Wilson City Clerk hereby _______ approve _______ disapprove of said driveway petition. Comments: ____________________________________________________________________ Signature of authorized association representative Daytime telephone no. cc: Petitioner June 16, 2021 James J. Rafferty for curb cuts for The Ragon Institute at 600-624 Main Street. One 33' wide curb cut for a loading dock, one 24' wide curb cut for a below-grade parking garage, both located on Albany Street. Area Four Neighborhood Coalition Julian Cassa, Liz Layton,Jean Cummings, Laurie Friedman, Arleen Henry, Jonathan King, Nancy Ryan,D RESET PRINT
CITY OF CAMBRIDGE APPLICATION FOR DRIVEWAY CUTS AND OPENINGS ABUTTOR'S FORM To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners including property owners directly across the street (may be more than one). If the abutting buildings are condominiums then all condominium owners must sign. 600-624 Main Street 608-616 Main Street X MIT 650 Main Street LLC, by its manager, MIT Cambridge Real Estate LLC, Patrick Rowe, Officer and not individually One Broadway, 9th Floor, Suite 200, Cambridge, MA 02142 DocuSign Envelope ID: E6264E6C-1553-461E-87AA-DDE2F38A4030 5/28/2021
CITY OF CAMBRIDGE APPLICATION FOR DRIVEWAY CUTS AND OPENINGS ABUTTOR'S FORM To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners including property owners directly across the street (may be more than one). If the abutting buildings are condominiums then all condominium owners must sign. 600-624 Main Street 545, 565 and 575 Technology Square MIT Real Estate, LLC, by its manager, MIT Cambridge Real Estate LLC, Patrick Rowe, Officer and not individually One Broadway, 9th Floor, Suite 200, Cambridge, MA 02142 X DocuSign Envelope ID: 756422C0-932F-4651-998F-99A032B0E9E2 6/3/2021
CITY OF CAMBRIDGE APPLICATION FOR DRIVEWAY CUTS AND OPENINGS ABUTTOR'S FORM To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: To Whom It May Concern: As owner or agent of Cambridge, Massachusetts, I do hereby declare approval disapproval of installment of Off-Street Parking Facility located at: Signed: Date: Address: Applicants must submit a copy of the assessor's plat and signatures from all abutting property owners including property owners directly across the street (may be more than one). If the abutting buildings are condominiums then all condominium owners must sign. 600-624 Main Street 36 and 38-50 Albany Street X Massachusetts Institute of Technology 77 Massachusetts Ave, Building NE49-4000, Cambridge, MA 02139 DocuSign Envelope ID: 76F71E37-B91D-4F7C-ADE6-642C577C92E9 5/19/2021 | 3:32:47 PM EDT
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-TOC-1 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL TABLE OF CONTENTS VOLUME ONE - NARRATIVE MATERIALS VOLUME TWO (PART A) - GRAPHIC MATERIALS SITE AND CONTEXT INFORMATION EXISTING CONDITIONS PLAN A-2 EXISTING CONDITIONS PHOTOGRAPHS A-3 SITE CONTEXT PLAN A-5 ZONING MAP A-6 K2C2 STUDY AREA A-7 EXISTING SITE BOUNDARY A-8 ZONING ANALYSIS ZONING ANALYSIS - HEIGHT LIMITS A-9 ZONING ANALYSIS - BULK CONTROL PLANE A-10 BUILDING MASSING A-11 RENDERINGS AERIAL VIEW - LOOKING SOUTHWEST A-12 AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED) A-13 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST A-14 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED) A-15 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST A-16 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED) A-17 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH A-18 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19 VIEW FROM MAIN ST - LOOKING SOUTH A-20 VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED) A-21 AERIAL VIEW - LOOKING SOUTHEAST A-22 AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED) A-23 VIEW FROM MAIN ST - LOOKING WEST A-24 VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED) A-25 VIEW FROM ALBANY STREET - LOOKING NORTH A-26 VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED) A-27 VIEW FROM ALBANY STREET - LOOKING NORTHEAST A-28 VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED) A-29 VIEW OF ALBANY ENTRANCE - LOOKING NORTH A-30 VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED) A-31 VIEW OF PARKING ENTRANCE - LOOKING NORTH A-32 VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED) A-33 FLOOR PLANS GROUND LEVEL PLAN A-34 MECHANICAL PLATFORM PLAN A-35 SECOND LEVEL PLAN A-36 THIRD LEVEL PLAN A-37 FOURTH LEVEL PLAN A-38 FIFTH LEVEL PLAN A-39 MECHANICAL LEVEL PLAN A-40 ROOF LEVEL PLAN A-41 ROOF LEVEL PLAN (GREEN ROOF AREA CALCULATION) A-41A GARAGE LEVEL ONE PLAN A-42 GARAGE LEVEL TWO PLAN A-43 LONG-TERM BICYCLE PARKING PLAN A-44 SECTIONS AND ELEVATIONS BUILDING SECTIONS A-45 ATRIUM SECTION A-47 STREETWALL ELEVATION A-48 MAIN STREET ELEVATION A-49 PORTLAND STREET ELEVATION A-50 ALBANY STREET ELEVATION A-51 CONCEPT MODEL A-52 EXTERIOR ELEVATION WALL TYPES A-53 DETAILED MAIN STREET ELEVATION A-54 DETAILED ATRIUM ELEVATIONS A-55 DETAILED PORTLAND STREET ELEVATION A-56 DETAILED ALBANY STREET ELEVATION A-57 PROPOSED WALL ASSEMBLY A-58 PROPOSED MATERIALS A-59 VOLUME TWO (PART B) - GRAPHIC MATERIALS STREET SECTIONS MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING) B-61 MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED) B-62 MAIN STREET SECTION AT OCULUS B-63 MAIN STREET SECTION AT COLLOQUIUM ROOM B-64 PORTLAND STREET SECTION AT BUILDING ENTRANCE B-65 PORTLAND STREET SECTION AT CHILD CARE GARDEN B-66 TYPICAL ALBANY STREET SECTION B-67 LANDSCAPE DESIGN OVERALL SITE PLAN B-68 PROPOSED CURB CUTS B-69 OPEN SPACE / PERMEABLE SPACE PLAN B-70 PROPOSED OVERALL TREE PLAN B-71 TREE PROTECTION PLAN B-72 OVERALL MATERIALS PLAN B-73 OVERALL LAYOUT PLAN B-74 OVERALL GRADING PLAN B-75 OVERALL PLANTING PLAN B-76 LINEAR PARK / OCULUS PLAZA MATERIALS PLAN B-77 LINEAR PARK / OCULUS PLAZA PLANTING PLAN B-78 RENDERING OF LINEAR PARK B-79 RENDERING OF OCULUS PLAZA B-80 RAGON PLAZA / URBAN GROVE MATERIALS PLAN B-81 RAGON PLAZA / URBAN GROVE PLANTING PLAN B-82 RENDERING OF URBAN GROVE B-83 RENDERING OF RAGON PLAZA B-84 EVENING RENDERING OF RAGON PLAZA 8-85 SECOND LEVEL TERRACE GARDEN PLAN B-86 SECOND LEVEL TERRACE GARDEN PLAN RENDERING B-87 ROOF LEVEL GREEN ROOF PLAN B-88 PLAYGROUND SITE CONTEXT B-89 PLAYGROUND EQUIPMENT B-90 PLAYGROUND SURFACING B-91 PLAYGROUND GRADING B-92 PLAYGROUND PLANTING B-93 SHADOW STUDIES (MARCH & JUNE) B-94 SHADOW STUDIES (SEPTEMBER & DECEMBER) B-95 SHADOW STUDIES - NET NEW SHADOWS LASTING B-96 LONGER THAN 2 HOURS UTILITIES AND INFRASTRUCTURE EXISTING CONDITIONS PLAN B-97 EXISTING DOMESTIC WATER PLAN B-98 PROPOSED DOMESTIC WATER PLAN B-99 EXISTING STORM DRAIN PLAN B-100 PROPOSED STORM DRAIN PLAN B-101 EXISTING SEWER PLAN B-102 PROPOSED SEWER PLAN B-103 VOLUME THREE - TRANSPORTATION IMPACT STUDY Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-9 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ZONING ANALYSIS - HEIGHT LIMITS Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-10 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ZONING ANALYSIS - BULK CONTROL PLANE Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-11 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL BUILDING MASSING Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-12 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL AERIAL VIEW LOOKING SOUTHWEST Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-13 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL AERIAL VIEW LOOKING SOUTHWEST (TREES REMOVED) Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-41 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ROOF LEVEL PLAN Available Green Roof Area 25,036 sf Required Green Roof Area 20,028 sf Proposed Green Roof Area 20,145sf Green Roof Coverage 80.45% Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 B-104 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ROOF LEVEL PLAN A-41A ROOF LEVEL PLAN - GREEN ROOF CALCULATION Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 B-TOC-1 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL TABLE OF CONTENTS VOLUME ONE - NARRATIVE MATERIALS VOLUME TWO (PART A) - GRAPHIC MATERIALS SITE AND CONTEXT INFORMATION EXISTING CONDITIONS PLAN A-2 EXISTING CONDITIONS PHOTOGRAPHS A-3 SITE CONTEXT PLAN A-5 ZONING MAP A-6 K2C2 STUDY AREA A-7 EXISTING SITE BOUNDARY A-8 ZONING ANALYSIS ZONING ANALYSIS - HEIGHT LIMITS A-9 ZONING ANALYSIS - BULK CONTROL PLANE A-10 BUILDING MASSING A-11 RENDERINGS AERIAL VIEW - LOOKING SOUTHWEST A-12 AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED) A-13 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST A-14 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED) A-15 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST A-16 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED) A-17 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH A-18 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19 VIEW FROM MAIN ST - LOOKING SOUTH A-20 VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED) A-21 AERIAL VIEW - LOOKING SOUTHEAST A-22 AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED) A-23 VIEW FROM MAIN ST - LOOKING WEST A-24 VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED) A-25 VIEW FROM ALBANY STREET - LOOKING NORTH A-26 VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED) A-27 VIEW FROM ALBANY STREET - LOOKING NORTHEAST A-28 VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED) A-29 VIEW OF ALBANY ENTRANCE - LOOKING NORTH A-30 VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED) A-31 VIEW OF PARKING ENTRANCE - LOOKING NORTH A-32 VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED) A-33 FLOOR PLANS GROUND LEVEL PLAN A-34 MECHANICAL PLATFORM PLAN A-35 SECOND LEVEL PLAN A-36 THIRD LEVEL PLAN A-37 FOURTH LEVEL PLAN A-38 FIFTH LEVEL PLAN A-39 MECHANICAL LEVEL PLAN A-40 ROOF LEVEL PLAN A-41 ROOF LEVEL PLAN (GREEN ROOF CALCULATION) A-41A GARAGE LEVEL ONE PLAN A-42 GARAGE LEVEL TWO PLAN A-43 LONG-TERM BICYCLE PARKING PLAN A-44 SECTIONS AND ELEVATIONS BUILDING SECTIONS A-45 ATRIUM SECTION A-47 STREETWALL ELEVATION A-48 MAIN STREET ELEVATION A-49 PORTLAND STREET ELEVATION A-50 ALBANY STREET ELEVATION A-51 CONCEPT MODEL A-52 EXTERIOR ELEVATION WALL TYPES A-53 DETAILED MAIN STREET ELEVATION A-54 DETAILED ATRIUM ELEVATIONS A-55 DETAILED PORTLAND STREET ELEVATION A-56 DETAILED ALBANY STREET ELEVATION A-57 PROPOSED WALL ASSEMBLY A-58 PROPOSED MATERIALS A-59 VOLUME TWO (PART B) - GRAPHIC MATERIALS STREET SECTIONS MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING) B-61 MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED) B-62 MAIN STREET SECTION AT OCULUS B-63 MAIN STREET SECTION AT COLLOQUIUM ROOM B-64 PORTLAND STREET SECTION AT BUILDING ENTRANCE B-65 PORTLAND STREET SECTION AT CHILD CARE GARDEN B-66 TYPICAL ALBANY STREET SECTION B-67 LANDSCAPE DESIGN OVERALL SITE PLAN B-68 PROPOSED CURB CUTS B-69 OPEN SPACE / PERMEABLE SPACE PLAN B-70 PROPOSED OVERALL TREE PLAN B-71 TREE PROTECTION PLAN B-72 OVERALL MATERIALS PLAN B-73 OVERALL LAYOUT PLAN B-74 OVERALL GRADING PLAN B-75 OVERALL PLANTING PLAN B-76 LINEAR PARK / OCULUS PLAZA MATERIALS PLAN B-77 LINEAR PARK / OCULUS PLAZA PLANTING PLAN B-78 RENDERING OF LINEAR PARK B-79 RENDERING OF OCULUS PLAZA B-80 RAGON PLAZA / URBAN GROVE MATERIALS PLAN B-81 RAGON PLAZA / URBAN GROVE PLANTING PLAN B-82 RENDERING OF URBAN GROVE B-83 RENDERING OF RAGON PLAZA B-84 EVENING RENDERING OF RAGON PLAZA B-85 SECOND LEVEL TERRACE GARDEN PLAN B-86 SECOND LEVEL TERRACE GARDEN PLAN RENDERING B-87 ROOF LEVEL GREEN ROOF PLAN B-88 PLAYGROUND SITE CONTEXT B-89 PLAYGROUND EQUIPMENT B-90 PLAYGROUND SURFACING B-91 PLAYGROUND GRADING B-92 PLAYGROUND PLANTING B-93 SHADOW STUDIES (MARCH & JUNE) B-94 SHADOW STUDIES (SEPTEMBER & DECEMBER) B-95 SHADOW STUDIES - NET NEW SHADOWS LASTING B-96 LONGER THAN 2 HOURS UTILITIES AND INFRASTRUCTURE EXISTING CONDITIONS PLAN B-97 EXISTING DOMESTIC WATER PLAN B-98 PROPOSED DOMESTIC WATER PLAN B-99 EXISTING STORM DRAIN PLAN B-100 PROPOSED STORM DRAIN PLAN B-101 EXISTING SEWER PLAN B-102 PROPOSED SEWER PLAN B-103 VOLUME THREE - TRANSPORTATION IMPACT STUDY Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 B-69 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL PROPOSED CURB CUTS Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 B-88 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ROOF LEVEL GREEN ROOF PLAN Article 19 Application for Special Permit May 25, 2021
I .,, I I I • • •
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-TOC-1 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL TABLE OF CONTENTS VOLUME ONE - NARRATIVE MATERIALS VOLUME TWO (PART A) - GRAPHIC MATERIALS SITE AND CONTEXT INFORMATION EXISTING CONDITIONS PLAN A-2 EXISTING CONDITIONS PHOTOGRAPHS A-3 SITE CONTEXT PLAN A-5 ZONING MAP A-6 K2C2 STUDY AREA A-7 EXISTING SITE BOUNDARY A-8 ZONING ANALYSIS ZONING ANALYSIS - HEIGHT LIMITS A-9 ZONING ANALYSIS - BULK CONTROL PLANE A-10 BUILDING MASSING A-11 RENDERINGS AERIAL VIEW - LOOKING SOUTHWEST A-12 AERIAL VIEW - LOOKING SOUTHWEST (TREES REMOVED) A-13 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST A-14 VIEW FROM MAIN ST (NORTH SIDE) - LOOKING WEST (TREES REMOVED) A-15 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST A-16 VIEW FROM MAIN ST (SOUTH SIDE) - LOOKING WEST (TREES REMOVED) A-17 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH A-18 VIEW FROM TECHNOLOGY SQUARE - LOOKING SOUTH (TREES REMOVED) A-19 VIEW FROM MAIN ST - LOOKING SOUTH A-20 VIEW FROM MAIN ST - LOOKING SOUTH (TREES REMOVED) A-21 AERIAL VIEW - LOOKING SOUTHEAST A-22 AERIAL VIEW - LOOKING SOUTHEAST (TREES REMOVED) A-23 VIEW FROM MAIN ST - LOOKING WEST A-24 VIEW FROM MAIN ST - LOOKING WEST (TREES REMOVED) A-25 VIEW FROM ALBANY STREET - LOOKING NORTH A-26 VIEW FROM ALBANY STREET - LOOKING NORTH (TREES REMOVED) A-27 VIEW FROM ALBANY STREET - LOOKING NORTHEAST A-28 VIEW FROM ALBANY STREET - LOOKING NORTHEAST (TREES REMOVED) A-29 VIEW OF ALBANY ENTRANCE - LOOKING NORTH A-30 VIEW OF ALBANY ENTRANCE - LOOKING NORTH (TREES REMOVED) A-31 VIEW OF PARKING ENTRANCE - LOOKING NORTH A-32 VIEW OF PARKING ENTRANCE - LOOKING NORTH (TREES REMOVED) A-33 FLOOR PLANS GROUND LEVEL PLAN A-34 MECHANICAL PLATFORM PLAN A-35 SECOND LEVEL PLAN A-36 THIRD LEVEL PLAN A-37 FOURTH LEVEL PLAN A-38 FIFTH LEVEL PLAN A-39 MECHANICAL LEVEL PLAN A-40 ROOF LEVEL PLAN A-41 ROOF LEVEL PLAN (GREEN ROOF AREA CALCULATION) A-41A GARAGE LEVEL ONE PLAN A-42 GARAGE LEVEL TWO PLAN A-43 LONG-TERM BICYCLE PARKING PLAN A-44 SECTIONS AND ELEVATIONS BUILDING SECTIONS A-45 ATRIUM SECTION A-47 STREETWALL ELEVATION A-48 MAIN STREET ELEVATION A-49 PORTLAND STREET ELEVATION A-50 ALBANY STREET ELEVATION A-51 CONCEPT MODEL A-52 EXTERIOR ELEVATION WALL TYPES A-53 DETAILED MAIN STREET ELEVATION A-54 DETAILED ATRIUM ELEVATIONS A-55 DETAILED PORTLAND STREET ELEVATION A-56 DETAILED ALBANY STREET ELEVATION A-57 PROPOSED WALL ASSEMBLY A-58 PROPOSED MATERIALS A-59 VOLUME TWO (PART B) - GRAPHIC MATERIALS STREET SECTIONS MAIN STREET SECTION AT SEMINAR GARDEN (EXISTING) B-61 MAIN STREET SECTION AT SEMINAR GARDEN (PROPOSED) B-62 MAIN STREET SECTION AT OCULUS B-63 MAIN STREET SECTION AT COLLOQUIUM ROOM B-64 PORTLAND STREET SECTION AT BUILDING ENTRANCE B-65 PORTLAND STREET SECTION AT CHILD CARE GARDEN B-66 TYPICAL ALBANY STREET SECTION B-67 LANDSCAPE DESIGN OVERALL SITE PLAN B-68 PROPOSED CURB CUTS B-69 OPEN SPACE / PERMEABLE SPACE PLAN B-70 PROPOSED OVERALL TREE PLAN B-71 TREE PROTECTION PLAN B-72 OVERALL MATERIALS PLAN B-73 OVERALL LAYOUT PLAN B-74 OVERALL GRADING PLAN B-75 OVERALL PLANTING PLAN B-76 LINEAR PARK / OCULUS PLAZA MATERIALS PLAN B-77 LINEAR PARK / OCULUS PLAZA PLANTING PLAN B-78 RENDERING OF LINEAR PARK B-79 RENDERING OF OCULUS PLAZA B-80 RAGON PLAZA / URBAN GROVE MATERIALS PLAN B-81 RAGON PLAZA / URBAN GROVE PLANTING PLAN B-82 RENDERING OF URBAN GROVE B-83 RENDERING OF RAGON PLAZA B-84 EVENING RENDERING OF RAGON PLAZA 8-85 SECOND LEVEL TERRACE GARDEN PLAN B-86 SECOND LEVEL TERRACE GARDEN PLAN RENDERING B-87 ROOF LEVEL GREEN ROOF PLAN B-88 PLAYGROUND SITE CONTEXT B-89 PLAYGROUND EQUIPMENT B-90 PLAYGROUND SURFACING B-91 PLAYGROUND GRADING B-92 PLAYGROUND PLANTING B-93 SHADOW STUDIES (MARCH & JUNE) B-94 SHADOW STUDIES (SEPTEMBER & DECEMBER) B-95 SHADOW STUDIES - NET NEW SHADOWS LASTING B-96 LONGER THAN 2 HOURS UTILITIES AND INFRASTRUCTURE EXISTING CONDITIONS PLAN B-97 EXISTING DOMESTIC WATER PLAN B-98 PROPOSED DOMESTIC WATER PLAN B-99 EXISTING STORM DRAIN PLAN B-100 PROPOSED STORM DRAIN PLAN B-101 EXISTING SEWER PLAN B-102 PROPOSED SEWER PLAN B-103 VOLUME THREE - TRANSPORTATION IMPACT STUDY Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-9 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ZONING ANALYSIS - HEIGHT LIMITS Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-10 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL ZONING ANALYSIS - BULK CONTROL PLANE Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-11 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL BUILDING MASSING Article 19 Application for Special Permit May 25, 2021
Article 19 Application for Special Permit April 20, 2021 Ragon Institute 2.0 A-12 RAGON INSTITUTE 2.0 MASSACHUSETTS GENERAL HOSPITAL AERIAL VIEW LOOKING SOUTHWEST Article 19 Application for Special Permit May 25, 2021