Banner Permit
Applicants Name: HERITHGE FLAG CO.
Address:
100 FRANKLIN ST ALISTON MA
Organization or Business Represented: DRAPER LABORATORY
Pole locations: Street and pole numbers attach separate sheet if necessary:
SUE ATTACHED
Type Logo, Wording, Insignia:
SEE ATTACHED
Date of attachment:
60/5/2023 Date oF removal: 7/7/2023
Contact Person:
Amy MACDONALD
Telephone:
[phone removed]
Cell phone:
SAME
Email:
Amy @ HERITAGEFLAG.cOM
Attachments to Poles:
1. Attachments shall be made with proper hardware and shall only be attached with
non-corrosive metal clamps or brackets.
2. Banners attached to poles shall not exceed a total of 1800 square inches,
approximately 18 inches x 48 inches, 24 inches x 36 inches, 24 inches x 48,
or 30 inches x 60 inches. The actual size is subject to required clearances.
3. Banners cannot be attached to wood utility poles.
4. Banners shall have a minimum clearance of:
a. 16 feet over a roadway
b. 12 feet over a sidewalk
5. Banners shall not interfere with or obstruct, or otherwise block any roadway
signs, lighting, or traffic signals.
6. The City reserves the right to remove, or order to be removed any banner deemed
unsafe, not properly installed, or creating a hazard and the applicant may be
subject to costs.
7. An applicant must provide a description of the materials the banner is made of,
method of attachment, and means of installation (contractor name and contact
information).
Approved by: grann
Date: 5/10/23
HERITAGE
G
A
To: The Cambridge City Council
May 9, 2023
Honorable Councilors,
On behalf of Draper Laboratory, I would like to request permission for a light pole banner
program to promote Draper's 50th anniversary. We would like the banners to be installed
from June 5, 2023 to July 7, 2023.
We request permission to have the banners on poles in the vicinity of Draper. The pole numbers
are as follows:
BROADWAY: 36 poles
16, 18, 20, 22, 23, 24, 25, 26, 27, 28, 28.5, 29, 29.5, 32, 33, 34, 35, 36, 37, 38, 39, 28 pales
M3, NA, M18, M9, N2, Mу6, M17, NJ78, M21, M22, M26, M30, M32, M43, M47
PORTLAND ST.: 9 poles
9, 5, 7, 7.5, ?, 9, зд, 11, гр
5 poles
10 poles
The proposed designs are attached.
Thank you for your consideration,
Amy Macdonald
President
Heritage Flag Co., Inc.
c) [phone removed]
[email removed]
HERITAGE FLAG CO., INC - 100 FRANKLIN ST. - ALLSTON - MA - 02134
DRAPER LABORATORY
69 pole banner program
Light pole numbers
?= Poles with no visible number
BROADWAY: 36 poles
16, 18, 20, 22, 23, 24, 25, 26, 27, 28, 28.5, 29, 29.5, 32, 33, 34, 35, 36, 37, 38, 39, 28 poles
M3, M4, M8, M9, M72, M16, M17, M18, M21, M22, M26, M30, M32, M43, M47
PORTLAND ST.: 9 poles
A. 5, 7,7.5, 3. 9, 10, 11, 12 5 poles
MAIN ST.: 24 poles
M25, M63, M90, 36, 37, 38, 39, 40, 43, 44, ?, ?, 47.5, 48, 51, 52, 53,2. 2, 56, 57, 2, 58, 60
l0 poles
DRAPer
INSPIRE | INNOVATE | IMPACT
50
50 Years
of Outstanding Innovations
and Service to the Nation
DRAPER®
INSPIRE | INNOVATE IMPACT
50 Years
of Outstanding Innovations
and Service to the Nation
50
A
DRAPER®
INSPIRE | INNOVATE | IMPACT
50 Years
of Outstanding Innovations
and Service to the Nation
* 80/0.30
LEICA
50
BER
DRAPER
INSPIRE | INNOVATE | IMPACT
50 Years
of Outstanding Innovations
and Service to the Nation