CITY OF CAMBRIDGE
HAZARD MITIGATION PLAN 2015 UPDATE
MEDFORD 1
EVERETT
HELMON
SOMERVILLE
MAPC
METROPOLITAN AREA PLANNING COUNCIL
Metropolitan Area Planning Council
Final Plan
FEMA Approval Pending Adoption
March 11, 2016
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
ACKNOWLEDGEMENTS AND CREDITS
This plan was prepared for the City of Cambridge by the Metropolitan Area Planning
Council (MAPC) under the direction of the Massachusetts Emergency Management Agency
(MEMA) and the Massachusetts Department of Conservation and Recreation (DCR). The
plan was funded by the Federal Emergency Management Agency's (FEMA) Pre-Disaster
Mitigation (PDM) Grant Program.
MAPC Officers
President:
Lynn Duncan
Vice President:
Keith Bergman
Shironda Almeida
Secretary:
Treasurer:
Taber Keally
Executive Director:
Marc. D. Draisen
Credits
Project Manager:
Martin Pillsbury
Lead Proiect Planner:..
Barry Keppard
Susan Brunton
Mapping/GIS Services:
Bill Wong, Rebecca Schofield
Massachusetts Emergency Management Agency
Director:
Kurt Schwartz
Department of Conservation and Recreation
Commissioner:
Leo Roy
(continued next page)
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
Cambridge Hazard Mitigation Plan Update Steering Commiftee
Lisa Peterson
Deputy City Manager
Brian Gover
Local Emergency Planning Committee / Fire Department
Gerard Mahoney
Emergency Planning and Coordination / Fire Department
Police Department
Joseph Wilson
Department of Public Works
Owen O'Riordan
John Nardone
Department of Public Works
Community Development Department
John Bolduc
Sam Lipson
Public Health Department
Public Health Department
Lynn Schoeff
Steve Lenkauskas
Electrical Department
Inspectional Services Department
Mike Nicoloro
Jennifer LeTourneau
Conservation Commission
Sam Corda
Cambridge Water Department
Bill Van Schalkwyk
Massachusetts Institute of Technology
Nick Hambridge
Harvard University
:
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
1. EXECUTIVE SUMMARY
Hazard Mitigation planning is a proactive effort to identify actions that can be taken to
reduce the dangers to life and property from natural hazard events. In the communities of
the Boston region of Massachusetts, hazard mitigation planning tends to focus most on
flooding, the most likely natural hazard to impact these communities. The Federal Disaster
Mitigation Act of 2000 requires all municipalities that wish to be eligible to receive FEMA
funding for hazard mitigation grants, to adopt a local multi-hazard mitigation plan and
update this plan in five year intervals.
PLANNING PROCESS
Planning for the Cambridge Hazard Mitigation Plan update was led by the Cambridge
Local Hazard Mitigation Planning Committee, composed of staff from a number of
different City Departments. This committee discussed where the impacts of natural hazards
most affect the City, goals for addressing these impacts, and hazard mitigation measures
that would benefit the City.
Public participation in this planning process is important for improving awareness of the
potential impacts of natural hazards and to build support for the actions the City takes to
mitigate them. The City hosted public meetings two times during the process with the two
meetings occurring January 9, 2013 and January 10, 2013 and a third meeting that
occurred March 18, 2014. The draft plan was then posted on the City's website for public
review.
RISK ASSESSMENT
The Cambridge Hazard Mitigation Plan assesses the potential impacts to the City from
flooding, high winds, winter storms, brush fire, and geologic hazards. Flooding, driven by
hurricanes, northeasters, and other storms, clearly presents the greatest hazard to the City,
most especially in locations that are low-lying or where drainage and conveyance systems
can be overwhelmed during storm events with significant precipitation.
The Cambridge Local Committee identified those areas where flooding most frequently
occurs, comprising 17% of the City's land area, and over 3,100 building structures worth
an estimated $907,000,000.
HAZARD MITIGATION GOALS
1. Goal: Protect the health and safety of the public.
• Encourage people to be prepared before, during and after a hazard event.
• Identify at-risk populations and keep up to date list of locations
• Ensure that services related to public health can function during and after a
hazard, e.g., sanitation, water, debris removal, hospitals, and emergency services.
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
• Ensure that evacuation can happen in an organized and efficient manner.
• Minimize secondary impacts from hazards, such as the release of pollutants.
2. Goal: Protect existing properties and structures.
• Provide resources for residents and businesses to make their buildings and
properties more disaster resistant.
• Educate the public on measures they can take to protect their property.
• Maintain existing mitigation structures.
Ensure that future development / redevelopment does not make existing
properties more vulnerable to hazards.
Ensure that critical facilities are protected from hazards.
• Complete separation of combined sewers
3. Goal: Ensure that essential services can function during and after a hazard event.
Ensure that critical infrastructure is protected from natural hazards.
• Ensure that people (key service providers and employees) can get into the city to
provide services.
• Build resiliency into the system for faster recovery, e.g., electricity distribution
system.
4. Goal: Avoid chaos and confusion with good communication.
• Have an effective communication plan.
Perform outreach to non-English speakers and other vulnerable populations
before, during and after hazard events
• Coordinate efforts with the private sector and institutions and with neighboring
communities.
5. Goal: Work regionally to mitigate impacts from natural hazards and to respond and
recover from hazard events.
• Continue to participate in regional efforts.
• Cooperate with other agencies, communities, and private entities.
• Understand priorities and capabilities of other entities to allow for resource-
sharing, mutual aid, and entering into memoranda of understanding (MOU).
6. Goal: Determine priorities for directing resources for hazard mitigation and response.
Prioritize mitigation projects.
2
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
• Continue to program mitigation projects in the 5 and 10 year CIP.
• Pursue various funding sources.
Encourage private property-owners to implement measures to protect their own
property.
7. Protect natural resources
Identify mitigation strategies that preserve or restore the function of natural
systems.
Protect indigenous wetland areas, undeveloped floodplains and other natural
features that provide mitigation of natural hazards.
Introduce green infrastructure elements, where possible, to reduce impervious
surfaces and introduce natural systems.
8. Create capacity to monitor existing changes
• Identify and understand how climate change many alter where and how the City is
vulnerable to natural hazards.
• Review and update current mitigation activities to anticipate future changes in
vulnerabilities.
• Review and update current emergency preparedness and response activities to
anticipate future changes in vulnerabilities.
HAZARD MITIGATION STRATEGY
The Cambridge Local Committee identified a number of mitigation measures that would
serve to reduce the City's vulnerability to natural hazard events. A primary focus of the
measures was maintaining and improving the integrity of the drainage system through
addressing maintenance and reconstruction issues. A secondary emphasis is on boosting the
general emergency planning capabilities of the City so that both hazard mitigation and
emergency management can be handled efficiently and effectively. Lastly, the City has
included a set of measures that are aimed at identifying and addressing how
vulnerabilities to natural hazards may change due to Climate Change.
Overall, the hazard mitigation strategy recognizes that mitigating hazards for Cambridge
will be an ongoing process as our understanding of natural hazards and the steps that can
be taken to mitigate their damages changes over time. The Hazard Mitigation Strategy
will be incorporated into other related plans and policies.
3
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
PLAN REVIEW AND UPDATE PROCESS
Table 1 Plan Review and Update
Reviews and Updates
Chapter
I|I - Public
The Cambridge Local Committee emphasized public participation for
Participation
the update of the Hazard Mitigation Plan, discussing strategies to
enhance participation opportunities at the first local committee
meeting. During plan development, the plan was discussed at public
meetings hosted by the Local Emergency Planning Committee and the
Climate Protection Action Committee. Both meetings were publicized.
The plan was also made available on the City's website for public
comment.
IV - Risk
MAPC gathered the most recently available hazard and land use
data and met with City staff to identify changes in local hazard areas
Assessment
and development trends. City staff reviewed critical infrastructure with
MAPC staff in order to create an up-to-date list. MAPC also used the
most recently available version of HAZUS and assessed the potential
impacts of flooding using the latest data.
V - Goals
The Hazard Mitigation Goals were reviewed, updated, and endorsed
by the Local Hazard Mitigation Committee.
The list of existing mitigation measures was updated to reflect current
VI - Existing
Mitigation
mitigation activities in the City.
Measures
Mitigation measures from the 2008 plan were reviewed and assessed
VII & VIII -
Hazard
as to whether they were completed, on-going, or deferred. The Local
Committee determined whether to carry forward measures into the
Mitigation
2014 plan or delete them. The 2014 Hazard Mitigation Strategy
Strategy
reflects both new measures and measures carried forward from the
2008 plan. The Committee prioritized the new set of measures based
on current conditions.
IX - Plan
This section of the plan was updated with a new on-going plan
implementation review and five year update process that will assist
Adoption &
Maintenance
the City in incorporating hazard mitigation issues into other City
planning and regulatory review processes and better prepare the
City to update the plan in 2019.
As indicated on Table 22, Cambridge has made significant progress on advancing and
implementing mitigation measures from the 2008 Hazard Mitigation Plan. Many measures
identified in that plan were completed, such as construction of numerous projects to
address drainage issues related to Combined Sewer Overflows, and others have seen
Read by machine, not yet checked by a person · check this page against the original
CITY OF CAMBRIDGE HAZARD MITIGATION PLAN 2015 UPDATE
major progress, such as having 40% of the city undergo hydraulic modeling. There are
measures that still require action and that will require additional capital, equipment, and
manpower. Moving forward into the next five year implementation period, there will be
many more opportunities to incorporate hazard mitigation into the City's decision making
processes, especially as Cambridge completes its Climate Change Vulnerability
Assessment and Preparedness Plan.