Search ▸ Agenda item attachment
Fossil Fuel Free Demonstration Pilot CHARTER RIGHT EXERCISED BY COUNCILLOR ZONDERVAN IN COUNCIL JUNE 12, 2023
O-2
Calendar Item # 1
FIRST IN COUNCIL
June 12, 2023
June 26, 2023
City of Cambridge
COUNCILLOR ZONDERVAN
COUNCILLOR NOLAN
WHEREAS:
DOER has released their application process and model language for the fossil
fuel free construction pilot; and
WHEREAS:
A prerequisite of admission to the 10 communities pilot is the adoption of local
regulation and DOER recommends this be done through regular ordinance;
and
WHEREAS:
The deadline to apply for the State’s Fossil Fuel Free Demonstration Program
is September 1, 2023; and
WHEREAS:
The attached language is based on the model language provided by DOER;
now therefore be it
ORDERED:
That the Code of Ordinances be amended by adding the attached new
chapter.
Chapter 15.30 FOSSIL FUEL-FREE DEMONSTRATION
§ 15.30.10 Definitions
Fossil Fuel-Free Demonstration – Codified by the entirety of 225 CMR 24.00, the Fossil
FuelFree Demonstration
Specialized Energy Code – Codified by the entirety of 225 CMR 22 and 23 including
Appendices RC and CC, the Specialized Energy Code adds residential and commercial
appendices to the Massachusetts Stretch Energy Code, based on amendments to the
respective net-zero appendices of the International Energy Conservation Code (IECC) to
incorporate the energy efficiency of the Stretch energy code and further reduce the climate
impacts of buildings built to this code, with the goal of achieving net-zero greenhouse gas
emissions from the buildings sector no later than 2050.
§ 15.30.20 Purpose
The purpose of 15.30, also referred to as the Fossil Fuel-Free Demonstration is to restrict and
prohibit new building construction and major renovation projects that are not fossil fuel-free.
§ 15.30.30 Applicability
This restriction applies to residential and commercial buildings that qualify as new construction
or major renovation, as defined in 225 CMR 24.00 –. This restriction shall not apply to research
laboratories for scientific or medical research, hospitals and medical offices regulated by the
department of public health as a health care facility as defined in 225 CMR 24.00 –.
§ 15.30.40 Fossil Fuel-Free Demonstration
The Fossil Fuel-Free Demonstration, as codified by the entirety of 225 CMR 24.00, is herein
incorporated by reference into the City of Cambridge Code of Ordinances, Chapter 15 with an
effective date of January 1, 2024.
With adoption of the Fossil Fuel-Free Demonstration, and upon approval by DOER, the
following amendments to the Specialized Energy Code are adopted. These changes are
enforceable by the Inspectional Services Department and will go into effect for any project
seeking a Building Permit after the effective date.
a. Low-rise Residential Code (225 CMR 22 Appendix RC)
1. Sections RC102 and RC101 “Zero Energy Pathway” and “Mixed Fuel
Pathway” shall not be permitted for use for new construction or major
renovations.
b. Commercial and All Other (225 CMR 23 Appendix CC)
i. Sections CC103 and CC105 “Zero Energy Pathway” and “Mixed-Fuel Pathway”
shall not be permitted for new construction or major renovations, with the
following exceptions:
1. Research laboratories for scientific or medical research,
2. Hospitals regulated by the department of public health as a health
care facility,
3. Medical offices regulated by the department of public health as a
health care facility.
In City Council June 26, 2023.
Adopted by a yea and nay vote:-
Yeas 7; Nays 2; Absent 0
Attest:- Diane P. LeBlanc, City Clerk
A true copy;
ATTEST:-
Diane P. LeBlanc,
City Clerk
History:
06/12/23
City Council
CHARTER RIGHT
Next: 06/26/23