TheCambridge Record
Search ▸ Agenda item attachment

CRT 2016 #32 · Agenda item attachment · Jun 27 2016

a report from Councillor Dennis J. Carlone, Co-Chair of the Ordinance Committee, for a public hearing held on June 14, 2016 to discuss a proposed amendment to the Municipal Code in Chapter 12.12 entitled “Street Excavations and Obstructions” by adding a new section 12.12.065 entitled “Maintenance of Safe Passage – Proper Marking of Hazards and Trench Closure Required.”

CRT 2016 #32·Council meeting Jun 27, 2016·2 pages·📄 Original PDF (city portal)·sha256 a62b1506b6f2…

⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative. Anyone can check a page against it.

ATTACHMENTA City of Cambridge 0-5 IN CITY COUNCIL March 21, 2016 COUNCILLOR KELLEY VICE MAYOR MCGOVERN COUNCILLOR TOOMEY WHEREAS: The City's responsibility to keep streets passable and reasonably safe during construction must respond to the growing number of Greater Boston residents that choose biking as their primary or supplementary form of transportation; and WHEREAS: Depressions, open trenches, vertical features at the intersection of milled and un-milled pavement, as well as gas, water, and sewer access pipes can be truly hazardous to a cyclists; now therefore be it ORDERED: That Chapter 12.12 of the Municipal Code, entitled "Street Excavations and Obstruction," be amended by adding a new section 12.12.065 entitled "Maintenance of safe passage-proper marking of hazards and trench closure required," which reads as follows: 12.12.065 - Maintenance of safe passage—Proper marking of hazards and trench closure required. A. Whenever any street is opened, occupied. obstructed or encumbered by any department of the City, or any other party to include contractors and subcontractors. workers much ensure that hazards in the work area must be clearly marked and safely managed to mitigate dangers to cyclists by: 1. Mark all vertical surfaces of 1 inch or more that are more than 30. degrees off of horizontal with bright yellow paint on the entire vertical surface(s) and at least ½ of the horizontal surface; B. At all seam areas, where the roadwork is milled up to existing surface, pavement: will be either ground at no greater than a 30 degree angle or have a ramp of asphalt fill ensuring that the contact point between the milled work and the existing surface has a ramp of no more than 30 degrees and the entire length of the seam area will be marked with bright yellow paint: 1. Ensuring that the paint marking hazards is refreshed as needed to maintain the required coverage: 2. Ensuring that all open trench or patching work will be closed by the end of business on Fridays except when weekend work is scheduled. C. Violations of the paint requirement would be viewed as clear evidence of negligence on the part of whatever party was doing the street work.
Read by machine, not yet checked by a person · check this page against the original
ORDERED: That the proposed ordinance amendment be referred to the Ordinance Committee for hearing and report. In City Council March 21, 2016. Adopted by the affirmative vote of nine members. Attest:- Donna P. Lopez, City Clerk A true copy; anna P. Xope ATTEST:- Donna P. Lopez, City Clerk
Read by machine, not yet checked by a person · check this page against the original