MEMORANDUM
To:
Yi-An Huang, City Manager
From: Brooke McKenna
Transportation Commissioner, Traffic, Parking, + Transportation Department
Date: October 31, 2024
Subject: Awaiting Report No. 24-059: Request for Speed Humps on Antrim Street
___________________________________________________________________________________
In response to Awaiting Report No. 24-059 requesting the City Manager to direct the
appropriate City departments to assess the feasibility of installing speed control bumps on
Antrim Street, we report the following:
The Traffic, Parking, and Transportation Department, Department of Public Works, and
Community Development Department are currently developing a new program to install
speed humps in the City. Speed humps are traffic calming devices with a more gradual
slope than a speed “bump” and are comfortable to drive over at low speeds. Establishing
criteria for the selection of locations for the installation of speed humps in still underway,
and we will evaluate Antrim Street for speed humps once the installation criteria is finalized
and the Speed Hump Program launches.
The traditional traffic calming measures in the City’s toolbox, such as raised intersections,
raised crossings, and curb extensions, require significant construction and are installed as
part of a larger construction project. Speed humps will allow us to install additional traffic
calming elements mid-block. Speed humps will require significantly less roadway work,
will not interfere with drainage, and can be rolled out more quickly and independently of a
full construction project. Speed humps can be considered partial-build traffic calming,
and the timeline of installations can reflect this.
We anticipate finalizing the details of the program, including selection criteria, over the
winter, with the goal of rolling out the project in late spring or summer of 2025. The scope
of the program will be limited in the first year, similar to a “pilot” program, while we fine-
tune the selection criteria, continue coordination with emergency responders, and
determine the appropriate scale for the ongoing program.
Page 2 of 2
Example of a Speed Hump in Boston