Search ▸ Communication to the City Council
CRT 2016 #61 · Communication to the City Council · Nov 7 2016
a report on behalf of Councillor Nadeem Mazen, Chair of the Neighborhood and Long Term Planning, Public Facilities, Arts and Celebration Committee, for a public hearing held on November 2, 2016 to discuss bicycle safety in Cambridge
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative. Anyone can check a page against it.
POLICE
CAMBRIDGE
OF PUBLIC
DEPARTMENT
CAMBRIDGE
RKS
344 Broadway
POLICE
TRAFFIC PARKING
CDD@344
CAMBRIDGE
COMMUNITY DEVELOPMENT DEPARTMENT
@TRANSPORTATION
November 3, 2016
Public Facilities, Arts, and Celebrations
Neighborhood and Long Term Planning,
Committee
Work Plan
Bicycle Safety
Read by machine, not yet checked by a person · check this page against the original
• Separated Bike Lane Pilot
• Vision Zero and Outreach
• Bicycle Plan Implementation
• Inman Square
• Porter Square
• Future of Massachusetts Avenue
• Current Capital Projects
• Truck Programs
Policy Context
Agenda
• Upcoming Work Plan Development
• Ongoing Initiatives
Read by machine, not yet checked by a person · check this page against the original
fine vete rule telle trototetee
stop and ate tear oh ta do use contesomb
RArinang impressmen e gerators one yose in the City nas r
die in useles die us aroma montan desert LeaDe
10.17.010 - Time period of chapter.
Chapter 10.17 - VEHICLE TRIP REDUCTION ORDINANCE
10.17.020 - Findings
6.1.2016
Reconstruction Plan
Five Year Sidewalk and Sireet
Plan
Pedestrian
2015
BICYCLE PLAN
TOWARD A BIKEABLE FUTURE
CLIMATE
Policy Context
Foundational Documents
Pay brambles
1:2015 TransiSt.
Read by machine, not yet checked by a person · check this page against the original
SAFE ROUTES
TO SCHOOL
• CITY OF CAMBRIDGE •
Armed 15°, 2016
Let Late, Bees Bes
armend Paste Wets Car it Carise Cassiles 14
Scientific Analysis of Current Trends in
Trees and Management Recommendations
Growth and Survival of Cambridge's Street
ANNUAL BUDGET 2016-2017
Policy Context
Key Documents/Initatives
The City of Cambridge
Communty Health Improvement Plan
Read by machine, not yet checked by a person · check this page against the original
Design
Bikeway
Guide
Urban
Transit
Street
Guide
Design
Street
Urban
Design
Guide
CELE
Policy Context
State and National Guidance
PLANNING & DESIGN GUIDE
SEPARATED BIKE LANE
Read by machine, not yet checked by a person · check this page against the original
Cambridge Street
Hampshire Street to
Cambridge Street (EB)
(both directions)
to Antrim Street
(Hampshire Street)
Green-backed
Green bike lanes
through intersection
Street)
sharrows (Cambridge
Additional signage
Left turn bans
Drawn By
PATRICK BAXTER
Department
Transportation
Traffic Parking &
OAK ST
DRAFT
Version
Date
7/19/2016
INMAN SQUARE INTERIM IMPROVEMENTS
Band
Scale
1=50°
FIRE
LS
STATION
INMAN ST
PLAZA
VELLUCCI
39028
ANTRIM ST
Ongoing Initiatives
Inman Square Operational Improvements
Read by machine, not yet checked by a person · check this page against the original
• Initial public outreach in early January
• Kleinfelder/Toole Design/M cM ahon/Klopfer-Martin
• Staff kickoff meeting next week
• Estimated total cost (including design): $3.5 million
• Groundbreaking by September 2017
Ongoing Initiatives
• Design team selected
• Construction
Inman Square Capital Improvements
Read by machine, not yet checked by a person · check this page against the original
• Bend Cambridge Street
• Bend Hampshire Street
Associates
consultant team
Boston Cyclists' Union/Kittelson
Options to be Considered
• Original "bending" options
• Other options to be developed by
• Double roundabout proposed by
committees
• Bicycle, pedestrian, and transit
• MBTA
• Businesses
• Local community
• Fire Department
• City of Somerville
Ongoing Initiatives
Engagement
• Additional discussions
• Ongoing coordination
Inman Square Capital Improvements
Read by machine, not yet checked by a person · check this page against the original
Marked "crossbike" to
and bus stop
Somerville Avenue bike
Minor signal timing
Green markings in bike
through intersection
connect jughandle to
lane
signage
improvements
jughandle
Additional guidance
• Green bike lane
• Bike signal changes
• Sidewalk repairs
Drawn By
Department
Transportation
Traffic, Parking & PATRICK BAXTER
WHITE STREET
Version
DRAFT
Date
10/25/2016
PORTER SQUARE INTERIM IMPROVEMENTS
1'=40
MASSACHUSETTS
AVENUE
UPLAND ROAD
Ongoing Initiatives
Porter Square Immediate Improvements
Read by machine, not yet checked by a person · check this page against the original
эрим
Somerville
Avenue
-Massachusetts
Ay enve
Massachusetts
Avenue 2
Upland Road
Close south Mass Ave driveway or
(optional)
White Street to Somerville Ave
convert to entrance
Somerville Ave to Mass Ave
Ave via White Street
Reduce Number of Phases
Upland Road
Left turns to Mass Ave & Somerville
Reduce Cycle Length
Improved Coordination with
Revise Shopping Plaza Access
Allow Left Turns
Simplify Mass Ave Left Turns
Simplify Signal Operations
Ongoing Initiatives
Proposed Changes
Porter Square Signal
Improvements
Read by machine, not yet checked by a person · check this page against the original
Somerville
Avenue
-Massachusetts
Avenue
enue s
Massachusetts
Upland Road
Somerville A ve Left Turn
Somerville Ave Right Turn
All White Street Crosswalks
Mass A ve South Crosswalk
Bike Left Tum
Mass Ave Left Tur
Mass Ave Naith Crosswalk
Mass Ave Right Turn
White Street Left Turn (optional)
Somerville Ave Through
Mass Ave Thraugh
white Street Right Turn
• Somerville Ave Crosswalk
Phase 2
Phase 3
Phase 1
Ongoing Initiatives
Proposed Signal Phasing
Porter Square Signal
Improvements
Read by machine, not yet checked by a person · check this page against the original
enue
Somerville
1 L
Massachusetts
Avenue
Massachusetts
Avenues
Upland Road
prod
Mass Ave Left Turn
Bike Left Turn
Mass Ave South Crosswalk
Somerville Ave Right Turn
Somerville Ave Through
All White Street Crosswalks
Mass Ave Pight Tum
Mass Ave North Crosswalk
Somerville Ave Crosswalk
Somerville Ave Lett Turn
Mass Ave Thraugh
White Street Left Turn (optional)
White Street Right Turn
Phase l
Phase 2
Phase 3
Ongoing Initiatives
Porter Square Signal
Proposed Signal Phasing
Improvements
Read by machine, not yet checked by a person · check this page against the original
venue
Somerville
CIAL
Massachusetts
МІЛКА
Ayenve
Massachusetts
Avenue 3u
Upland Road
Mass Ave South Crosswalk
Bike Left Tum
All White Street Crosswalks
Somerville Ave Through
Somerville Ave Right Turn
Mass Ave Through
Mass Ave Right Tum
Somerville Aveleft Turn
Mass Ave Forth Crosswalk
Somerville Ave Crosswalk
Mass Ave Left Turn
White Street Left Tum (optional)
White Street Right Turn
Phase 2
Phase 1
Phose 3
Porter Square Signal
Ongoing Initiatives
Proposed Signal Phasing
Improvements
Read by machine, not yet checked by a person · check this page against the original
Somerville
Avenue
Illelih.
Massachusetts
Avenue
Massachusetts
Avenue 2
Upland Road
Bike Left Turn
Somerville Ave Left Turn
Mass Ave North Crosswalk
White Street Right Turn
Mass Ave South Crosswalk
Mass Ave Right Turn
Mciss Ave Left Tumm
Somerville Ave Crosswalk
Somerville Ave Right Turn
Mass Ave Through
White Street Left Turn (optional)
Somerville Ave Through
All White Street Crosswalks
Phase 2
Phase I
Phase 3
Ongoing Initiatives
Porter Square Signal
Proposed Signal Phasing
Improvements
Read by machine, not yet checked by a person · check this page against the original
Allocate funding for island relocation/removal and signal relocation
• Porter Square Shopping Center
• Construction in Summer 2017
• Porter Square Neighbors Association
• Upcoming paving projects south of Porter Square
• Existing consultant to develop design plans and cost estimates
• Determine need for street paving and pedestrian ramp improvements
• City of Somerville
Next Steps
Ongoing Initiatives
• Coordination
Porter Square Signal Improvements
Read by machine, not yet checked by a person · check this page against the original
Safe Routes to School
AKE HUBWAY
TO WORK
Bike Share
at home
7%
24% 2
work
carpool
other
28%
29%
alone
public transit
drive
Bicycle Plan Implementation
Ongoing Initiatives
Data
Read by machine, not yet checked by a person · check this page against the original
low comfort
high comfort
Bicycle Level of Comfort
as a quide and reference for
and convenient for people of all ages
and abilities.
That is safe, comfortable, connected,
complete system, intended to be used
infrastructure projects undertaken in
the City.
Bicycle Plan Implementation
Ongoing Initiatives
• Creates an aspirational concept for a
The Cambridge Bicycle Plan:
• Provides a vision for a bicycle network
Read by machine, not yet checked by a person · check this page against the original
2004-2012
-Miles C
nificant estimate
anathand far those ma
Note: Crash rates are onh
Prevalen Crash Type
AND PREVALENT CRASH TYPES BY CORRIDOR
BICYCLE CRASHES PER MILLON BICYCLE MILES TRAVELED (BMT)
BICYCLE CRASH ANALYSIS
Figure 3.18: Bicycle Miles Traveled & Prevalent Bicycle
Crash Types by Corridor
Ongoing Initiatives
Bicycle Plan Implementation
Read by machine, not yet checked by a person · check this page against the original
Bicycle Network Vision
comprehensive bike network
Priority streets and paths for
improvement to build a
places
Fresh Pondi
rie:
accommodations
bicycle
Figure 5.16: Bicycle
LEGEND
Network Vision with Key
Destinations
Ongoing Initiatives
Bicycle Plan Implementation
Pretty sireeis lor educing molor
motor vehicles in order to make
Priority off-street paths
Priority streets for increasing
separation between cyclists and
streets more comfortable
vehicle toe ed andy on valine lin
call hate stacks more
Read by machine, not yet checked by a person · check this page against the original
gettngaroundcambridge /behile.asps
Bicycle Signal
www.cambndeema.gor/lome CDD/ Transportation
Updated versions of this map will be posted on the city website.
This map is for planning purposes and is subject to change. It is not
and convenientis cross intersections
a route map. Bicycles are encouraged to use all streets within the city.
For more infomatior on city bike programs, go to:
Cambridge, Massachusetts
Community Deeper an Deparment
Bicycle Facilities
Paths and Road Markings
Planned Crcle Track
Shared Lane Parement Marling
Cycle Track
- Planned Shared Lanc Pavement Marking
beteen the street and the sides all:
Grade-repacated bicyde Lines, wally located
to ride motort died er dir share the roaded
And perotic bicycle mutan tre deser bicy de une
Contes-for
• Protected Bike Lanc
• Planned Protected Bike Lane
Came Sometimes feet to as an a adulteratier.
* on serbs to tani eate toe of
•Bike Tane
• Bike Path/Multi-Use Path
* Planned Buffered Bike Lane
birde stmbol. ot other appropate mucking
mated by mea of painted Imes, pavement colonne
mam Planned Bike Lane
A lane on a strcel restricted to biercles and desig
Bicycle Plan Implementation
Ongoing Initiatives
Read by machine, not yet checked by a person · check this page against the original
Projects Completed Recently (approx: 3014 2016)
Projects in Progress (Design/ Construction)
Separated Bieycle Facility
Projects in Plinning
OfF-Road Facility
Norember 2016
Cambridge. Massachusetts
Community Derelopment Departmenr
Recent and Planned Projects
that Improve Safety for People on Bicycle
Bicycle Plan Implementation
Ongoing Initiatives
Read by machine, not yet checked by a person · check this page against the original
Fulkerson Street
Western Avenue
Ongoing Initiatives
Bicycle Plan Implementation
Bike Lanes: Massachusetts Avenue (Waterhouse Street to Linnaean Street)
Advisory Bike Lanes: Lakeview Avenue
Cambridgepark Drive
Shared Lane Markings: Richdale Avenue
Selected Completed Projects
Read by machine, not yet checked by a person · check this page against the original
Binney Street
Ames Street
Bicycle Plan Implementation
Ongoing Initiatives
Fern Street
Bike Lanes: Massachusetts Avenue (Linnaean Street to Porter Square)
Advisory Bike Lanes: Scott Street/living Street
Shared Lane Markings: Garden Street (also includes segments of bike lane)
Selected Ongoing Projects
Read by machine, not yet checked by a person · check this page against the original
• Travel lane
• Bike lane
• Parking lane
Design Elements
• Vertical delineators
• Lane width standards
• Parking protection
Work Plan Development
• Cyclistsafety and comfort
• Pedestrian crossings
Separated Bike Lanes Pilot
• Loading/deliveries
• Schoolpickup/drop off
• Street maintenance
Issues to Consider
• Replicability
• Bus stops
• Parking
Read by machine, not yet checked by a person · check this page against the original
collection
engagement
and analysis
next steps
• Afterdata
• Community
• Decisions on
Evaluation
clearance
cleaning
nications
strategy
• Snow
• Street
• Enforcement
• Commu-
Operation
materials
delineators
regulations
pavement
markings
reinstall
• Remove /
• Procure
• Install
• Issue
Implementation
measures of
detailed
collection
effectiveness
measures
mitigation
plan
engagement
• Identify
• Before data
• Develop
• Community
• Develop
Work Plan Development
Separated Bike Lanes Pilot
Planning
Read by machine, not yet checked by a person · check this page against the original
Ongoing
Spring 2016
Winter 2016/2017
Fall 2016
Work Plan Development
Measures of Effectiveness
Community Engagement
Separated Bike Lanes Pilot
Procure Materials
Evaluation
Planning
Implement
Finalize Design
Read by machine, not yet checked by a person · check this page against the original
Cedar Street to Harvard
Hampshire Street
Quincy Street to
Square
Broadway: Quincy Street
to Prospect Street
Potential Separated Bike
Lane Pilot Corridors
• Massachusetts Avenue:
• Cambridge Street:
The Horse Depo
INNER BELT
SOMERVILLE
Twin City Plaze
WINTER HILL
PROSPECT HILL
SAWARD TWO
SPRING HILL
Work Plan Development
Separated Bike Lanes Pilot
CAMBRIE
Read by machine, not yet checked by a person · check this page against the original
Mix of meters
No existing bike
and RPP
Bus stops and
bus pullouts
at multiple
44' wide
sides
facility
locations
Curb extensions
• Parking on both
Drive lane
Drive lone
Parking lane
(Quincy Street to Inman Square)
Existing Cambridge Street Cross-Section
Work Plan Development
Separated Bike Lanes Pilot
Read by machine, not yet checked by a person · check this page against the original
alternate
sides
Bus stops
lanes on both
Separated bike
side (could
44' wide
Parking on one
remain
remain
•
• Curb extensions
Drive lane
(Quincy Street to Inman Square)
Possible Cambridge Street Cross-Section
Work Plan Development
Separated Bike Lanes Pilot
Read by machine, not yet checked by a person · check this page against the original
momentum in major American cities.
mobility for all.
proved successful across Europe — and is now gaining
severe injuries, while increasing safe, healthy, equitable
collaborative framework needed to meet the goal.
Vision Zero is a strategy to eliminate all traffic fatalities and
the goal of zero fatalities and severe injuries and creating the
Work Plan Development
Vision Zero
• Vision Zero focuses on identifying the steps necessary to meet
• First implemented in Sweden in the 1990s, Vision Zero has
Read by machine, not yet checked by a person · check this page against the original
Development
• Police Department
• Community
• Traffic and Parking
Persons with
Disabilities
• Commission for
• Personnel
• Public Works
Office
• City Manager's
• Human Services
• Purchasing
• Kick-off meeting with citywide leadership in June.
• Internal working group meets monthly:
• Draft Action Plan ready for public comment in early January.
Work Plan Development
Vision Zero
Read by machine, not yet checked by a person · check this page against the original
pedestrian and transit committees; and residents
• New website will follow the successful model for the "Snow Center"
• Membership from advocacy groups; business organizations; institutional partners; bicycle,
• Advertising for interested members later this month, with first meeting early next year
• Central repository for information on safety projects for all modes
• Educational resources for all modes
• Website will also collect public feedback on safety concerns
• Establishing New Vision Zero Advisory Committee
• Creating New Vision Zero Website
Work Plan Development
Vision Zero
Read by machine, not yet checked by a person · check this page against the original
Public Engagement
SEAL
FAST. FLEXIBLE. FUN.
CitySmart
Public Engagement
Work Plan Development
Outreach - Education
Classes
Read by machine, not yet checked by a person · check this page against the original
Thore are three wave el
tatton seniod wait.
The third way is to be kind."
What's that green lane on
The Top 5 Yes-Yeses When Getting Around
The Top 5 No-Nos When Getting Around
Rules of the Road
for Getting Around in Cambridge
8088
CAMBRIDGE
GETTING AROUND
Getting Around
Cambridge Map
MOST 0
DANGEROUS
dith nior an to divert sila
Work Plan Development
Outreach - Publications
watch for bikes
our involvement is key to the success of
triving lo respecting all road users, even
adopted Vision Zero, a strategy to eliminate
In March 2016, the City of Cambridge
all traffic fatalities and serious injuries.
causes of crashes. Efforts will include
Cambrdge has an essential role in making
Vision Zero will focus our efforts on
Cambridge safe.
vist www. CambridgeMA. GOV/VisionZero.
To leam more about Vision Zero and how
person who ives, works, or plays in
to make Cambridge a safer place.
VISION ZERO
Resident Information
pamphlet with "Watch for
Bikes" sticker
Read by machine, not yet checked by a person · check this page against the original
Front of the
DO IT SAFELY!
eyelist has passed.
NO
DRIVERS: Taking a Turn?
YES
WAIT. Make your turn AFTER the
Do NOT turn in
PLEASE WATCH FOR BIKES
NO
PLEASE
parking space!
DRIVERS: This Is NOT a
YES
Don't Block the Bike Lane.
DRIVERS:
Outreach - Safety Messaging
Always LOOK before
opening your car door!
NO
YES
PLEASE WATCH FOR BINES
Read by machine, not yet checked by a person · check this page against the original
Comments
Great Street/Path
comment frequency
WikiMap - Example from Bicycle Plan
Resources
pan
bicycle es
Work Plan Development
Outreach - Public Input
nstructions
Cambride Bieval Netor
WikiMap - NEW!
Read by machine, not yet checked by a person · check this page against the original
After
Design
Huron Avenue
Work Plan Discussion
• Construction
• Design Process
• Impacts of Design Changes
Read by machine, not yet checked by a person · check this page against the original
New crosswalks
IT
(typical)
Curb extension
(typical)
at side streets
Raised crosswalk
Typical intersection detail
crossing
and at Appleton St to visually reinforce the
and make pedestrians more visible
business district
vehicle speeds and improve pedestrian
pedestrians
Special intersection treatment at Chilton St
Work Plan Discussion
Huron Avenue - Design
• Crossing island at Fayerweather St to slow
• 8 additional crosswalks
Walking
• Curb extensions to shorten crossing distance
• Raised side street crosswalks to prioritize
Read by machine, not yet checked by a person · check this page against the original
After
will include landscaping, seating and a
new Hubway station
close togetherto help speed the bus trip
stops to improve bus operations
Work Plan Discussion
• Consolidation of bus stops that are too
Bus Stops
Miscellaneous
• New street trees
• Vassal Lane Plaza is being enlarged and
• Bus stop curb extensions at most bus
Huron Avenue - Design
Read by machine, not yet checked by a person · check this page against the original
After
parked cars to move the bike lane away from
the bike lanes at all intersection conflict zones
the door zone and improve bicyclist safety.
to improve driver and bicyclist awareness.
the end of Vassal Lane.
incorporated into the new enlarged plaza at
Work Plan Discussion
Huron Avenue - Design
• Green pavement markings are being used for
• A Hubway bicycle sharing station is being
• A 3' striped buffer between the bike lane and
Biking
Read by machine, not yet checked by a person · check this page against the original
00
12.5'
Existing conditions
Work Plan
Discussion
Huron Avenue -
bike lane?
Design
to the buffered
How did we get
Read by machine, not yet checked by a person · check this page against the original
maneuver
would be further reduced
tight for buses, particularly during
wires limit ability of buses to
snow, when the effective width
and cycle track
Snow clearance of narrow roadway
Trolley-bus operations with overhead
Eliminate parking (40 +/- out of 209)
• Narrow roadway cross-section very
Separated bicycle facility
10.5'
Work Plan Discussion
Huron Avenue - Design
Read by machine, not yet checked by a person · check this page against the original
conflict points to improve
away from parked cars.
visibility and awareness.
3' buffer moves bike lane
Adding green at intersection
sidewalk
parking
buffer
bicycle lane
10.5' travel
Work Plan Discussion
Huron Avenue - Design
Buffered bicycle lanes in the final design E
Read by machine, not yet checked by a person · check this page against the original
5pm-8pm
Appleton Street
(Concoral to Saville)
*(Rain date: October 6thi
Join the project team af
Support Observatory Hill
Thursday, September 15th,
Help support your local businesses for a
with your neighbors. See you there!
night of music, shopping, and chatting
Come to Coffee Talk
1st Thursday, 7-11am:
at Sarah's Market
our project feam
(200 Concord] every
We are here to listen!
Please drop in to join
•September 1 •October 6 - November 3
We invite you to come
enjoy some food and
and answering any questions you have.
Neighborhood BBQ!
refreshments on
7:30pm on Granville Road.
Wednesday, October 5th*, 5:30pm
Project staff will be cooking up burgers
COMMUNITY
EVENTS
bar-b-ques, business events and coffee talks
• 3 drop-in sessions at Sarah's Market
• During construction - numerous open houses, neighborhood
• Neighborhood tree walk
• 5 Huron Ave design meetings
Work Plan Discussion
Huron Avenue - Design Process
• Comprehensive community process
Read by machine, not yet checked by a person · check this page against the original
• Replacement of 42" watermain between FPP and Gurney
• Full depth roadway reconstruction between Reservoir and Concord
• Huron Aveutilities and utility crossings of Huron Ave
• Removal of existing trolley tracks
• Full depth roadway reconstruction b/w FPP & Reservoir - on-going
• Final paving, trees and Vassal Lane Plaza - scheduled fall 2017
• Granite curb - scheduled November 2016
• Sidewalks - scheduled April 2017
Construction Began September 2012 / Completion end of 2017
Work Plan Discussion
Huron Avenue - Construction
• Completedto Date
• Remaining
Read by machine, not yet checked by a person · check this page against the original
Work Plan Discussion
Pearl Street
construction
expected completion at the end of
evaluated upon completion of
2017
construction
Project is in construction with
• Design will not preclude future uses
• Evaluation: data and use will be
• Data: parking data collected during
Read by machine, not yet checked by a person · check this page against the original
transit while safely accommodating other modes
intersection, and sidewalk level to develop corridor scale concepts.
• Technical assistance program (joint with MBTA) to develop a vision for Mass Ave that improves
• Includes defining potential pilot projects for 2017
• Timeline for initiating analysis is late spring 2017
• Envision scenarios will be applied to Mass Ave in more detail with a focus on the street,
Work Plan Discussion
Future of Massachusetts Avenue
Near-Term (2017)
• Participatory Budgeting striping and signage improvements
• NACTO Transportation Program Accelerator
Longer-Term (2017 and beyond)
• Envision Cambridge Mass Ave focus
Read by machine, not yet checked by a person · check this page against the original
also led fo the removal of prior overnight truck restrictions on River Street and Western
zoning ordinance
Avenue
• Following significant discussions and litigation, this ban was eventually overturned and
• Restrictions are on through trucks, but local access is still always allowed
• City of Cambridge attempted to ban overnight "through trucks" in 1999 through
• Available online under Traffic Department regulations
• Impact on businesses and others who benefit from trucks
• Legality/constitutionality
• Spilloverimpacts on neighboring streets and communities
Existing Truck Restrictions
Work Plan Development
• Prior Truck Ban
• Issues to Consider
Truck Restrictions
Read by machine, not yet checked by a person · check this page against the original
delivery destination (permitted by Massachusetts General Law)
and trucks committing violations of traffic laws (speeding, marked lane violations, red
the truck is delivering on the street or if that street is the "shortest route" to get to their
light, turning violations, etc.)
• Truck side guard and mirrors - City fleets and City contractors
• Education and outreach
• Enforcement consists of two categories: trucks operating on "truck restricted" streets
• Ban on truck restricted streets difficult to enforce because we need to determine if
Vision Zero Action Plan to include truck relatedinitiatives
• Delivery solutions study
Work Plan Development
•I Currenttruck enforcementefforts
Truck Programs
Read by machine, not yet checked by a person · check this page against the original
HAndouts
Cambridge City Council Committee Hearing on Neighborhood and Long-Term Planning
Bicycle Mobility Projects
November 2, 2016
Bicycle Safety Projects Completed
• Inman Square - painted green bicycle lanes through intersection and restricted left turns as of Nov. 1
• Western Avenue - separated bicycle facility and bike signals
•
Binney Street separated bicycle facility - Third to First Street (parts still in construction)
• Signal Changes on Broadway at Galileo & Ames - separates bicycle and vehicle moves by separate
phases
Broadway - Prospect to Portland - striping changes including bicycle lanes and shared lane markings
Mass. Avenue - Upland to Waterhouse (Demonstration Block) - add wider bicycle lanes
• Cambridge Common - add two way bicycle/pedestrian path connection along Flagstaff Park and bicycle
signal, and bicycle lanes on Mass. Avenue (one direction currently)
• Grand Junction - first phase completed with CRA from Main to Broadway
• Lakeview Avenue - installed bicycle advisory lane and study its effectiveness
• Alewife Greenway - worked with MassDOT and DCR to extend multi-use path to Belmont and up Rt. 16
• Greenough Boulevard - DCR installed separated bicycle facility from Gerry's Landing to Arsenal St.
• Waverly Street Extension Path - constructed a multi-use path with public art from Erie St. to Pacific St
Bicycle Safety Projects In Progress (design and construction)
• Mass. Ave - PB funded - add bicycle lanes and shared lane markings to Mass. Ave., north of Porter
Square to Arlington. Also looking at finishing markings from Waterhouse Street to Chauncy St. and
between Harvard and Central squares
• Protected Bicycle Lanes - PB funded - add section of protected bicycle facility to either Mass. Ave
(Quincy St to Mt. Auburn or beyond) or Brattle St (Elliot to Mason Street)
• Binney/Galileo - extend separated bicycle facility down Binney on Galileo to Main Street
• Ames Street - protected facility from Broadway to Main in construction by Boston Properties
• Grand Junction Greenway - design and construction of fully separated multi-use path from Binney
Street to Somerville line
• O'Brien Highway Separated Bicycle Facility - worked to get separated bicycle facility on O'Brien
reconstruction
• Watertown - Cambridge Greenway - working with DCR to extend multi-use path from Water Treatment
Plant to Watertown
• Scott & Irving - installing bicycle advisory lane in November
• Garden Street - planning and implementing bicycle priority route
• Huron Avenue - adding buffered bicycle lane
• Memorial Drive Phase III - DCR installing separated bicycle facility from Vassar St. to Wadsworth St.
Bicycle Safety Projects in Planning
• Alewife Bicycle-Pedestrian Bridge - completing preliminary design on bicycle-pedestrian bridge linking
Quadrangle to Triangle with Alewife Station
Read by machine, not yet checked by a person · check this page against the original
• Grand Junction Greenway - Main Street to Charles River - working with MIT to set aside space for a
multi-use path and work on implementation
• Ames Street - MIT to extend protected facilities to from Main Street to Memorial Drive as special permit
mitigation
• River and Western Bridges - working with MassDOT to prioritize funding for reconstruction that already
includes separated facilities for bicycles
Bicycle Safety Data and Planning
• Vision Zero - Council passed a resolution in spring 2016 and have staff have formed interdepartmental
Vision Zero Task Force that is working on an action plan and completing projects
• Bicycle crash analysis - crash analysis has been completed through June 2016 and posted to Open Data
portal
• Bicycle plan - gathered ideas and prioritized improvements based on comfort analysis and crash history
into a guide for future planning of bicycle facilities
• Bicycle totem counter and regular bicycle counts - Eco Totem constantly collects bicycle data to identify
trends and bicycle counts completed every other year
• Bicycle WikiMap - posting an interactive map on the web for the public to given further input on ideas
and projects
Bicycle Safety Outreach and Enforcement
• Safe Routes to School programs - 8 schools engaged, CDD program includes educational materials,
recommended routes, bicycle/pedestrian trainings for students, annual travel surveys, Walk & Bike to
School Day celebrations, and improved coordination with Cambridge Police. Schools are encouraged to
run their own encouragement and educational programs and events
• Bicycle Safety Workshops - hosted 27 workshops in 2016 calendar year, engaging nearly 500 residents
and workers in Cambridge in Bicycle Education - including almost 100 high school students
• Planning in-school bicycle education workshop in January for all CRLS students who bike (either to
school or recreationally). Working with a science teacher (sponsor) and one of the deans of the school
Students will get a pass from class to participate. Expecting approximately 400 students to participate
• Rolled out new series of flyers looking at how to share the road for all users, with an emphasis on bicycle
infrastructure (how people on bike should use it and for people who drive to know what it is
• Since May of 2015, distributed almost 60,000 Getting Around Cambridge maps with the top 5 most
dangerous things to do as a driver, rules of the road for all users, and best practices for people on foot,
transit, bike, or driving in the city
Launching the Street and Sidewalk Ambassador program for City staff in spring of 2017 - rules of the
road training and conflict mediation discussion to encourage shared and neighborly use of Cambridge
streets and sidewalks
• Regular social media posting about safety for people on foot, bike, on transit or in motor vehicles.
PARK(ing) Day 2016 turned 96 parking spots into parks, playgrounds, Vision Zero outreach spots,
Envision Cambridge discussion locations, and separated bike lanes for the day. PARK(ing) Day Storymap
had close to 1000 views. Over 50 unique tweets using #ParkingDay2016 and dozens more using
#ParkingDay & #CambMA
• Hosted transportation workshops with almost 200 City of Cambridge employees, and talked about the
rules of the road for people on bike and the dangerous activities for people who drive
Read by machine, not yet checked by a person · check this page against the original
Sustained Traffic Enforcement Program (STEP): Provides funding for enforcement overtime shifts
focusing on observed traffic infractions that represent most harmful behavior at priority intersections.
Priority infractions enforced consisted of crosswalk violations, speeding, red light / stop sign and
distracted driving violations
Bicycle and Pedestrian Safety grant: This grant funds overtime enforcement efforts related to bicycle
and pedestrian safety. Patrols were conducted during the morning and evening commuting periods and
were concentrated at intersections with the highest reported accident totals. Among the areas targeted
for enforcement were: Harvard Square, Porter Square, Central Square, Lafayette Square and Inman
Square. The most frequent violations issued were for: Failure to Yield to Pedestrian in a Crosswalk, Red
Light / Stop Sign, Improper Turn, and marked lane violation
Bike Safety Month (May): For the third consecutive year the Cambridge Police Department either lead or
participated in a number of initiatives and events intended to increase the safety of all people who
bicycle, drive or walk. CPD hosted and/or partnered in over 15 bike safety educational events in May
2016 engaging in hundreds of conversations and educational opportunities. CPD combined it's in person
engagement with a concentrated messaging campaign with an active presence on social media and the
utilization of variable message boards promoting road safety.
Read by machine, not yet checked by a person · check this page against the original
Miles
Fresh Pond
November 2016
Cambridge, Massachusetts
Community Development Department
Recent and Planned Projects
that Improve Safety for People on Bıcycle
Map prepared by Brendan Monroe on November 2, 2016. CDD GIS C:\Pro
Off-Road Facility
Projects in Planning
Separated Bicycle Facility
Charles River
Projects in Progress (Design/ Construction)
Projects Completed Recently (approx. 2014-2016)
Read by machine, not yet checked by a person · check this page against the original
pavement markings.
Bike Lane
-To Lexington and Bed
by an open space or barrier.
• Planned Bike Lane
Bike Path/Multi-Use Path
i Planned Buffered Bike Lane
physically separated from motor vehicle traffic
A bike or multi-use path is an off-road facility,
parking lane by open space that is indicated by
Fresh Pond
bicycle symbols, or other appropriate markings.
A bike lane on a street that is separated from the
A lane on a street restricted to bicycles and desig-
nated by means of painted lines, pavement coloning.
Planned Bike Path/Multi-Use Path
Contra-flow
traffic on a one-way street.
Protected Bike Lane
Planned Protected Bike Lane
A contra-flow lane is a bicycle facility marked
to allow bicyclists to travel against the flow of
A bike lane at street level with physical protection from
barrier. Sometimes referred to as an at-grade cycle track.
passing motor vehicle traffic, such as a parking lane or other
Cycle Track
Shared Street
grade-separated sidewalks.
ato St
Planned Cycle Track
between the street and the sidewalk.
and specific bicycle markings are desired.
motor vehicles, all at the same level without
Grade-separated bicycle lancs, usually located
shared by pedestrians, bicyclists, and low speed
A street that is created as a common space to be
Shared Lane Pavement Marking
to remind motorists that bicyclists share the road.
A bicycle symbol marked on the pavement intended
November 2016
Used when there is insufficient space for bicycle lanes
Planned Shared Lane Pavement Marking
Community Development Department
Cambridge, Massachusetts
wad Are T
Bicycle Facilities
Paths and Road Markings
Bicycle Signal
and conveniently cross intersections.
gettingaroundcambridge/bybikc.aspx
Charles River
A traffic signal for bikes that provides cyclists with
their own signal phasc, cabling them to more safely
For more information on city bike programs, go to:
www.cambridgema.gov/home/CDD/Transportation/
Miles
Updated versions of this map will be posted on the city website.
This map is for planning purposes and is subject to change. It is not
a route map. Bicycles are encouraged to use all streets within the city.
0.25
Map prepared by Brendan Monroe on October 31, 2016. CDD GIS C:Projocts\BikePaths|Faciltios11x17.mxc
Read by machine, not yet checked by a person · check this page against the original