Search ▸ Agenda item attachment
APP 2017 #3 · Agenda item attachment · Jan 23 2017
A petition has been received from residents and patrons of the Massasoit Elks Lodge #129 regarding the long term negative effects of the proposed Mass and Main construction project
⚠ This document is a scan; its text was recovered by optical character recognition and may contain errors. The original PDF is authoritative. Anyone can check a page against it.
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Boards)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Signature
Name
Resident
189 Windsor St.
Richard Harding
yahoo.com
242°
Moes mor
' WESTERIAL
MosEs mockr
5920 mysT.
YAhoo.com
EdWAtson
Ally TKry
320 athens
Junet maytel
Steve Warner
Campy
16 Kinnaird Radatech Campy
CARLA CASEy
@ uhoo ceM
Denelda Show
148 Colemanst IR Dotter nas aba Fatten
Noos Per
andream.
19B Pelican Cir.
Don Porkell crite mati D
Andrea Howard
207 DUSLE, 5249 ASIMLANOROM
X
62Norfolk steamb dance, lis, ayaaccom
Lnda allison
Woth
Ptrick samuell
Read by machine, not yet checked by a person · check this page against the original
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Name
Signature
Resident
32sullivanst the
Kunis Clustan
Bled, ME
Eleant hil
V
Was it
HOTMAIL.COM
73 Birds t
Are enned 579@00cs A lex Remay
Alex kennedy
470 Green st
Fisast
Abusa
Rooms
rane
Box 798891
Dr boys Tolms
Darren Mack
kantan
NomiNalon
• meane sti
потікертня
You omni
33 Rogas st
Read by machine, not yet checked by a person · check this page against the original
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Name
Signature
Address
Resident
Wester trither
6ot Vant
Lorded
JOSON E
42 Magazine st
X
167 chest
bloglyneve
X
25 Marketst
Jordan Mosley
Sandrab, larkin
GENE JARVIS
X
iOO HARVAROST
VONNA JARVIS
Belinda tohnson
118 Daçtmonthst queenbeazzza
189 LiNdardt
Russell Hadin
FAts 4430gma1ca.
ARieL Cotan
18. Quairy st.
Kimbelu Buder 113 Med ords
Shan Adams
Dennis Latto PO BOX 499
goc505s st/
she 30g
tetabeguymitcon
Read by machine, not yet checked by a person · check this page against the original
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Name
Signature
Resident
BrepoS 12076
hif
JEFFBARROS
CAMBNA02139
10 Bassett st.
SPE 4484@16R
Keikh Marial
reyflo @oghor.com
Rey Flo
Josell, Ek
243 brade relation
/SOPUtAGA AVe
Nebon Sale
SmAil. com
-
BosTom Ma
Lana Zimporar
2201 aid ST
sanb MC
patricia miRe Ral
VI EXS
654 Gertras
Lovismicksez
L049
Hit co cares
Fpip
MY LISTENA
stay Lout
RochellcLayne
Read by machine, not yet checked by a person · check this page against the original
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Name
Signature
Resident
12 EIM HillI
Mely. Bento
7l crawford
MicheleNn
Derona Melon
Ucratard
Smoothes fm
12 Shae ho
avone bar
1 JacksoPl
isa Jarvis
Lisataris@ concastnot Say
(heryl Ki/burn 1715 Mass Ave Chekiburyahoo. com Chenfotel
Hareli
arture Russel
PORECIOT
Duahoo
heri Elliot
Brocken
VeldaChaber
fRene Yang
Jover by.
M.haDaul
V 11
Dar
Darnel large
Diana tato
NATA MONES
Read by machine, not yet checked by a person · check this page against the original
--
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Signature
Name
Resident
Hissins Chria
merl
meal
dede
Fire tans hastingst.
crack at fun
35h Farmant
Eil Seve
James tiere
calambix
bein Green
Tack Bull
-
Lay Nolf
EMILLER
ranizz(k)
Renalde
[email removed]
Chambers
Read by machine, not yet checked by a person · check this page against the original
.....
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Email
Address
Signature
Name
Resident
DD.FORTE
24 WAint DIE 117564Ml amen Dosi
Micke cardamor
Glo
penise
med forc
tarters
29 Granitest
Mark Gat
Maran tole comcas
MichellE
Honest
HUBBAPAYB
TRomet
FAM
JiMMy SEMES
Can ter
817 men(or)
Dona Date B Parentre
wildet
lifer
kenda Sheetopal
N/A
fastes
Ryan toster stremontst
amal Smardells
CARL GRAHAM SG WESTERAMUE
Calfulin
Read by machine, not yet checked by a person · check this page against the original
We, the citizens of Cambridge and patrons of Massasoit Elks Lodge #129, petition the city to
careful consider all the disruption, loss of revenue, and the long term negative effects of the
proposed "Mass and Main" construction project. This project has the potential not only to
threaten the integrity of the Port/Central square neighborhood but also threaten viability and
sustainability of the Massasoit Elks Lodge a 108 year old community institution and business
asset.
We the undersigned respectfully demand that the, City Council, Planning and Zoning Board(s)
fully consider the consequences of a project of this magnitude. We ask that you carefully
reconsider this project and suspend all permits and construction plans indefinitely.
Patron/
Address
Email
Signature
Name
Resident
e
Pa.5
WUaT2N1x120000·000
Chise davacho can Vonda
Same NE
BangLan
Banya ar
V4Y US
WAYNE
WDO HUSAN7 C Gmail, cum
waJohnson 7@gmail .com
Wayne Johuson
Read by machine, not yet checked by a person · check this page against the original