Search ▸ Agenda item attachment
CMA 2017 #264 · Agenda item attachment · Oct 16 2017
A communication transmitted from Louis A. DePasquale, City Manager, relative to Awaiting Report Item Number 17-74, regarding a report on the gas leak on Binney Street
City of Cambridge
Department of Public Works
Owen O'Riordan, Commissioner
147 Hampshire Street
Cambridge, MA 02139
theworks@cambridgema.gov
Voice: [phone removed]
TDD: [phone removed]
October 10, 2017
To:
Louis DePasquale
City Manager
From: Katherine F. Watkins
City Engineer
Re:
Council Order O-27, dated August 7, 2017 regarding Gas Leak on Binney Street
JULY 28, 2017 GAS LEAK ON LINSKEY WAY (ADJACENT TO 100 BINNEY ST)
The July 28, 2017 gas leak on Linskey Way was associated with construction at 100 Binney
Street; a 10-story mixed use office and research facility. The work on the building began on the
site in June 2015. As of July 2017, the majority of the work associated with the core building
permit was complete and the contractor was proceeding with surface restoration along portions
of Binney St, Linskey Way and Second St. During the curb and sidewalk work, the contractor
proceeded to remove a concrete slab that had been used as a foundation for a material hoist
during building construction. It was during the removal of this concrete slab that the rubber tire
excavator struck a 4-inch diameter intermediate pressure gas main. This strike broke the gas
main and caused the release of gas into the air. The incident is currently under investigation by
Eversource Gas and will likley result in a Department of Public Utilities (DPU) Investigation.
Obviously, the City will fully cooperate with any DPU investigation and will take any relevent
recommendations that such an investigation proposes into consideration as further projects
similar to this are considered in the future.
The Cambridge Fire Department (CFD) received an alarm at 8:01 am on July 28, 2017 and
Eversource Gas was notified of the leak at 8:04 am. The CFD sent mulitple companies into the
surrounding buildings and began evacuation of 15 buildings and nearly 4,000 people. The
Cambridge Police Department (CPD) provided traffic control to the support the safe
management of the site. Eversource Gas arrived on the site at approximately 8:30 am and
immediately began working to close valves and isolate the section of damaged gas main. The
gas main was isolated and shut off at 9:25 am. Eversource completed the the repair of the gas
main at 4:05 pm and restored service to all customers. During the repair work, 4 customers
were without gas service.
The Department of Public Works (DPW) prioritizes safe construction and the protection of
existing utilities during construction for both public and private projects. DPW requires all
contractors and utility companies performing work in the public way to be permitted; follow
DigSafe protocol; and be properly bonded and insured. Utility companies and major contractors
are required to attend weekly construction meetings to coordinate construction activities;
participate in safety presentations; identify any utility conflicts associated with their work; and
address any community relations issues. Every year DigSafe representatives attend one of the
construction meetings early in the construction season to review the requirements for
contractors to call in for a DigSafe markout prior to excavation; protocol for maintaining the
DigSafe markings; and requirements for excavating around existing utilities. Furthermore in the
Spring of 2017, DPW hosted a damage prevention seminar presented by Eversource with large
permit holders before the start of the construction to specifically review safety when working
around gas mains. All of these efforts are focused on supporting safe and efficient construction
in the public way; and ensuring public safety.