CMA 2017 #320 · Agenda item attachment · Dec 11 2017
A communication transmitted from Louis A. DePasquale, City Manager, relative to Awaiting Report Item Number 17-114, regarding a report on the plan for snow removal from the new bike infrastructure in the city
December 6, 2017
TO:
Louis DePasquale
City Manager
FROM:
Owen O’Riordan
Public Works Commissioner
Re:
Awaiting Report AR-17-114 update the City Council on the plan for snow removal relating to
the new bike infrastructure in Cambridge.
Executive Summary
In response to the above awaiting report, it is recognized that over the past several years there has been an
increased focus on building and creating safer bike facilities across the City and such need to be properly
maintained throughout the year. All snow storms are different and the response to each event will vary
accordingly. There are numerous variables that must be considered as a response program is prepared, be it in
terms of the snow type and volume anticipated, the antecedent conditions and the availability of snow salting,
plowing and removal resources.
Such being the case, our practice in not to guarantee a certain level of performance in response to a storm but
rather to provide a prioritization on how we generally approach snow and ice clearance during and after winter
events. The primary focus during a snow event is to ensure that emergency vehicles can access all properties
throughout the City. Presuming such access is accomplished satisfactorily, within a couple of days resources
are then focused on a thorough opening of transit facilities, bus stops and adjacent sidewalks and pedestrian
crossings within the City.
Over the past three years, additional attention has been brought to bear on addressing safety concerns on
traditional bike lanes. While these facilities are generally addressed during the course of typical road salting and
plowing events, it is not untypical for such facilities to be narrowed and further compromised though sloughing
and when neighbors dig out around their cars etc. DPW has deployed smaller equipment to get closer to cars
and better push back this snow after snow events but also recognizes as snow becomes “hardpacked” this effort
is more challenging both from a plowing perspective as well as from an equipment control perspective.
Obviously as new raised cycle tracks and protected bike lanes have come on line, the City’s operational
departments responsible for maintaining such facilities during the winter months are challenged to ensure
adequate resources are available and in operation to make these facilities as safe as possible as soon as possible
after winter storm events. No representation is made that such are safe to ride on during the course of a snow
storm itself.
Overview of Cycling Infrastructure in Cambridge
Over the past several years there has been an increased focus on building and creating safer bike facilities across
the City and such need to be properly maintained throughout the year. Over the past two decades numerous new
separated bike facilities have been created. Separated bike facilities were built parallel to Fresh Pond Parkway
and Concord Avenue in 2001. Raised bike facilities were built on Vassar Street, east and west between 2005
and 2010. The Concord Avenue facility between Fresh Pond Parkway and Blanchard Road was built in 2012
The raised facilities on both Binney Street and Western Avenue have been built in the past five years as have
those adjacent to Flagstaff Park, Galileo Galilei Way and North Point Park.
Over the past two to three years approximately 1.5 miles of additional at grade separated facilities have been
created across the City, starting with Ames Street and then Cambridge Park Drive and then the two pilot
facilities on Massachusetts Avenue at Lafayette Square and the Harvard Law School. More recently facilities
have been created on Cambridge Street between Quincy Street and Inman Square, on Massachusetts Avenue
between Throwbridge Street and Bow Street, a small section of Broadway at Draper Labs and finally that which
was created late this summer on Brattle Street between Guglielmo Plaza and Mason Street.
Operational Priorities During Snow Events
All snow storms are different and the response to each event will vary accordingly. There are numerous
variables that must be considered as a response program is prepared, be it in terms of the snow type and volume
anticipated, the antecedent conditions and the availability of snow salting, plowing and removal resources.
Such being the case, our practice in not to guarantee a certain level of performance in response to a storm but
rather to provide a prioritization on how we generally approach snow and ice clearance during and after winter
events.
The primary focus during a snow event is to ensure that emergency vehicles can access all properties
throughout the City. With larger snow storms, such may result in Emergency Parking Bans (EPB) where
parking is forbidden on numerous routes across the City. The primary activity during this time is plowing and
pushing snow back to the curb so that we are maximizing the width of street, addressing severe public safety
issues and continuing to provide access for emergency vehicles. This operation provides for a circumstance
where normal traffic and parking activity can be restored as soon as possible.
Presuming such access is accomplished
satisfactorily, within a couple of days resources
are then focused on a thorough opening of
transit facilities, bus stops and adjacent
sidewalks and pedestrian crossings within the
City. Much of this effort involves removing
snow from sidewalks and from the adjacent
curb line. In parallel to these efforts, additional
crews are busy opening pedestrian routes to
public buildings, schools and vehicular access
to school parking lots. At this time, the
Department of Public Works is responsible for
snow clearing of 23 miles of sidewalk.
Obviously, for exceptional storms or when
events occur immediately after each other, our
approach gets modified, but the primary focus
continues to be directed towards emergency
access and addressing significant public safety
situations.
Over the past three years, additional attention has been brought to bear on addressing safety concerns on
traditional bike lanes. While these facilities are generally addressed during the course of typical road salting and
plowing events, it is not untypical for such facilities to be narrowed and further compromised though sloughing
and when neighbors dig out around their cars etc. DPW has deployed smaller equipment to get closer to cars
and better push back this snow after snow events but also recognizes as snow becomes “hardpacked” this effort
is more challenging both from a plowing perspective as well as from an equipment control perspective.
Obviously as new raised cycle tracks and protected bike lanes have come on line, the City’s operational
departments responsible for maintaining such facilities during the winter months are challenged to ensure
adequate resources are available and in operation to make these facilities as safe as possible as soon as possible
after winter storm events. No representation is made that such are safe to ride on during the course of a
snow storm itself. To the extent that cyclists are on the street both during and immediately after snow
events all traffic needs to recognize that they need to share the road.
Traditional On Street Bike Lanes
As has been indicated, during EPB storms every effort is
made to push snow back to the curb line to the maximum
extent possible. Even with an EPB in place, accumulated
snow volumes can make it difficult to push snow close to
the curb line. This situation will cause cars to park further
from the curb, encroaching into the bike and travel lanes
causing a gradual narrowing of the street and further
forcing cyclists into the vehicular travel way.
Because our ability to remove and store snow is limited,
we only perform snow removal when we get significant narrowing of a streets which limit the ability for public
safety vehicles to respond to emergency situations.
An exception to this rule is Hampshire Street. Last year in recognition of the large number of cyclists using the
Hampshire Street, DPW, Traffic and the Police Department sent a letter to neighbors along the street indicating
that if snow accumulation narrowed the street such that the bike lanes were not traversable parking would be
removed overnight for two nights while snow was removed from the street. Given the nature of last winter
season, this procedure was only required on one occasion and neighbors were greatly cooperative. It is expected
that a letter alerting neighbors to the same circumstance will be sent to the Hampshire Street community this
year.
Raised Cycle tracks:
The Vassar Street facilities are maintained by MIT, the Binney Street
facilities are maintained by Alexandria and the Northpoint Facility is
maintained by Divco West. The remaining raised cycle track facilities
are maintained by the City. While no guarantee can be made to maintain
these facilities both during and immediately after snow events, as a
practical matter, such need to be addressed throughout storms (most
particularly during wet snow events) to ensure that they remain open
after the event. Our practice is to plow these facilities as needed during
and after storms, otherwise, they can become very problematic when
snow becomes compacted making it more difficult for plows to move
the material to one side. With compacted snow we typically need to re-
salt the areas several times to break up the snow pack before it can be
plowed. The Western Avenue facility is built with pervious asphalt,
thereby reducing the potential for icing and reducing the extent to which
it needs to be salted during smaller events.
Protected bike lanes:
As with raised bike facilities, protected bike lanes are generally maintained by vehicles with 4 to 6 foot plows.
At this time, the City has eight such pieces of equipment (Holders) and we rent additional small pieces
equipment, to the extent such are available, during the winter to supplement the eight in-house pieces. These
vehicles are used on sidewalks, pathways and bike paths throughout the City. This year with the substantial
increase in protected bike lanes throughout the City some of this equipment will be used to plow these cycling
facilities.
The Cambridge Street and Massachusetts Avenue facilities are relatively narrow and we expect to treat these
facilities with the holders with their 6/4 ft. plows and salting trailers. It is expected that windrows will form at
the edge of the stanchions as well as the curb edge. Because of the physical layout/grading of our streets icing
becomes more likely and therefore requires more attention, thus we anticipate having to salt bike lanes on a
more frequent basis. Similarly, depending on the degree of snow accumulation, parking may occasionally need
to be banned from these street segments so as to allow for snow removal to ensure adequate vehicular access
through these sections. Parking bans to remove snow generally happen overnight, thus minimizing the impact
on businesses and allowing for a safer and more efficient cleanup. To provide for efficient access and snow
removal from bike lanes when the need arises, some of the flex posts will be removed before the onset of
winter.
The Brattle Street cross section is different to the Cambridge
and Massachusetts Avenue cross sections and will require the
replacement of the existing posts with posts that can be taken
in and out depending on the weather throughout the winter. It
is expected that in advance of snow storms where
accumulating snow can be expected parking adjacent to the
posts as well as the posts themselves will need to be removed.
This allows for snow to be plowed to the curb and for parking
to be recovered quickly without having to deal with a
windrow in the middle of the street. This process will also
reduce the extent to which snow removal events will need to
be scheduled on Brattle Street, but may result in the slight
narrowing of the bike lane as winter moves along.
The Best Laid Plans….
It needs to be recognised that while every
precaution is taken in preparation for our winter
weather events, the City cannot make any
commitment to being able to maintain bicycle
facilities in the event of blizzard or large
accumulating snow storms. It is indeed a possibility
that the City may chose to remove flex-posts in
advance of larger events on both Massachusetts
Avenue and Cambridge Street as well as on Brattle
Street. In those instances where posts are not
removed, we will do all we can to limit damage to
the flex post equipment recognizing the difficulty
snow plowing and removal equipment may have in getting into some of these spaces and will likely cause
damage. Public Works will work with Traffic, Transportation & Parking to determine if permeant or temporary
delineators will be replaced after these events.
Communication
As has been the case over the last number of years, the Department of Public Works together with the City
Manager’s Office, the Traffic, Parking and Transportation Department, The Police Departments and the
Emergency Management Department will work to ensure that up to date information is provided about winter
weather events and whether snow emergencies, city wide parking bans or bike lane parking bans are declared in
the City. Information will be relayed via social media, The City’s web site and through Code Red telephone
communication systems.