πŸ› The Cambridge Record
Search β–Έ Agenda item attachment

An application was received from Daniel Brennan, requesting permission for a projecting sign at the premises numbered 3 Brattle Street approval has been received from Inspectional Services, Department of Public Works, Community Development Department and abutter

APP 2018 #344Β·Council meeting Oct 29, 2018Β·24 pagesΒ·πŸ“„ Original PDF (city portal)
CAMBRIDGE HISTORICAL COMMISSION 831 Massachusetts Avenue, 2nd Fl., Cambridge, Massachusetts 02139 Telephone: [phone removed] Fax: [phone removed] TTY: [phone removed] E-mail: histcomm@cambridgema.gov URL: http://www.cambridgema.gov/Historic Bruce A. Irving, Chair, Susannah Barton Tobin, Vice Chair; Charles M. Sullivan, Executive Director William G. Barry, Jr., Robert G. Crocker, Joseph V. Ferrara, Chandra Harrington, Jo M. Solet, Members; Gavin W. Kleespies, Paula A. Paris, Kyle Sheffield, Alternates CERTIFICATE OF NONAPPLICABILITY Property: 1-3 Brattle Street Applicant: AP Brattle Square, LP Attention: Daniel Brennan, DPB Permits The Cambridge Historical Commission hereby certifies, pursuant to Chapter 2.78, Article III of the Code of the City of Cambridge and order establishing the Harvard Square Conservation District, that the work described below does not involve any activity requiring issuance of a Certificate of Appropriateness or Hardship: Install conforming wall and projecting signs for &pizza and Milk Bar tenants. ISD Record #22837 All improvements shall be carried out as shown on the plans and specifications submitted by the applicant, except as modified above. Approved plans and specifications are incorporated by reference into this certificate. This certificate is granted upon the condition that the work authorized herein is commenced within six months after the date of issuance. If the work authorized by this certificate is not commenced within six months after the date of issuance or if such work is suspended in significant part for a period of one year after the time the work is commenced, such certificate shall expire and be of no further effect; provided that, for cause, one or more extensions of time for periods not exceeding six months each may be allowed in writing by the Chair. Case Number: 4012 Date of Certificate: October 23, 2018 Attest: A true and correct copy of decision filed with the office of the City Clerk and the Cambridge Historical Commission on October 23, 2018. By Charles M. Sullivan/slb , Executive Director. Twenty days have elapsed since the filing of this decision. No appeal has been filed . Appeal has been filed . Date , City Clerk
18 June 2018 Ms. Heidi Guerard &pizza 666 Monroe St NE Washington, DC 20017 Dear Ms. Guerard, We are pleased to provide this proposal for & Pizza as outlined in the drawing set prepared by McMahon Architects dated 6/7/2018. Pricing includes project coordination, engineering, shop drawings, materials, fabrication, crating, shipping, installation, and all applicable taxes. Pricing is based on providing all of the work noted in the below listed scope as one project with a single procurement and mobilization. & Pizza $ 20,055.00 Cambridge MA Sales Tax – 6.25% on product only $ 846.88 Project Total $ 20,901.88 Awnings $ 9,843.00 β€’ 4 sections of open ended awnings with painted frames, SGS vinyl graphics with 12” loose straight valance. (1) 2’3” x 4’6” x 22’7” (1) 2’3” x 4’6” x 20’9” (2) 2’3” x 4’6” x 6’ Interior Neon Sign $ 6,230.00 β€’ 3’x3’ aluminum cabinet painted white with pink neon tube spelling β€œMilk”. Sign installed hanging in front window. β€œ& Pizza Sign” $ 3,982.00 β€’ Approximately 2' wide x 1'6" tall custom fabricated aluminum cabinet. Will feature "& Pizza" illuminated through negative cut outs. Installed above mosaic tile feature. Pricing does not include β€’ Permits β€’ Removal of existing awning β€’ Equipment Rental
We have assumed adequate electrical service will be available at venue location. We have also assumed that all artwork will be provided in a format ready for production. In order to begin work, a signed purchase order or contract accompanied by a deposit of twenty five percent (25%) is required, with subsequent monthly billings to follow based on percentage of completion. Thank you for inviting us to provide this proposal. Should you have any questions, comments, or concerns please do not hesitate to call. Sincerely, Sebastian Castro Project Developer Cc. Scott Mihalik, DCL Sebastian Castro Claudine Lostao VP, Head of Design & Construction August 3rd, 2018