Search ▸ Communication to the City Council
a Presentation regarding the Tobin Montessori and Vassal Lane Upper Schools Project
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
1
CITY OF CAMBRIDGE
TOBIN MONTESSORI AND VASSAL LANE UPPER SCHOOLS PROJECT
12/02/2019
CITY COUNCIL /SCHOOL
COMMITTEE ROUND TABLE
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
2
7:30 - 7:50 p.m.
Introductions
Presentation
• Program
• Goals and Principles
• Option Drivers
• Design Options
• Option Comparison
• Look Ahead
7:50 - 8:30 p.m.
Discussion
AGENDA
02 DECEMBER 2019
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
3
PROJECT ELEMENTS
Program
• Tobin Montessori School
• Vassal Lane Upper School
• Self-Contained Special Education
• Special Start
• Preschool & Community School
Performance
• Net Zero Emissions
Site
• Soil Management
• Municipal Storm Water
• Sports Fields & Playgrounds
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
4
WHAT WE HEARD
APRIL COMMUNITY MEETING FEEDBACK
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
5
PROGRAM
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
6
PROGRAM CAPACITY
PROGRAM
GRADES
EXISTING
PROPOSED
Human Services Preschool
PreK
160
Tobin School
Montessori
PreK – 5th
312
336
Special Start
PreK
14
75
*Substantially Sub
Separate Special Ed
K – 5th
40
Vassal Lane Upper School
General Program
6th – 8th
300
450
*Sheltered English
Immersion
6th – 8th
75
75
*Substantially Sub
Separate Special Ed
6th – 8th
24
48
All Programs
725
1,184
MAXIMUM NUMBER OF STUDENTS (UPDATED 12/02/2019)
*Note: In reality the Substantially Sub Separate Special Ed Students and the Sheltered English
Immersion Students are not additive. They will almost always be in the 450 due to the need to
schedule and mainstream with the general population. These students do, however, need program
homerooms which appears to inflate the total capacity.
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
7
• Auditorium
• Gyms
• Assembly Spaces
• Science Department
• Office of Student Services --
offices and testing center
• Storage and Shop
PROGRAM ELEMENTS
COMMUNITY AND DISTRICT-WIDE
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
8
FACILITY SPACE PROGRAM
AREA COMPARISON
PROGRAM
EXISTING
GSF
PROPOSED
GSF
Human Services
5,291
31,380
Preschool
Community School
Tobin Lower School
36,878
60,600
Vassal Lane Upper School
33,059
63,300
Shared Spaces
44,625
120,800
Learning Commons
Gyms
Dining
Auditorium, Performing Arts & Visual Arts
Professional Development
CPS District Wide
8,317
22,300
Building Total
+/-128,170
298,380
Preschool &
Community
School
Tobin
Montessori
Vassal
Lane
Shared
District
Underground Parking
0
+/- 55,000
Grand Total
+/- 128,1701
353,380
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
9
• Playgrounds
• Sports Field
• Off-street Parking
• Bus and Car Drop-off/Pick-up
• Bicycle Connection
• Emergency Vehicle Access
• Tree Protection
OUTDOOR PROGRAM
PROGRAM ON-GRADE
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
10
• 1.25 Million Gallon Storm
Water Tank
• Bioswales and Rain Gardens
• Solar Panels
• Geothermal Wells (if used)
• Parking and Circulation
SITE INFRASTRUCTURE
2070 Storm Surge and Precipitation Flooding
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
11
GOALS & PRINCIPLES
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
12
DESIGN GOALS
SUSTAINABILITY
RESILIENCE
COMMUNITY
ASSET
Design for net zero
emissions and target net
zero energy and a healthy
environment
Include regional, local, and
on-site storm water
management with a building
above the future flood plain
Provide a campus respectful
of neighborhood and traffic
impacts, providing public
open space amenities
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
13
EDUCATION DESIGN PRINCIPLES
Create an identity and front
door for each program
Offer a hierarchy of spaces
supporting developmental
needs of each school
Draw a healthy balance
between school program
and shared spaces
IDENTITY & ARRIVAL
FOR EACH PROGRAM
A HEART FOR EACH
PROGRAM
ORGANIZE THE
CAMPUS FOR
EFFICIENT SHARING
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
14
EDUCATION DESIGN PRINCIPLES
Provide developmentally
appropriate opportunities for
active, experiential, reflective
learning and socialization
Connect learning spaces with
readily accessible outdoor
spaces designed for learning,
recreation, and socialization
Create a locus for students
and teachers, and support
professional development for
teachers on- and off-site
DIVERSITY OF OPEN
SPACE FOR EACH
PROGRAM & AGE
EACH PROGRAM HAS
EASY ACCESS TO THE
OUTDOORS
CREATE A LOCUS OF
LIFE-LONG LEARNING
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
15
OPTION DRIVERS
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
16
EXISTING SITE CONTEXT
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
17
SITE UNDERSTANDING
VALUABLE TREES
ACCESS AND PARKING
OPTIMAL MASSING FOR NEIGHBORHOOD
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
18
CLIMATE RESPONSIVENESS
-6000
-4000
-2000
0
2000
4000
2010
2015
2030
2070
Energy Use in Buildings Shifting -
More Cooling, Less Heating
Cooling Degree Days (CDD)
Heating Degree Days (HDD)
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
19
EXISTING TRAFFIC VOLUMES
13
26
39
19
5
2
11
6
2
1
1
4
6
2
1
1
4
6
2
3
5
0
10
20
30
40
50
1:25 -
1:35 PM
1:35 -
1:45 PM
1:45 -
1:55 PM
1:55 -
2:05 PM
2:05 -
2:15 PM
2:35 -
2:45 PM
2:45 -
2:55 PM
2:55 -
3:05 PM
3:05 -
3:15 PM
Number of Vehicles
Tobin Montessori
Vassal Lane
Afternoon Pick-Up Accumulations
Pick-Ups on Street
Pick-Ups in Circle
Buses in Circle
Peak Cars
2
3
12
26
19
1
2
2
1
2
4
7
12
7
1
3
4
4
2
2
2
2
1
2
1
1
0
10
20
30
40
50
7:15 -
7:25 AM
7:25 -
7:35 AM
7:35 -
7:45 AM
7:45 -
7:55 AM
7:55 -
8:05 AM
8:15 -
8:25 AM
8:25 -
8:35 AM
8:35 -
8:45 AM
8:45 -
8:55 AM
Number of Vehicles
Tobin Montessori
Vassal Lane
Morning Drop-Off Accumulations
Drop-Offs On Street
Drop-Offs In Circle
Buses in Circle
Peak Buses
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
20
Ambient Sound Survey (Current)
• Sources are traffic and human activity
• Levels are within city ordinance limits
Nighttime:
<50 dBA
Daytime:
<60 dBA
• Measured Levels
37-46 dBA
42-57 dBA
46-59 dBA
EXISTING SOUND LEVELS
1
2
3
1
2
3
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
21
Concrete Structure
Concrete Block Infill
Limited Windows, Views
Angular Rooms
Aged Systems and Finishes
EXISTING BUILDING
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
22
DESIGN OPTIONS
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
23
OPTION 1: RENOVATION / ADDITION
• Re-uses Existing Building
• Buses on Vassal Lane
• Cars on Concord Ave
• Service and Parking at Site
Interior
• Playing Fields on East Side
NORTH
GYM REMOVED, ADDITION TO NORTH
RENOVATION / ADDITION
VIEW FROM SOUTHEAST CORNER
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
25
OPTION 2: WINGS
BUILDING ORIENTED AROUND A COURTYARD
NORTH
• All New Building
• On-site Drive Aisle for Buses
and Cars
• Service and Parking at Site
Interior
• Playing Fields on South Side
WINGS
VIEW FROM SOUTHEAST CORNER
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
27
OPTION 3: PAVILIONS
SCHOOLS CONNECTED BY COMMON SPACE
VASSAL
PRESCHOOL
COMMON
AREAS
ADMIN
& GYM
TOBIN
TOBIN
Draft Image
• All New Building
• On-site Drive Aisle for Buses
and Cars
• Service and Parking at Site
Interior
• Playing Fields on West Side
NORTH
PAVILIONS
VIEW FROM SOUTHEAST CORNER
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
29
OPTION COMPARISON
RENOVATION / ADDITION
WINGS
PAVILIONS
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
30
FRONTAGE
RENOVATION / ADDITION
WINGS
PAVILIONS
COMMUNITY PRESENCE
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
31
SETBACK
RENOVATION / ADDITION
WINGS
PAVILIONS
COMMUNITY PRESENCE
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
32
OPEN SPACE
RENOVATION ADDITION: 5.4 ACRES
WINGS: 5.4 ACRES
PAVILIONS: 5.2 ACRES
GOAL = 5 ACRES PROTECTED
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
33
MASSING
RENOVATION / ADDITION
WINGS
PAVILIONS
3 story
2 story
1 story
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
34
COMMUNITY SPACE
RENOVATION / ADDITION
WINGS
PAVILIONS
COMMUNITY PRESENCE
AUDITORIUM
CAFETERIA
GYMNASIUM
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
35
SITE CIRCULATION
RENOVATION / ADDITION
WINGS
PAVILIONS
PEDESTRIAN / BICYCLE
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
36
SITE CIRCULATION
RENOVATION / ADDITION
WINGS
PAVILIONS
VEHICULAR
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
37
PICK-UP PARKING
AFTERNOON PEAK
EXISTING CONDITION
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
38
PICK-UP PARKING
RENOVATION / ADDITION
WINGS
PAVILIONS
AFTERNOON PEAK
EXISTING CONDITION
NORTH
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
39
SUSTAINABILITY STUDIES
PHOTOVOLTAIC POTENTIAL
ENERGY LOAD – CAMBRIDGE SCHOOL
OUTDOOR COMFORT
Annual End-Use Breakdown by Energy
Consumption (MMBtu)
95,000 SF
PV Panel Area to Meet Energy Needs on Site
110,000 SF
Ave Building Footprint
CARBON FOOTPRINT
EUI:
22
kBtu/SqFt/Yr
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
40
NEXT STEPS
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
41
December 2019
Stakeholder and Community
Meetings
January 2020
Preferred Option Selected
February 2020
Stakeholder Meetings
March 2020
Feasibility Study Complete
LOOK AHEAD
PERKINS EASTMAN TOBIN MONTESSORI/VASSAL LANE SCHOOLS PROJECT
42