An application was received from Anthony Papatonis, requesting permission for a curb cut at the premises numbered 159 Allston Street; said petition has received approval from Inspectional Services, Traffic, Parking and Transportation, Historical Commission and Public Works. Response has been received from the neighborhood association. CHARTER RIGHT EXERCISED BY COUNCILLOR CARLONE IN COUNCIL OCTOBER 5, 2020
General Information
Attestation
Attachments (12)
Curb Cut
78240
Status: Active
Submitted: Jun 24, 2020
Applicant
Anthony Papantonis
[phone removed] or [phone removed]
[email removed]
Location
159 Allston St
Cambridge, MA 02139
Frontage (in feet)
43
Setback - distance from building to sidewalk (in feet)
8
Distance from proposed driveway to surrounding structures
and property line (in feet)
0.5
Length of proposed driveway (in feet)
95
Width of proposed driveway (in feet)
10
Size of proposed driveway (square feet)
950
Location of any trees, sign posts, fire hydrants, utility poles, etc., in direct vicinity of proposed driveway
Existing utility pole located at the opposite corner of the property line (front) and an existing "no parking/street sweeping" sign
located 15' from the left corner of the proposed (new) curb cut. See attached photo's.
Full Name
Anthony N. Papantonis
Date
06/24/2020
pdf
pdf
pdf
pdf
pdf
pdf
pdf
pdf
pdf
Certified Plot Plan (survey)
Jun 24, 2020
Abutters Forms
Jun 24, 2020
Plan of Requested Conditions
Jun 24, 2020
Photographs of the property
Jun 24, 2020
Photo Two.pdf
Jun 24, 2020
Photo Three.pdf
Jun 24, 2020
McPhail Lot Survey.pdf
Jun 24, 2020
BZA Approval.pdf
Jun 24, 2020
BZA Registry of Deeds 1.pdf
Jun 24, 2020
Page 1 of 2
8/31/2020
https://cambridgema.viewpointcloud.io/
Timeline
pdf
pdf
pdf
BZA Registry of Deeds 2.pdf
Jun 24, 2020
BZA Registry of Deeds 3.pdf
Jun 24, 2020
Updated C101 Plan.pdf
Aug 14, 2020
Original Submission
Status: Issued June 24th 2020, 12:28 pm
Review for Completeness
Status: Completed August 14th 2020, 10:52 am
Assignee: Sean O'Grady
Sean O'Grady June 24th 2020, 1:30:27 pm
Your parking special permit is conditioned on conformance with the plans shown the Board of Zoning Appeal, except that there be
two, rather than three, parking spaces. Please provide a conforming plan.
Anthony Papantonis August 14th 2020, 10:00:54 am
Sean, I uploaded a revised C101 Layout Plan that is in conformance with BZA approval (showing two parking spaces) for your
review and approval. Please feel free to call with any questions at [phone removed]. Thank you.
Zoning Review
Status: Completed August 14th 2020, 10:52 am
Assignee: Sean O'Grady
City Clerk Review
Status: In Progress
Assignee: Lori Perez
Traffic & Parking Department Review
Status: Pending
Department of Public Works Review
Status: Pending
City Clerk Review for City Council Agenda
Status: Pending
City Council Approval
Status: Pending
Department of Public Works - Next Steps
Status: Pending
Page 2 of 2
8/31/2020
https://cambridgema.viewpointcloud.io/
SHEET
PROJECT
PROJECT:
SCALE
DRAWN
DATE
SUBJECT
THIS DESIGN AND THE DRAWINGS
THEREFORE, PREPARED FOR THIS PROJECT,
ARE THE PROPERTY OF THE ARCHITECT,
GREENSTAXX LLC., AND, THE DESIGN AND/OR
DRAWINGS MAY NOT BE USED IN WHOLE OR IN
PART FOR ANY USE OTHER THAN FOR THE
ORIGINAL PROJECT FOR WHICH THE DESIGN
AND/OR DRAWINGS WERE PREPARED,
WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE ARCHITECT,
GREENSTAXX LLC. NO BUILDING PERMIT
SHALL BE ISSUED BY ANY BUILDING
DEPARTMENT, UNLESS THIS DOCUMENT
BEARS THE ORIGINAL SEAL AND SIGNATURE
OF THE ARCHITECT, GREENSTAXX LLC.
Unpublished work
©/Copyright 2016
Oaktree-GSX LLC
Project
Number
09/04/19
Author
Cover Sheet
159 Allston St
Approver
0
REV. NO
DESCRIPTION OF REV.
REV. DATE
159 Allston Street
Client- Geraldine Small and Edward Small
Area Schedule (Gross Building)
Name
Area
Type
Level &
Type
Back Porch Area
98 SF
Open
Space
L1
Back Yard
518
SF
Open
Space
L1
Side Yard
538
SF
Open
Space
L1
Level 1 Entrance
Area
108
SF
L1
Ramp Area
136
SF
L1
Driveway/
Parking
1310
SF
L1
TD Level 1
1365
SF
L1 Gross
TD Level 2
1423
SF
L2 Gross
TD Level 3
1423
SF
L3 Gross
DN
10' - 6"
8' - 0"
8' - 0"
8' - 0"
16' - 10"
6' - 9"
43' - 6"
43' - 0"
6' - 2"
3' - 9"
9' - 3"
4' - 0"
4' - 0"
6' - 0"
RIGHT OF WAY
PERMEABLE
PAVERS
151 Allston
+25"
+19"
167 Allston
+23"
8.3% Slope
8.3% Slope
+44"
PATIO
+37"
+30"
+22"
17' - 1"
18' - 1"
15' - 0"
54' - 5"
48' - 9"
26' - 4"
10' - 9"
4' - 5"
12' - 4"
1' - 6"
5' - 0"
SHEET
PROJECT
PROJECT:
SCALE
DRAWN
DATE
SUBJECT
THIS DESIGN AND THE DRAWINGS
THEREFORE, PREPARED FOR THIS PROJECT,
ARE THE PROPERTY OF THE ARCHITECT,
GREENSTAXX LLC., AND, THE DESIGN AND/OR
DRAWINGS MAY NOT BE USED IN WHOLE OR IN
PART FOR ANY USE OTHER THAN FOR THE
ORIGINAL PROJECT FOR WHICH THE DESIGN
AND/OR DRAWINGS WERE PREPARED,
WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE ARCHITECT,
GREENSTAXX LLC. NO BUILDING PERMIT
SHALL BE ISSUED BY ANY BUILDING
DEPARTMENT, UNLESS THIS DOCUMENT
BEARS THE ORIGINAL SEAL AND SIGNATURE
OF THE ARCHITECT, GREENSTAXX LLC.
Unpublished work
©/Copyright 2016
Oaktree-GSX LLC
3/32" = 1'-0"
Project
Number
08/06/19
Author
Site Measurements
159 Allston St
Approver
A103
REV. NO
DESCRIPTION OF REV.
REV. DATE
3/32" = 1'-0"
1
Site 1
Area Schedule (Gross Building)
Name
Area
Type
Level &
Type
Back Porch Area
98 SF
Open
Space
L1
Back Yard
518
SF
Open
Space
L1
Side Yard
538
SF
Open
Space
L1
Level 1 Entrance
Area
108
SF
L1
Ramp Area
136
SF
L1
Driveway/
Parking
1310
SF
L1
TD Level 1
1365
SF
L1 Gross
TD Level 2
1423
SF
L2 Gross
TD Level 3
1423
SF
L3 Gross
E
E
E
E
E
E
E
E
S
S
S
N52°38'02"W
16.80'
S39°06'23"W
7.00'
S75°14'27"W
43.70'
S38°31'29"W
68.50'
S52°38'02"E
43.00'
N38°31'29"E
110.00'
GATE
GATE
N/F
CAMBRIDGE COMMUNITY
HOUSING, INC.
BK. 24029 PG. 88
3 STORY
WOOD
NO. 151-157
N/F
ALBERTO ABADIE
BK. 47781 PG. 108
N/F
TRACY P. VERA, TRUSTEE OF
ALLSTON STREET TRUST
BK. 24881 PG. 453
N/F
TRACY P. VERA, TRUSTEE
OF 169 ALLSTON STREET
REALTY TRUST
BK. 56436 PG. 6
3 STORY
WOOD
NO. 163
3 STORY
WOOD
NO. 169
BIT. CONC.
PAVEMENT
BIT. CONC.
PAVEMENT
WINDOW
WELL (TYP)
WOOD
FENCE
PATIO
CHAIN LINK
FENCE
COMMON RIGHT
OF WAY
PLAN 511 OF 1953
SEWER
CLEANOUT
R=22.91
STONE PAVERS
CHAIN LINK
FENCE
DRILL
HOLE
FOUND
DRILL
HOLE
FOUND
O
S
W
GG
HH
HH
GG
GG
O
S
W
23.13
23.16
23.26
23.05
23.10
23.22
23.02
22.95
22 86
22.93
23.08
23.11
22.84
22.68
22.80
23.1
23.14
BENCHMARK
OWER CORNER
CONCRETE
STEP
TY OF
DATUM)
22.76
22.80
22.76
22.74
23.22
23.23
23.11
22.71
22.76
22.70
22.67
22.66
22.39
22.80
22.8
22.83
22.71
22.86
23.01
23.23
23.1
22.93
22.78
22.65
22.6
22.67
GAS
METER
23.5
22.60
D
22.62
22.25
22.22
22.5
22.2
21.9
22.0
22.3
22.3
22.62
23.01
22.71
22.70
GAS
METER
22.70
ELECTRIC
METER
DN
8' - 0"
8' - 0"
8' - 0"
SHEET
PROJECT
PROJECT:
SCALE
DRAWN
DATE
SUBJECT
THIS DESIGN AND THE DRAWINGS
THEREFORE, PREPARED FOR THIS PROJECT,
ARE THE PROPERTY OF THE ARCHITECT,
GREENSTAXX LLC., AND, THE DESIGN AND/OR
DRAWINGS MAY NOT BE USED IN WHOLE OR IN
PART FOR ANY USE OTHER THAN FOR THE
ORIGINAL PROJECT FOR WHICH THE DESIGN
AND/OR DRAWINGS WERE PREPARED,
WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE ARCHITECT,
GREENSTAXX LLC. NO BUILDING PERMIT
SHALL BE ISSUED BY ANY BUILDING
DEPARTMENT, UNLESS THIS DOCUMENT
BEARS THE ORIGINAL SEAL AND SIGNATURE
OF THE ARCHITECT, GREENSTAXX LLC.
Unpublished work
©/Copyright 2016
Oaktree-GSX LLC
1/16" = 1'-0"
Project
Number
08/13/19
Author
Site Survey and Building
159 Allston St
Approver
A104
REV. NO
DESCRIPTION OF REV.
REV. DATE
1/16" = 1'-0"
1
Site 2
ALLSTON STREET
S
DOM
FIRE
D
D
D
D
D
D
INSP
ETC
D
D
D
D
D
ARBORRITAE BUSHES
(BETWEEN BOULDERS)
SEE LANDSCAPE PLAN
WYE SEWER SERVICE
CONNECTION
INV=14.6
(INVERT TO BE CONFIRMED BY
CONTRACTOR)
TRENCH
INFILTRATION GALLEY CULTEC CHAMBER
(17.5'X11.67'X4.04)
INV. IN=20.80
INV. OUT(1) =19.06 (3" CPE)
INV. OUT (2) = 20.20 (6" CPE)
BOTTOM OF CHAMBER=18.56
BOTTOM OF STONE=16.56
INSPECTION PORT
DMH 1
R=22.69
INV.IN=19.02 (3")
INV.IN=20.16 (6")
INV.OUT=18.60 (6")
POROUS BITUMINOUS
ASPHALT PAVEMENT
PERMEABLE PAVERS
CUT & CAP
3
C501
WATER SERVICE
CONNECTION
DARK STONE
SEE LANDSCAPE PLANS
INSERT-A-TEE DRAINAGE
CONNECTION
INV=17.70
CEMENT CONCRETE
SIDEWALK
INV=20.93
2
C501
1
C501
9
C501
1
C101
5
C501
4
C501
6
C501
11
C501
BOLLARD TYP.
SEE LANDSCAPE PLANS
REMOVE
EXIST. CURB
AREA DRAIN 3
R=22.55
INV.IN=20.82 (4")
INV.OUT=20.72 (4")
8
C501
AREA DRAIN 2
R=22.80
INV.IN=21.10 (4")
INV.OUT=21.20 (4")
8
C501
AREA DRAIN 1
R=22.97
INV=21.48 (4")
8
C501
RESET VERTICAL GRANITE
CURB
10
C501
PROP. 2 STAIRS
@6.5" EO
23.18
23.27
24.40
24.08
23.83
23.73
23.69
23.14
23.21
23.10
23.10
22.90
22.60
22.35
22.17
22.54
22.82
22.70
22.70
22.75
22.86
23.10
22.80
22.80
22.74
22.80
23.79
22.90
STANDARD PARKING
STALL (TYP)
13
C501
VERTICAL GRANITE CURB9
C501
CONCRETE PAVERS SET IN GRAVEL
SEE LANDSCAPE PLANS
GRAVEL
SEE LANDSCAPE PLANS
BBQ DECK CONCRETE PAVERS
SEE LANDSCAPE PLANS
"CAPE COD" CURB
(BITUMINOUS)
BIKE RACKS
SEE LANDSCAPE PLANS
TREX STYLE PLANKS ON RAMP
SEE LANDSCAPE PLANS
INV=15.17
POROUS BITUMINOUS
ASPHALT PAVEMENT
1
C101
TRASH AREA
17.1'
8.0'
8.0'
10.0'
BUSHES & BOULDERS
SEE LANDSCAPE PLANS
7
C501
23.00
23.10
22.86
22.95
LIMIT OF 1" MILL AND
OVERLAY
LIMIT OF 1" MILL AND
OVERLAY
DR BY:
CHK BY:
PROJ NO:
DATE:
SCALE:
SHT NO:
SHEET NAME:
STAMP:
REV
DESCRIPTION
DATE
PROJECT INFO
PROJECT TEAM
NORTH
159 Allston Street
Cambridge, MA
1.
DPW REVIEW
7/7/20
2.
PARKING SP. REMOVED
8/12/20
LAYOUT &
MATERIALS
PLAN
C101
GS
SS
2019-084
03/06/2020
1"=10'
10
SCALE: 1" = 10'
0
20
30
40
LEGEND
DRAIN LINE
ELECTRIC, TEL. & CABLE LINE
FIRE SUPRESSION LINE
GAS LINE
SEWER LINE
ETC
D
FIRE
GAS
S
16.38
SPOT GRADE
W.G.
WATER GATE
G.G.
GAS GATE
TEST PIT
DOMESTIC WATER LINE
DOM
EXISTING:
PROPOSED:
STOCKADE
CONTOUR
WV
32
TC,BC
TW,BW
CONIFEROUS TREE
T
TELEPHONE MANHOLE
COMBINED SEWER & DRAIN
CS
STEAM LINE
ST
OHW
ELECTRIC LINE
T
DRAIN LINE
GAS LINE
WATER LINE
D
W
G
S
SANITARY SEWER
TELEPHONE LINE
MAIL BOX
TRAFFIC SIGNAL
PARKING METER
WASTE BASKET
ELECTRIC MANHOLE
E
D
S
DRAIN MANHOLE
SANITARY MANHOLE
U
WG
GG
WATER GATE
DECIDUOUS TREE
FIRE HYDRANT
CATCH BASIN
PLANTER
20.85
+
SPOT GRADE
UTILITY POLE
GAS GATE
UNKNOWN MANHOLE
MB
PM
WB
TS
TOP OF CURB, BOTTOM OF CURB
TOP OF WALL, BOTTOM OF WALL
INSPECTION PORT
CLEAN OUT
PIPE MATERIALS:
SANITARY SEWER: 6" PVC ASTM D3034-SDR 35.
WATER: DOMESTIC: TO BE CONFIRMED BY MEP.
FIRE: TO BE CONFIRMED BY MEP.
ALL WATER LINES SHALL HAVE A MINIMUM OF 5 FEET
OF COVER.
4" POROUS ASPHALT LAYER
UNCOMPACTED SUBGRADE
4" LAYER OF 3/4" CRUSHED STONE
8" LAYER OF OPEN GRADED
4" LAYER OF 3/4" CRUSHED STONE
RESERVOIR SUBBASE
20"
NOTES:
1. CONTRACTOR SHALL NOT COMPACT SUBGRADE MATERIALS BELOW AREAS OF
POROUS PAVEMENT.
2. SEE OPERATION AND MAINTENANCE PLAN FOR MAINTENANCE REQUIREMENTS
OF POROUS PAVEMENT AREAS.
NOT TO SCALE
POROUS BITUMINOUS ASPHALT PAVEMENT
1
ALLSTON STREET
S
DOM
FIRE
D
D
D
D
D
D
INSP
ETC
D
D
D
D
D
ARBORRITAE BUSHES
(BETWEEN BOULDERS)
SEE LANDSCAPE PLAN
WYE SEWER SERVICE
CONNECTION
INV=14.6
(INVERT TO BE CONFIRMED BY
CONTRACTOR)
TRENCH
INFILTRATION GALLEY CULTEC CHAMBER
(17.5'X11.67'X4.04)
INV. IN=20.80
INV. OUT(1) =19.06 (3" CPE)
INV. OUT (2) = 20.20 (6" CPE)
BOTTOM OF CHAMBER=18.56
BOTTOM OF STONE=16.56
INSPECTION PORT
DMH 1
R=22.69
INV.IN=19.02 (3")
INV.IN=20.16 (6")
INV.OUT=18.60 (6")
POROUS BITUMINOUS
ASPHALT PAVEMENT
PERMEABLE PAVERS
CUT & CAP
3
C501
WATER SERVICE
CONNECTION
DARK STONE
SEE LANDSCAPE PLANS
INSERT-A-TEE DRAINAGE
CONNECTION
INV=17.70
CEMENT CONCRETE
SIDEWALK
INV=20.93
2
C501
1
C501
9
C501
1
C101
5
C501
4
C501
6
C501
11
C501
BOLLARD TYP.
SEE LANDSCAPE PLANS
REMOVE
EXIST. CURB
AREA DRAIN 3
R=22.55
INV.IN=20.82 (4")
INV.OUT=20.72 (4")
8
C501
AREA DRAIN 2
R=22.80
INV.IN=21.10 (4")
INV.OUT=21.20 (4")
8
C501
AREA DRAIN 1
R=22.97
INV=21.48 (4")
8
C501
RESET VERTICAL GRANITE
CURB
10
C501
PROP. 2 STAIRS
@6.5" EO
23.18
23.27
24.40
24.08
23.83
23.73
23.69
23.14
23.21
23.10
23.10
22.90
22.60
22.35
22.17
22.54
22.82
22.70
22.70
22.75
22.86
23.10
22.80
22.80
22.74
22.80
23.79
22.90
STANDARD PARKING
STALL (TYP)
13
C501
VERTICAL GRANITE CURB9
C501
CONCRETE PAVERS SET IN GRAVEL
SEE LANDSCAPE PLANS
GRAVEL
SEE LANDSCAPE PLANS
BBQ DECK CONCRETE PAVERS
SEE LANDSCAPE PLANS
"CAPE COD" CURB
(BITUMINOUS)
BIKE RACKS
SEE LANDSCAPE PLANS
TREX STYLE PLANKS ON RAMP
SEE LANDSCAPE PLANS
INV=15.17
POROUS BITUMINOUS
ASPHALT PAVEMENT
1
C101
TRASH AREA
17.1'
8.0'
8.0'
10.0'
BUSHES & BOULDERS
SEE LANDSCAPE PLANS
7
C501
23.00
23.10
22.86
22.95
LIMIT OF 1" MILL AND
OVERLAY
LIMIT OF 1" MILL AND
OVERLAY
DR BY:
CHK BY:
PROJ NO:
DATE:
SCALE:
SHT NO:
SHEET NAME:
STAMP:
REV
DESCRIPTION
DATE
PROJECT INFO
PROJECT TEAM
NORTH
159 Allston Street
Cambridge, MA
1.
DPW REVIEW
7/7/20
2.
PARKING SP. REMOVED
8/12/20
LAYOUT &
MATERIALS
PLAN
C101
GS
SS
2019-084
03/06/2020
1"=10'
10
SCALE: 1" = 10'
0
20
30
40
LEGEND
DRAIN LINE
ELECTRIC, TEL. & CABLE LINE
FIRE SUPRESSION LINE
GAS LINE
SEWER LINE
ETC
D
FIRE
GAS
S
16.38
SPOT GRADE
W.G.
WATER GATE
G.G.
GAS GATE
TEST PIT
DOMESTIC WATER LINE
DOM
EXISTING:
PROPOSED:
STOCKADE
CONTOUR
WV
32
TC,BC
TW,BW
CONIFEROUS TREE
T
TELEPHONE MANHOLE
COMBINED SEWER & DRAIN
CS
STEAM LINE
ST
OHW
ELECTRIC LINE
T
DRAIN LINE
GAS LINE
WATER LINE
D
W
G
S
SANITARY SEWER
TELEPHONE LINE
MAIL BOX
TRAFFIC SIGNAL
PARKING METER
WASTE BASKET
ELECTRIC MANHOLE
E
D
S
DRAIN MANHOLE
SANITARY MANHOLE
U
WG
GG
WATER GATE
DECIDUOUS TREE
FIRE HYDRANT
CATCH BASIN
PLANTER
20.85
+
SPOT GRADE
UTILITY POLE
GAS GATE
UNKNOWN MANHOLE
MB
PM
WB
TS
TOP OF CURB, BOTTOM OF CURB
TOP OF WALL, BOTTOM OF WALL
INSPECTION PORT
CLEAN OUT
PIPE MATERIALS:
SANITARY SEWER: 6" PVC ASTM D3034-SDR 35.
WATER: DOMESTIC: TO BE CONFIRMED BY MEP.
FIRE: TO BE CONFIRMED BY MEP.
ALL WATER LINES SHALL HAVE A MINIMUM OF 5 FEET
OF COVER.
4" POROUS ASPHALT LAYER
UNCOMPACTED SUBGRADE
4" LAYER OF 3/4" CRUSHED STONE
8" LAYER OF OPEN GRADED
4" LAYER OF 3/4" CRUSHED STONE
RESERVOIR SUBBASE
20"
NOTES:
1. CONTRACTOR SHALL NOT COMPACT SUBGRADE MATERIALS BELOW AREAS OF
POROUS PAVEMENT.
2. SEE OPERATION AND MAINTENANCE PLAN FOR MAINTENANCE REQUIREMENTS
OF POROUS PAVEMENT AREAS.
NOT TO SCALE
POROUS BITUMINOUS ASPHALT PAVEMENT
1
159 Allston Street
Legend
159 Allston St
7.26 ft
N
➤
N
© 2020 Google
© 2020 Google
159 Allston Street
Legend
159 Allston St
6.32 ft
N
➤
N
© 2020 Google
© 2020 Google
159 Allston Street
Legend
159 Allston St
Cambridge Housing Authority- LBJ Apartments
Magazine St @
5.33 ft
N
➤
N
© 2020 Google
© 2020 Google