Search ▸ Agenda item attachment
COF 2026-84 · Agenda item attachment · Jun 2 2026
A communication was received from Melissa Peters, Assistant City Manager for Community Development, transmitting a presentation related to Cambridge Street zoning.
COF 2026-84
FIRST IN COUNCIL
June 2, 2026
City of Cambridge
A true copy;
ATTEST:-
Paula M. Crane,
Interim City Clerk
City of Cambridge
A communication was received from Melissa Peters, Assistant City Manager for Community
Development, transmitting a presentation related to Cambridge Street zoning.
Working
Group
January 2024
Neighborhood &
Long-term Planning
Committee Meeting:
Cambridge Street
06/02/26
DISCUSSION TOPICS FOR CAMBRIDGE STREET
1. Urban Form
2. Open Space
3. Design review
4. Non-residential Uses
URBAN FORM: Current zoning includes design standards to improve the public realm
3
Existing narrow sidewalks on
Cambridge Street.
If new development occurs, look for
opportunities to gain additional publicly
accessible space along the sidewalk.
•
Small setbacks are required for new construction to allow for additional pedestrian space and amenities
where appropriate. This reflects the recommendations of Citywide Urban Design Guidelines.
•
Additional sidewalk could also be used to enhance plantings or to provide enhanced ADA accessibility.
•
A development over 25K sf must plant street trees subject to DPW approval and in accordance with the
Urban Forest Master Plan.
4’ setback
URBAN FORM – Current zoning allows six stories on most of Cambridge St
4
URBAN FORM – Setbacks were discussed and included for buildings over six stories.
5
A step-back after the fourth story introduces more
dimensional restrictions than the multifamily zoning and
would result in smaller upper story floorplates. This could
compromise the amount of affordable housing units.
Six story building with a 10ft
step-back after the fourth story
URBAN FORM – There are current zoning standards for Upper Story Setbacks, aka “step-
backs”
6
•
Site plan standards table
identifies where step-back
(also called “Upper Story
Setbacks") are required by
district.
•
Currently, step-backs only
exist in CAM-10 and CAM-12
districts.
Minimum Upper Story Setbacks in feet for Cambridge St Districts
CAM-6
CAM-10
CAM-12
Setback from Primary Street
– Cambridge St, Hampshire
St or Prospect St
None
14’ above 75’
44’ above 100’
14’ above 75’
44’ above 100’
Setback from Primary Street
– Monsignor O’Brien Highway
or North First St
None
14’ above 100’
14’ above 100’
Setback from Secondary
Street
None
10’ above 100’
12’ above 75’
32’ above 100’
Setback from Residence
District Boundary
None
None
15’ above 75’
4 STORIES
6 STORIES
Existing single-story buildings were modeled at 4 and 6 stories to show additional maximum
shadows (winter solstice) illustrated in pink.
URBAN FORM – Shadow studies from Our Cambridge Street plan
8
3-STORIES – Existing context
6-STORIES – Allowable height
URBAN FORM: Massing and shadow comparison – 3 vs 6 story buildings
CREATING POCKET PARKS
9
•
Height is used to incentivize pocket parks in the zoning. Any development above 6
stories is required to provide 15% publicly accessible open space.
•
Since the height is limited to 6 stories for most of the corridor, that largely applies to the
Lechmere (CAM-10) and Webster/Windsor (CAM-12) sub-districts.
•
There are different ways property owners can contribute towards providing a meaningful
public realm – both permanent and flexible temporary spaces.
STEWARDSHIP - MINI PLAZA
TEMPORARY - PARKING LOT
ON-SITE – 15% OPEN SPACE
Cambridge Street Court/Yard - A temporary pocket park on City-owned land
Before – An vacant gravel lot owned by the City
that was inactive space.
After – A City-owned pocket park with planting, shade,
flexible seating and tables. In the future it will transform
into a permanent park
DESIGN REVIEW FOR NEW DEVELOPMENT OVER 4 STORIES
11
•
Cambridge Street Districts are considered “Areas of Special Planning Concern”.
Most development must go through some kind of advisory review:
•
Staff Advisory Consultation: 0-2,000 sf (non-residential only)
•
Public Advisory Consultation: 2,000-50,000 sf
•
Planning Board Advisory Consultation: 50,000-75,000 sf
•
Buildings over 4 stories would require, at least, a Public Advisory Consultation.
This is a public meeting with public comment and staff comment.
•
Residential uses greater than 75,000 sf need a project review special permit.
Building Use
• This is an allowed use in most districts except residential
districts.
• There are other building/fire code regulations that would
apply differently depending on size of building and type
of use.
Building Size
• New lab buildings require building footprints that are too
large for the vast majority parcels on Cambridge St.
• Most parcels on Cambridge St are only 100 feet deep.
• Lab uses are limited to a height of 3 stories or 35 feet.
• Non-residential uses are limited to an FAR of 1.0
LAB USES ON CAMBRIDGE STREET
Existing 3-story lab building on Cambridge Street. It was
formerly an office building.
ENCOURAGING LOCAL RETAIL
13
While zoning cannot regulate businesses by ownership, e.g. chains vs. local, the city
does provide a variety of programs that are aimed at local businesses including
financial and educational/technical support.
Financial:
•
Storefront Improvement Program
Reimburses funding for exterior façade renovations and ADA accessibility upgrades.
•
Small Business Enhancement Program
Offers reimbursement grants to retail, restaurant, home-based, and creative
businesses for equipment, marketing materials, or interior improvements.
•
Retail Interior Accessibility Program
Supports interior renovations making businesses more sensory and physically
accessible
•
Small Business E-Commerce Program
Supports online and digital marketing improvements.
ENCOURAGING LOCAL RETAIL
14
Educational/Technical Support:
•
Small Business Coaching Program
Provides eligible small businesses with up to 4 hours of free, one-on-one sessions with
industry experts in financial planning, restaurant operations, marketing, legal setups,
succession planning, and more .
•
Business Development Workshops
Free, city-organized workshops cover topics such as marketing, social media, supplier
diversity, e-commerce, accounting, and starting a business. These are open to all
Cambridge small businesses.
•
Small Business Succession Planning Program
Offers resources and events to help business owners transition ownership—via selling,
employee buyouts, or succession strategies.
•
Site Search and Vacant Storefront Program
Track ground floor vacant storefront data, provide site location services to businesses
interested in locating or expanding in Cambridge, and connect eligible businesses to the
Vacant Storefront Tax Program (state program).
THANKS!