CMA 2023-144

The third annual Cycling Safety Ordinance (CSO) Progress Report

How it started
May 22, 2023 · Submitted by Yi-An Huang, City Manager.
What happened
May 22, 2023 · 📁 Placed on file. This was an informative report; there were no decisions to make. (unanimous)

Voted yes (9), unanimous

  • Burhan Azeem
  • Dennis Carlone
  • Alanna Mallon
  • Marc McGovern
  • Patty Nolan
  • E. Denise Simmons
  • Paul F. Toner
  • Quinton Zondervan
  • Sumbul Siddiqui
Roll call of May 22, 2023 · from the council’s minutes · photos: City of Cambridge
What’s next
🚪 End of the line: filing closes the matter. Nothing further is scheduled.
The document Agenda item attachment · 21 pages

3 Introduction Cambridge’s Cycling Safety Ordinance sets ambitious requirements for the installation of about 25 miles of separated bike lanes between 2020 and 2027. The Ordinance requires annual progress reports on improvements made each year. Many deadlines and timelines set out in the Ordinance follow a “Separated Bike Lane Year” between May 1 and April 30. This third annual report: • Details improvements made in Separated Bike Lane Year 3 (May 1, 2022 to April 30, 2023) • Outlines the work planned for Separated Bike Lane Year 4 (May 1, 2023 to April 30, 2024)

Installation Summary

• In Year 1, we completed or started construction on 4.12 miles of separated bike lanes. • In Year 2, we completed or started construction on 2.11 miles of separated bike lanes. • In Year 3, we completed or started construction on 3.58 miles of separated bike lanes. • In Year 4, we plan to install or begin construction on 4.73 miles of separated bike lanes. Streets where Cambridge has installed or started construction on separated bike lanes as part of the Cycling Safety Ordinance.

4 Background In 2019, the Cambridge City Council passed the Cycling Safety Ordinance. The Ordinance requires that the City construct separated bike lanes on streets designated for “greater separation” in Cambridge’s Bicycle Network Vision, if the street is being reconstructed as part of the City’s Five Year Plan for Streets and Sidewalks.

In 2020, the Council passed amendments to the Ordinance, setting ambitious requirements for the installation of approximately 25 miles of separated bikes lanes within five to seven years. The location of these facilities will be informed by both the Cambridge Bicycle Network Vision and specific requirements in the Ordinance.

In general, the Ordinance requires the installation of separated bike lanes on: • All of Massachusetts Avenue • Broadway from Quincy Street to Hampshire Street • Cambridge Street from Oak Street to Second Street • Hampshire Street from Amory Street to Broadway • Garden Street, eastbound from Huron Avenue to Berkeley Street, and westbound from Mason Street to Huron Avenue The Ordinance also requires that the City install 11.6 more miles of separated bike lanes in other locations that are part of the Bicycle Network Vision.

5 In its requirements and timelines, the Ordinance distinguishes between quick-build and construction. Quick-build methods include pavement markings, flex-posts, signage, and signal changes, and can usually be installed in the course of a few weeks or months. The City reports quick-build separated bike lane mileage in the year that the project is installed. Construction involves more extensive changes, including potentially moving curbs and/ or removing medians.

Work becomes more complex any time we dig into the ground, and construction projects may include work on the infrastructure (e.g., water, drainage and sewer pipes, traffic signals) that we have underground. Construction projects often take multiple years to complete, and the City reports constructed separated bike lane mileage in the year that construction begins. For additional information about the Cycling Safety Ordinance, please visit www.cambridgema.gov/cyclingsafetyordinance.

This page details the CSO’s specific requirements and the associated timelines and provides additional links to individual Cycling Safety Ordinance projects. Streets where the CSO requires separated bike lanes. 6

Work Completed During Separated Bike Lane Year 3:

May 1, 2022 through April 30, 2023

Between May 1, 2022, and April 30, 2023 (Bike Lane Year 3), we installed or began construction on 3.58 miles of separated bike lanes, bringing our total to 9.81 miles since May 1, 2020.

Summary Table

Brattle Street

Mason Street to

Sparks Street

(both directions) 0.63

Complete: Brattle

Street Safety

Phase 1

Garden Street

Eastbound: Huron Avenue to

Berkeley Street

Westbound: Mason Street to 1.25

Complete: Garden

Street Safety

Glacken Field

to Fresh Pond

Parkway (both

1.06

Under Construction:

and Cushing Plaza Cambridge Oak Street to

Prospect Street

(south side) Complete

Roseland Street

to Beech Street (both directions) 0.41

Complete: Porter

Square Safety

Memorial Drive

📊 From here the report is project tables and figures, which don’t survive text extraction faithfully. Read them in the original PDF.