TheCambridge Record
Agenda ItemsCity Manager's Agenda

CMA 2026-55

A response to Awaiting Report 26-08 relative to speed humps on Fayerweather Street

How it started
Mar 12, 2026 · Submitted by Yi-An Huang, City Manager.
What happened
Mar 16, 2026 · 📁 Placed on file. This was an informative report; there were no decisions to make. (unanimous · two absent)

Voted yes (7), unanimous

  • Ayah Al-Zubi
  • Burhan Azeem
  • Tim Flaherty
  • Marc McGovern
  • E. Denise Simmons
  • Jivan Sobrinho-Wheeler
  • Sumbul Siddiqui

Absent (2)

  • Patty Nolan
  • Cathie Zusy
Roll call of Mar 16, 2026 · from the council’s minutes · photos: City of Cambridge
What’s next
🚪 End of the line: filing closes the matter. Nothing further is scheduled.
The document Agenda item attachment · 1 page
🏛 The city's agenda for this meeting: Mar 16, 2026the city publishes no page for a single item: this one is a row on that agenda📄 Download original PDF

Subject: Awaiting Report 2026-08: Speed Humps on Fayerweather Street

In response to awaiting report 2026-08 requesting that the City Manager direct the appropriate City departments, including the Department of Transportation, to evaluate and install a series of speed humps along Fayerweather Street, with particular attention to the stretch between Walnut Street and Field Street, we report the following: In the fall of 2025, the City installed the first 9 speed humps at 5 locations as part of our initial pilot season of speed hump installations. While formal evaluations of the first round of speed humps have not been completed yet, we anticipate continuing with installations in the program. The first round of installations included:

Dover Street – 1 speed hump between the City Line and Mass Ave

Lakeview Avenue – 2 speed humps between Malcolm Rd and Worthington St

Field Street and Garden Street (near Universal Playground) – 3 speed humps- Field St (2 speed humps) between Fern St and Alpine St and Garden Street near Alpine Street (1 speed hump)

Reservoir Street – 1 speed hump between Huron Ave and Vassal Lane

Walden Street – 2 speed humps between Vassal Lane and Concord Ave

In the coming construction season, we plan to install 25 additional speed humps. Since the program was announced, we have received 400 requests for speed humps at 133 separate locations. We will be evaluating these requests based on various criteria including: traffic data (vehicle speeds and volumes); street width and grade; proximity to schools, hospitals and other sensitive land uses; crash history; part of a primary or secondary emergency response route. We will evaluate the request for this location on Fayerweather Street between Walden Street and Field Street as part of this process.

🗓 The meeting where this was taken up: Mar 16, 2026