CMA 2021-193

The Manager's report back on improvements to Jerry's Pond and along Rindge Avenue. PLACED ON THE TABLE BY MAYOR SIDDIQUI IN COUNCIL SEPTEMBER 13, 2021

How it started
Sep 13, 2021 · Submitted by Louis A. DePasquale, City Manager: his response to the Council’s order about improvements to Jerry's Pond and along Rindge Avenue. PLACED ON THE TABLE BY MAYOR SIDDIQUI IN COUNCIL SEPTEMBER 13, 2021 (AR 21-56).
What happened
Dec 20, 2021 · ▫ No action was taken (No action taken)

Voted yes (9), unanimous

  • Dennis Carlone
  • Patty Nolan
  • Jivan Sobrinho-Wheeler
  • Alanna Mallon
  • Marc McGovern
  • Sumbul Siddiqui
  • E. Denise Simmons
  • Timothy J. Toomey
  • Quinton Zondervan
Roll call of Dec 20, 2021 · from the city’s record · photos: City of Cambridge
Tabledset aside by voteSep 13, 2021
No action takenSep 20, 2021
No action takenSep 27, 2021
No action takenOct 4, 2021
No action takenOct 18, 2021
No action takenOct 25, 2021
No action takenNov 1, 2021
No action takenNov 8, 2021
No action takenNov 15, 2021
No action takenNov 22, 2021
No action takenDec 6, 2021
No action takenDec 13, 2021
No action takenDec 20, 2021
Referred for reportAR 2021-56Sep 13, 2021
Administration answeredCMA 2021-193Sep 13, 2021 · answered in 0 days

The item's path through the council, every recorded step. How the request pipeline works

City of Cambridge
Department of Public Works
Owen O'Riordan, Commissioner · 147 Hampshire Street · Cambridge, MA 02139 · [email protected] · Voice: 617 349 4800 · TDD: 617 499 9924
ToLouis A. DePasquale, City Manager
FromKatherine Watkins, Assistant Commissioner / City Engineer, DPW Iram Farooq, Assistant City Manager for Community Development Joe Barr, Director, Traffic, Parking and Transportation Department
DateSeptember 8, 2021
ReAwaiting Report Policy Order 2021 #167 regarding improvements around Jerry’s Pond and along Rindge Avenue

In response to the above-mentioned policy order, the Department of Public Works (DPW), Community Development Department (CDD), and Traffic, Parking and Transportation (TP&T) report the following:

The North Cambridge site containing Jerry’s Pond and its surrounding environs is owned by IQHQ. Much of the 26-acre site is enclosed by fencing, including Jerry’s Pond (also known as Jerry’s Pit). Jerry’s Pond is an artificial pond that was created about 1870 from a disused clay pit. The clay pit was subsequently filled with water and an icehouse was built around 1907. Though the property was privately owned, Jerry’s Pit was well known as a neighborhood swimming hole until the Francis J. McCrehan Pool opened in 1961. The property has housed other uses throughout its history, including manufacturing.

IQHQ has been working with the community and city staff, as they create their development plans for the site, including improvements for the area around Jerry’s Pond.

The IQHQ team has indicated that they share the goals of improving access to Jerry’s Pond, improving connections to nearby open spaces, and enhancing facilities for pedestrians and cyclists, while responsibly managing the environmental conditions on the site.

Key elements of the plan include:

Boardwalks along Rindge Avenue and the eastern side of Jerry’s Pond to provide opportunities for people to walk along the pond.

Picnic Areas for community use, with over 100 seats on benches and at picnic tables.

Scenic Overlook – a 35’ x 70’ accessible waterfront boardwalk plaza with protected mature trees in the decking.

Ecological Center – a roofed, open-air pavilion to support an education program run by Mass Audubon for school children and the community.

Communal Garden – providing a new communal garden and working with Green Cambridge to design and manage the garden.

MBTA Plaza Improvements – planting trees in raised beds in the MBTA paved plaza.

Alewife Brook Parkway – widening the existing sidewalk and adding a second interior path along the Parkway.

Interpretive Signage– including history of the area.

Rindge Ave – IQHQ has committed to making improvements for people walking and biking along Rindge Avenue, as well as crossing Rindge Avenue.

  • 400’ long boardwalk for pedestrian access along the pond.
  • Multi-use path along Rindge Avenue to accommodate 2-way bicycle traffic and pedestrians.
  • Additional trees on both sides of Rindge Avenue.
  • Crossings of Rindge Ave – The plan identifies improvements to the signalized crossing at the parking area, but the details of the improvements have not been finalized. City staff will continue to work with IQHQ and the community on this important issue as the design progresses to ensure the plan enhances the experience and safety for pedestrians and cyclists crossing Rindge Ave. Path Connections for Pedestrians and Cyclists – providing additional paths and enhancing existing paths to improve the connectivity between Linear Path, the MBTA headhouse and Minuteman Path.

In addition to the physical improvements, IQHQ has committed to the long-term operations and maintenance of the improvements and funding scholarships for low income residents ($500,000), and the Just-A-Start Biomedical Career Program for low income residents ($500,000).

The plan continues to evolve and improve based on extensive collaboration with the community, environmental professionals, a wildlife ecologist, city staff and continuing evaluation of tree impacts. The IQHQ plan appears to address the key goals of improving access around Jerry’s Pond, improving connections for people biking and walking through the area, enhancing Rindge Avenue, and protecting habitat areas, without requiring city funding. City staff will continue working with IQHQ as the plan is further developed and submitted to the Planning Board and the Conservation Commission for their review and approval.

Plan of Improvements Around Jerry’s Pond Rindge Avenue Cross-Section Looking Towards Alewife Brook Parkway

🗓 The meeting where this was taken up: Sep 13, 2021

↩ Answers awaiting report: Awaiting report 2021 · #56